Pipe culv cleaned 24 unit price, Illinois

Low bidders on IDOT contracts carried a median of $35.20 per LF for item 60920024, pipe culv cleaned 24, over the 24 months to 18 SEP 2026, across 25 low bids. Half of all 77 bids fell between $8.50 and $65.00.

Owner
Illinois DOT
Item
60920024
Unit
LF
Latest letting
18 SEP 2026
$35.20Low bidder's median, per LF
$25.00Median of all bids, per LF
25Contracts in the window

By year of letting

Pipe culv cleaned 24, IDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20221616$35.0028$26.50
202333$37.0013$30.00
202499$40.0017$10.00
202588$14.7526$9.75
20261414$61.9842$50.00
Pipe culv cleaned 24, IDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Pipe culv cleaned 24, IDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 0112$9.7550$10.00
District 036$102.5011$50.00
District 044$55.526$85.75
Pipe culv cleaned 24, IDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Pipe culv cleaned 24, IDOT: low bidder's median by quantity band
Quantity (LF)Low bidsLow-bid median
37 to 486$86.17
50 to 706$78.72
108 to 2026$15.00
245 to 1,2847$45.00
Pipe culv cleaned 24, IDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest IDOT contracts carrying Pipe culv cleaned 24
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
18 SEP 202676V43District 08750$45.00$212.504Stutz Excavating, Inc.IDOT
12 JUN 202666A91District 03562$100.00$100.001Advanced Asphalt CompanyIDOT
12 JUN 202666C06District 03108$27.50$38.754D. Construction, Inc.IDOT
12 JUN 202676M95District 081,284$80.00$41.473Samron Midwest Contracting, Inc.IDOT
12 JUN 202680C45District 01300$7.00$7.004Peter Baker & Son Co.IDOT
12 JUN 202680D46District 0162$52.45$52.457Curran Contracting CompanyIDOT
24 APR 202666P86District 0352$105.00$105.001Advanced Asphalt CompanyIDOT
27 FEB 202668474District 04245$71.50$71.501R. A. Cullinan and Son, a div of UCM, Inc.IDOT
27 FEB 202668K15District 0450$106.00$115.502R. A. Cullinan and Son, a div of UCM, Inc.IDOT
27 FEB 202668K16District 04134$39.55$69.782R. A. Cullinan and Son, a div of UCM, Inc.IDOT
16 JAN 202666N78District 0350$115.00$115.001Advanced Asphalt CompanyIDOT
16 JAN 202672B36District 0640$144.85$92.393P. H. Broughton & Sons, Inc.IDOT
16 JAN 202680B19District 01500$5.15$9.184Gallagher Asphalt CorporationIDOT
16 JAN 202680B50District 01200$10.00$10.005Builders Paving, LLCIDOT
19 SEP 202562U11District 0137$171.00$110.003Everlast Blacktop Inc.IDOT
Latest IDOT contracts carrying Pipe culv cleaned 24

Filter this item by your own quantity, district and period, or check your price against it, in the IDOT explorer.

How these prices were read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are IDOT's own: this item is compared with IDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy