Dust control watering unit price, Illinois
Low bidders on IDOT contracts carried a median of $100.00 per UNIT for item Z0019600, dust control watering, over the 24 months to 18 SEP 2026, across 13 low bids. Half of all 67 bids fell between $30.00 and $100.00.
- Owner
- Illinois DOT
- Item
- Z0019600
- Unit
- UNIT
- Latest letting
- 31 JUL 2026
By year of letting
| Year | Contracts | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|---|
| 2021 | 3 | 3 | $50.00 | 17 | $100.00 |
| 2022 | 13 | 8 | $177.50 | 57 | $100.00 |
| 2023 | 8 | 5 | $100.00 | 29 | $90.00 |
| 2024 | 8 | 5 | $100.00 | 29 | $100.00 |
| 2025 | 9 | 6 | $100.00 | 33 | $68.02 |
| 2026 | 7 | 4 | $129.01 | 19 | $59.42 |
Bid prices as published, not adjusted for inflation.
By quantity
| Quantity (UNIT) | Low bids | Low-bid median |
|---|---|---|
| 1 to 10 | 3 | $300.00 |
| 10 to 50 | 3 | $75.80 |
| 50 to 50 | 3 | $100.00 |
| 65 to 200 | 4 | $25.00 |
The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.
Latest contracts with this item
| Let | Contract | District | Quantity | Low bidder's price | Median | Bids | Low bidder | Source |
|---|---|---|---|---|---|---|---|---|
| 31 JUL 2026 | 61K85 | District 01 | 65 | $10.00 | $50.00 | 9 | Plote Construction, Inc. | IDOT |
| 24 APR 2026 | 61L48 | District 01 | 120 | $182.23 | $182.23 | 1 | William Charles Construction Company, LLC | IDOT |
| 24 APR 2026 | 61M11 | District 01 | 5 | n/a | $25.00 | 1 | Alliance Contractors, Inc. | IDOT |
| 27 FEB 2026 | 62R23 | District 01 | 50 | n/a | $59.42 | 1 | D. Construction, Inc. & Kraemer North America, LLC JV | IDOT |
| 16 JAN 2026 | 61M08 | District 01 | 19 | $75.80 | $100.00 | 5 | Campanella and Sons, Inc. | IDOT |
| 16 JAN 2026 | 62F94 | District 01 | 700 | n/a | $59.42 | 1 | D. Construction, Inc. | IDOT |
| 16 JAN 2026 | 72G90 | District 06 | 2 | $5,511.99 | $5,511.99 | 1 | Illinois Valley Paving, a div of UCM, Inc. | IDOT |
| 19 SEP 2025 | 61L69 | District 01 | 100 | n/a | $32.58 | 4 | D. Construction, Inc. | IDOT |
| 25 APR 2025 | 61K79 | District 01 | 100 | n/a | $12.00 | 5 | Everlast Blacktop Inc. | IDOT |
| 25 APR 2025 | 97839 | District 08 | 50 | $200.00 | $205.00 | 2 | Charles E. Mahoney Co. | IDOT |
| 07 MAR 2025 | 61J84 | District 01 | 500 | n/a | $6.80 | 2 | R. W. Dunteman Company | IDOT |
| 07 MAR 2025 | 61L05 | District 01 | 200 | $15.00 | $32.50 | 4 | D'Land Construction, LLC | IDOT |
| 07 MAR 2025 | 61L25 | District 01 | 10 | $1,000.00 | $627.50 | 2 | D. Construction, Inc. | IDOT |
| 17 JAN 2025 | 61K86 | District 01 | 50 | $100.00 | $100.00 | 2 | Schroeder Asphalt Services, Inc. | IDOT |
| 17 JAN 2025 | 61K87 | District 01 | 100 | $35.00 | $93.98 | 8 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | IDOT |
Filter this item by your own quantity, district and period, or check your price against it, in the IDOT explorer.
How these prices were read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
- Item codes and units are IDOT's own: this item is compared with IDOT contracts only.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.