Vehicular traffic signal, furnish & install aluminum, 5 section straight, 1 way unit price, Florida
Low bidders on FDOT contracts carried a median of $2,410.16 per AS for item 0650-1-18, vehicular traffic signal, furnish & install aluminum, 5 section straight, 1 way, over the 24 months to 28 OCT 2026, across 18 low bids. Half of all 110 bids fell between $2,176.97 and $2,686.57.
- Owner
- Florida DOT
- Item
- 0650-1-18
- Unit
- AS
- Latest letting
- 26 AUG 2026
By year of letting
| Year | Contracts | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|---|
| 2018 | 18 | 18 | $1,275.00 | 100 | $1,347.43 |
| 2019 | 13 | 13 | $1,315.00 | 56 | $1,313.50 |
| 2020 | 10 | 10 | $1,476.00 | 61 | $1,400.00 |
| 2021 | 13 | 13 | $1,464.00 | 91 | $1,350.00 |
| 2022 | 15 | 15 | $1,669.08 | 64 | $1,815.73 |
| 2023 | 14 | 14 | $2,258.48 | 68 | $2,271.94 |
| 2024 | 11 | 11 | $2,685.00 | 34 | $2,688.97 |
| 2025 | 10 | 10 | $2,500.00 | 62 | $2,500.00 |
| 2026 | 7 | 7 | $2,188.62 | 46 | $2,269.50 |
Bid prices as published, not adjusted for inflation.
By district
| District | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|
| District 6 | 8 | $2,350.00 | 50 | $2,323.75 |
| District 4 | 7 | $2,250.00 | 48 | $2,411.50 |
Districts with at least three low bids, over the last 24 months.
By quantity
| Quantity (AS) | Low bids | Low-bid median |
|---|---|---|
| 1 to 1 | 4 | $2,540.10 |
| 1 to 2 | 5 | $2,575.88 |
| 2 to 3 | 4 | $2,176.55 |
| 3 to 9 | 5 | $2,200.00 |
The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.
Latest contracts with this item
| Let | Contract | District | Quantity | Low bidder's price | Median | Bids | Low bidder | Source |
|---|---|---|---|---|---|---|---|---|
| 26 AUG 2026 | T3947 | District 3 | 2 | $3,000.00 | $2,601.52 | 3 | MURDOCK INVESTMENTS, LLC DBA GRIFFIN TRAFFIC SIGNALS | FDOT |
| 26 AUG 2026 | T4764 | District 4 | 2 | $2,032.77 | $2,200.00 | 9 | OHLA USA INC | FDOT |
| 10 JUN 2026 | T4766 | District 4 | 1 | $2,188.62 | $2,411.50 | 8 | FLORIDA ENGINEERING & DEVELOPMENT CORP | FDOT |
| 25 MAR 2026 | T4734 | District 4 | 4 | $2,172.53 | $2,400.00 | 7 | SICE INC | FDOT |
| 25 MAR 2026 | T6589 | District 6 | 5 | $2,200.00 | $2,207.29 | 6 | AUM CONSTRUCTION INC. | FDOT |
| 25 MAR 2026 | T6591 | District 6 | 2 | $1,800.00 | $2,155.85 | 7 | WEEKLEY ASPHALT PAVING, INC. | FDOT |
| 25 FEB 2026 | T7601 | District 7 | 1 | $2,554.15 | $2,641.35 | 6 | PREFERRED MATERIALS INC. | FDOT |
| 03 DEC 2025 | T6620 | District 6 | 9 | $2,500.00 | $2,500.00 | 5 | AUM CONSTRUCTION INC. | FDOT |
| 29 OCT 2025 | T6621 | District 6 | 3 | $1,993.66 | $2,726.63 | 6 | FLORIDA ENGINEERING & DEVELOPMENT CORP | FDOT |
| 27 AUG 2025 | T4688 | District 4 | 1 | $2,830.19 | $2,675.00 | 7 | CENTRAL CIVIL CONSTRUCTION CO. | FDOT |
| 27 AUG 2025 | T4715 | District 4 | 1 | $2,250.00 | $2,347.50 | 9 | BACALLAO CONSTRUCTION & ENGINEERING DEVELOPMENT, LLC D/B/A BC&E | FDOT |
| 27 AUG 2025 | T6609 | District 6 | 1 | $2,099.14 | $2,500.00 | 7 | FLORIDA ENGINEERING & DEVELOPMENT CORP | FDOT |
| 28 MAY 2025 | T3967 | District 3 | 2 | $4,052.66 | $3,943.75 | 3 | ROADS, INC. OF NWF | FDOT |
| 30 APR 2025 | T6606 | District 6 | 6 | $2,500.00 | $2,200.00 | 8 | AUM CONSTRUCTION INC. | FDOT |
| 26 MAR 2025 | T4699 | District 4 | 3 | $2,320.33 | $2,533.00 | 4 | TIMOTHY ROSE CONTRACTING, INC. | FDOT |
Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.
How these prices were read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
- Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
Your own bid history, read the same way