Curb ramps (ty 5) unit price, Texas
Low bidders on TxDOT contracts carried a median of $3,508.00 per EACH for item 531-7008, curb ramps (ty 5), over the 24 months to 19 NOV 2026, across 82 low bids. Half of all 449 bids fell between $3,000.00 and $5,045.00.
- Owner
- Texas DOT
- Item
- 531-7008
- Unit
- EACH
- Latest letting
- 03 SEP 2026
By year of letting
| Year | Contracts | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|---|
| 2024 | 5 | 5 | $3,500.00 | 31 | $3,500.00 |
| 2025 | 44 | 44 | $3,850.00 | 203 | $4,000.00 |
| 2026 | 36 | 36 | $3,500.00 | 234 | $3,606.23 |
Bid prices as published, not adjusted for inflation.
By district
| District | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|
| Dallas District | 23 | $3,750.00 | 127 | $4,583.77 |
| San Antonio District | 14 | $3,350.00 | 80 | $3,500.00 |
| Pharr District | 12 | $2,990.00 | 59 | $3,420.33 |
| Houston District | 7 | $4,609.58 | 45 | $3,500.00 |
| Fort Worth District | 7 | $3,850.00 | 38 | $4,418.00 |
| Austin District | 5 | $4,000.00 | 27 | $4,000.00 |
| Beaumont District | 3 | $3,145.00 | 8 | $3,322.50 |
Districts with at least three low bids, over the last 24 months.
By quantity
| Quantity (EACH) | Low bids | Low-bid median |
|---|---|---|
| 1 to 1 | 20 | $3,625.00 |
| 1 to 3 | 21 | $4,000.00 |
| 3 to 5 | 20 | $3,050.00 |
| 5 to 20 | 21 | $3,300.00 |
The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.
Latest contracts with this item
| Let | Contract | District | Quantity | Low bidder's price | Median | Estimate | Bids | Low bidder | Source |
|---|---|---|---|---|---|---|---|---|---|
| 03 SEP 2026 | A00123454 | Pharr District | 4 | $2,080.00 | $2,340.00 | $3,500.00 | 5 | REIM CONSTRUCTION, INC. | TxDOT |
| 03 SEP 2026 | A00206469 | Pharr District | 1 | $4,200.00 | $4,164.93 | $3,000.00 | 4 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC | TxDOT |
| 03 SEP 2026 | A00198323 | Dallas District | 2 | $3,750.00 | $3,985.60 | $3,500.00 | 8 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | TxDOT |
| 06 AUG 2026 | A00194280 | Waco District | 4 | $3,200.00 | $2,800.00 | $4,500.00 | 8 | Rucoba & Maya Construction, LLC | TxDOT |
| 06 AUG 2026 | A00216599 | Austin District | 5 | $4,000.00 | $4,000.00 | $4,000.00 | 5 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC | TxDOT |
| 06 AUG 2026 | A00209788 | Pharr District | 20 | $3,800.00 | $3,800.00 | $3,611.00 | 3 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC | TxDOT |
| 06 AUG 2026 | A00188243 | Fort Worth District | 6 | $6,600.00 | $6,171.00 | $3,575.00 | 9 | DURABLE SPECIALTIES, INC. | TxDOT |
| 05 AUG 2026 | A00184368 | Dallas District | 3 | $4,500.00 | $4,223.00 | $4,000.00 | 9 | WG ENGINEERING & CONSTRUCTION, LLC | TxDOT |
| 05 AUG 2026 | A00194399 | Waco District | 13 | $3,300.00 | $4,772.50 | $4,667.00 | 4 | VACA UNDERGROUND UTILITIES INC | TxDOT |
| 01 JUL 2026 | A00008199 | Fort Worth District | 1 | $3,400.00 | $2,912.05 | $4,000.00 | 6 | INDUS ROAD & BRIDGE, INC. | TxDOT |
| 01 JUL 2026 | A00193476 | San Antonio District | 1 | $4,100.00 | $4,000.00 | n/a | 7 | E-Z BEL CONSTRUCTION, LLC | TxDOT |
| 03 JUN 2026 | A00206853 | Pharr District | 3 | $1,600.00 | $3,500.00 | $3,400.00 | 7 | CASTILLO ARANDA LLC | TxDOT |
| 03 JUN 2026 | A00193431 | San Antonio District | 4 | $3,000.00 | $2,922.50 | $3,900.00 | 10 | E-Z BEL CONSTRUCTION, LLC | TxDOT |
| 03 JUN 2026 | A00062698 | San Antonio District | 6 | $2,900.00 | $3,327.89 | $3,575.00 | 6 | JORDAN FOSTER CONSTRUCTION, LLC | TxDOT |
| 03 JUN 2026 | A00193911 | Houston District | 3 | $2,750.00 | $4,887.50 | $4,800.00 | 10 | DECO CONTRACTORS, INC. | TxDOT |
Filter this item by your own quantity, district and period, or check your price against it, in the TxDOT explorer.
How these prices were read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
- Item codes and units are TxDOT's own: this item is compared with TxDOT contracts only.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.