Rem / repl timber/stl post w/o conc fnd unit price, Texas

Low bidders on TxDOT contracts carried a median of $48.00 per EACH for item 7706010, rem / repl timber/stl post w/o conc fnd, from 07 FEB 2020 to 10 JUL 2024, across 43 low bids. Half of all 132 bids fell between $40.00 and $85.00.

Owner
Texas DOT
Item
7706010
Unit
EACH
Latest letting
10 JUL 2024
$48.00Low bidder's median, per EACH
$50.00Median of all bids, per EACH
45Contracts in the window
$50.00Engineer's estimate, median per EACH

By year of letting

Rem / repl timber/stl post w/o conc fnd, TxDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
202055$50.0018$57.50
20211616$49.0043$50.00
202277$45.0017$51.00
20231311$40.0038$50.00
202444$65.0016$82.50
Rem / repl timber/stl post w/o conc fnd, TxDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Rem / repl timber/stl post w/o conc fnd, TxDOT: unit prices by district, all lettings
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
Houston District10$39.0035$40.00
Austin District5$80.0016$90.00
Beaumont District6$47.5014$55.00
Lufkin District4$62.5012$60.00
Yoakum District3$60.0011$50.00
El Paso District4$84.0010$122.50
Lubbock District4$70.008$88.00
Rem / repl timber/stl post w/o conc fnd, TxDOT: unit prices by district, all lettings

Districts with at least three low bids, over all lettings.

By quantity

Rem / repl timber/stl post w/o conc fnd, TxDOT: low bidder's median by quantity band
Quantity (EACH)Low bidsLow-bid median
6 to 7510$55.00
90 to 20011$40.00
200 to 40011$48.00
400 to 3,20011$60.00
Rem / repl timber/stl post w/o conc fnd, TxDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest TxDOT contracts carrying Rem / repl timber/stl post w/o conc fnd
LetContractDistrictQuantityLow bidder's priceMedianEstimateBidsLow bidderSource
10 JUL 202407243219Austin District6$300.00$400.00$71.862SCR CIVIL CONSTRUCTION, LLCTxDOT
09 JUL 202407243017Austin District20$80.00$500.00$71.866GARRET SHIELDS INFRASTRUCTURETxDOT
01 FEB 202402243030Austin District2,000$40.00$50.00$35.003HAZMAT INTERNATIONAL, INC.TxDOT
01 FEB 202402244015Houston District100$50.00$50.00$40.005HAZMAT INTERNATIONAL, INC.TxDOT
02 JUN 202306234206Houston District350$33.00$40.00$34.503ISI CONTRACTING, INC.TxDOT
01 JUN 202306234003Beaumont District75$42.00$61.00$50.002ROSS SA ENTERPRISE LLCTxDOT
05 MAY 202305234214Houston District200$90.00$90.00$38.743RHINO EQUITY, LLCTxDOT
05 MAY 202305234222Fort Worth District700n/a$47.50$70.002TALBRAN ENTERPRISES LLCTxDOT
04 MAY 202305234019Houston District150$40.00$45.00$45.004ABOVE ALL CONSTRUCTIONTxDOT
04 MAY 202305234026Tyler District90$10.00$27.00$32.002FIREMAN EXCAVATING, INC.TxDOT
22 MAR 202303231103Lufkin District450$65.00$65.00$50.003ROY LEE WALKERTxDOT
15 MAR 202303231102Lufkin District75$60.00$60.00$70.003ACE CONTRACTORS, INC.TxDOT
08 MAR 202303234214Beaumont District10$300.00$172.00$60.002ROY JORGENSEN ASSOCIATES, INC.TxDOT
08 MAR 202303234219Houston District200$35.00$37.50$45.174S6 INTERSTATE SERVICESTxDOT
08 MAR 202303234223Odessa District300$10.00$55.00$50.004ROSS SA ENTERPRISE LLCTxDOT
Latest TxDOT contracts carrying Rem / repl timber/stl post w/o conc fnd

Filter this item by your own quantity, district and period, or check your price against it, in the TxDOT explorer.

How these prices were read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are TxDOT's own: this item is compared with TxDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy