Removal of signal head assm unit price, Texas

Low bidders on TxDOT contracts carried a median of $125.00 per EACH for item 6906024, removal of signal head assm, from 06 FEB 2020 to 10 JUL 2024, across 63 low bids. Half of all 241 bids fell between $94.50 and $235.00.

Owner
Texas DOT
Item
6906024
Unit
EACH
Latest letting
10 JUL 2024
$125.00Low bidder's median, per EACH
$142.00Median of all bids, per EACH
63Contracts in the window
$150.00Engineer's estimate, median per EACH

By year of letting

Removal of signal head assm, TxDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20201414$147.5759$150.00
20211515$100.0072$144.01
20221313$100.0031$115.80
20231212$250.6242$175.59
202499$105.0037$100.00
Removal of signal head assm, TxDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Removal of signal head assm, TxDOT: unit prices by district, all lettings
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
San Antonio District15$100.0052$100.00
Fort Worth District10$206.5042$160.85
Waco District6$100.0027$150.00
Dallas District3$134.2522$201.20
Austin District8$215.0021$150.00
Laredo District4$146.5013$168.00
Amarillo District3$300.0012$320.00
Bryan District3$100.0011$94.00
Removal of signal head assm, TxDOT: unit prices by district, all lettings

Districts with at least three low bids, over all lettings.

By quantity

Removal of signal head assm, TxDOT: low bidder's median by quantity band
Quantity (EACH)Low bidsLow-bid median
1 to 415$150.00
4 to 816$125.00
8 to 2616$129.00
28 to 36816$89.00
Removal of signal head assm, TxDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest TxDOT contracts carrying Removal of signal head assm
LetContractDistrictQuantityLow bidder's priceMedianEstimateBidsLow bidderSource
10 JUL 202407243212Bryan District7$100.00$85.00$800.005LARRY YOUNG PAVING, INC.TxDOT
10 JUL 202407243227Fort Worth District6$704.50$389.75$200.002YUNEX LLCTxDOT
03 MAY 202405243237Pharr District8$133.00$199.40$200.006TEXAS CORDIA CONSTRUCTION, LLCTxDOT
02 MAY 202405243032San Antonio District4$50.00$92.50$65.004E-Z BEL CONSTRUCTION, LLCTxDOT
05 MAR 202403243019Fort Worth District7$1,050.00$1,046.59$535.004PEACHTREE CONSTRUCTION, LTD.TxDOT
05 MAR 202403243020San Antonio District2$105.00$77.50$300.006ELECNOR BELCO ELECTRIC, INC.TxDOT
01 FEB 202402243025Austin District3$130.00$125.00$215.003AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.TxDOT
01 FEB 202402243031San Antonio District4$100.00$100.00$65.003E-Z BEL CONSTRUCTION, LLCTxDOT
05 JAN 202401243235Austin District283$35.49$65.00$120.004THE LEVY COMPANY, INC.TxDOT
06 DEC 202312233207Amarillo District16$330.00$406.84$300.005TI-ZACK CONCRETE, INC.TxDOT
06 DEC 202312233220San Antonio District272$25.00$50.00$65.005D&G ENERGY CORPORATIONTxDOT
05 DEC 202312233012Amarillo District28$300.00$323.00$200.004TI-ZACK CONCRETE, INC.TxDOT
02 NOV 202311233214San Antonio District80$110.00$108.00$121.373E-Z BEL CONSTRUCTION, LLCTxDOT
01 NOV 202311233018Paris District10$400.00$450.00$185.292HIGHWAY 19 CONSTRUCTION LLCTxDOT
06 SEP 202309233028Waco District359$50.00$95.00$95.007THIRD COAST SERVICES LLCTxDOT
Latest TxDOT contracts carrying Removal of signal head assm

Filter this item by your own quantity, district and period, or check your price against it, in the TxDOT explorer.

How these prices were read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are TxDOT's own: this item is compared with TxDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.