Traffic monitoring site cabinet, remove existing cabinet unit price, Florida

Low bidders on FDOT contracts carried a median of $960.82 per EACH for item 0695-7600, traffic monitoring site cabinet, remove existing cabinet, over the 24 months to 28 OCT 2026, across 48 low bids. Half of all 250 bids fell between $755.47 and $1,234.78.

Owner
Florida DOT
Item
0695-7600
Unit
EACH
Latest letting
29 JUL 2026
$960.82Low bidder's median, per EACH
$961.41Median of all bids, per EACH
48Contracts in the window

By year of letting

Traffic monitoring site cabinet, remove existing cabinet, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20181414$353.3566$357.01
20191414$520.1467$500.00
20201212$515.0055$545.00
20212121$565.1582$547.05
20221818$699.9372$698.08
20231616$920.5046$1,050.36
20242222$1,005.0090$958.16
20252828$926.32150$936.32
20261414$974.4777$976.13
Traffic monitoring site cabinet, remove existing cabinet, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Traffic monitoring site cabinet, remove existing cabinet, FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 521$1,010.0094$1,108.43
District 410$879.4065$830.50
District 710$810.3356$885.33
District 33$810.0014$760.00
Traffic monitoring site cabinet, remove existing cabinet, FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Traffic monitoring site cabinet, remove existing cabinet, FDOT: low bidder's median by quantity band
Quantity (EACH)Low bidsLow-bid median
1 to 112$1,014.01
1 to 112$1,128.62
1 to 312$892.84
3 to 612$805.00
Traffic monitoring site cabinet, remove existing cabinet, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Traffic monitoring site cabinet, remove existing cabinet
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
29 JUL 2026T5891District 51$905.10$986.484MASCI GENERAL CONTRACTORS, INCFDOT
10 JUN 2026T7534District 72$812.54$925.774PREFERRED MATERIALS INC.FDOT
20 MAY 2026T4666District 43$1,005.08$831.058OHLA USA INCFDOT
20 MAY 2026T5863District 51$915.00$1,156.916MASCI GENERAL CONTRACTORS, INCFDOT
20 MAY 2026T7587District 72$808.12$904.005HUBBARD CONSTRUCTION COMPANYFDOT
20 MAY 2026T7595District 72$986.10$975.288C.W. ROBERTS CONTRACTING, INC.FDOT
29 APR 2026T5880District 51$1,037.00$1,167.003HALIFAX PAVING, INC.FDOT
29 APR 2026T5881District 51$1,010.00$1,142.502MASCI GENERAL CONTRACTORS, INCFDOT
29 APR 2026T7562District 71$790.00$600.007WATSON CIVIL CONSTRUCTION, INC.FDOT
29 APR 2026T7611District 72$756.98$801.709PREFERRED MATERIALS INC.FDOT
25 MAR 2026T5876District 51$962.83$946.996TIMOTHY ROSE CONTRACTING, INC.FDOT
25 MAR 2026T5877District 51$999.00$999.003MASCI GENERAL CONTRACTORS, INCFDOT
28 JAN 2026T5874District 53$1,500.00$1,500.005MASCI GENERAL CONTRACTORS, INCFDOT
28 JAN 2026T7577District 71$1,050.00$1,112.737WATSON CIVIL CONSTRUCTION, INC.FDOT
03 DEC 2025T3994District 31$932.64$770.005ANDERSON COLUMBIA CO., INC.FDOT
Latest FDOT contracts carrying Traffic monitoring site cabinet, remove existing cabinet

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy