Hydraulic erosion control product type 3 unit price, Virginia

Low bidders on VDOT contracts carried a median of $1.44 per SY for item 603SD20-0009, hydraulic erosion control product type 3, over the 24 months to 28 OCT 2026, across 77 low bids. Half of all 266 bids fell between $1.00 and $3.00.

Owner
Virginia DOT
Item
603SD20-0009
Unit
SY
Latest letting
28 OCT 2026
$1.44Low bidder's median, per SY
$1.50Median of all bids, per SY
77Contracts in the window

By year of letting

Hydraulic erosion control product type 3, VDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20251313$1.5039$1.73
20266464$1.42227$1.50
Hydraulic erosion control product type 3, VDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Hydraulic erosion control product type 3, VDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
Salem18$1.3858$1.50
Staunton12$1.7747$1.50
Richmond10$1.4532$2.00
Culpeper7$1.0029$1.25
Bristol9$1.0828$1.04
Fredericksburg6$1.6528$1.92
Hampton Roads6$1.6720$1.75
Lynchburg7$1.7018$1.67
Hydraulic erosion control product type 3, VDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Hydraulic erosion control product type 3, VDOT: low bidder's median by quantity band
Quantity (SY)Low bidsLow-bid median
95 to 2,71019$3.30
3,098 to 5,90519$1.44
6,401 to 11,18019$1.32
11,616 to 54,92220$1.16
Hydraulic erosion control product type 3, VDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest VDOT contracts carrying Hydraulic erosion control product type 3
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 OCT 2026C0000124205C01BStaunton5,191$2.00$2.003S. L. WILLIAMSON COMPANY, INCORPORATEDVDOT
28 OCT 2026C0000115201C01BRichmond1,997$0.30$7.124FLB CONTRACTORS, INC.VDOT
23 SEP 2026C0000124001C01BStaunton387$1.54$3.004RICHARDSON-WAYLAND-FERREIRA, LLCVDOT
23 SEP 2026C0000123290C01Richmond9,317$1.50$1.915CATON CONSTRUCTION GROUP, INC.VDOT
26 AUG 2026C000119218C01BHampton Roads4,247$1.34$2.003BRANSCOME OPERATING, LLC dba BRANSCOMEVDOT
26 AUG 2026C0000124094M01Salem653$1.30$1.303JONES ROAD & BRIDGE, INC.VDOT
26 AUG 2026C0000124095M01Salem404$2.00$1.944ALLEGHENY CONSTRUCTION COMPANY, INC.VDOT
26 AUG 2026C0000115512C01Hampton Roads6,570$1.25$1.253ALLAN MYERS VA, INC.VDOT
26 AUG 2026C0000129131C01BRichmond8,833$0.81$1.412CATON CONSTRUCTION GROUP, INC.VDOT
22 JUL 2026C0000119468M01Salem14,012$1.04$1.372E. C. PACE COMPANY, INC.VDOT
22 JUL 2026C0000120697C01Salem6,546$1.00$1.003CROSSROADS BRIDGE INC.VDOT
22 JUL 2026C0000118431B20Culpeper864$31.00$4.506FREYSSINET, INC.VDOT
22 JUL 2026C0000111704C01Richmond12,136$1.03$1.031J. L. KENT & SONS, INC.VDOT
22 JUL 2026C0000121138B52Bristol10,104$1.00$1.005ELK KNOB, INC.VDOT
22 JUL 2026C0000119641C02Staunton3,896$10.30$5.902G. B. FOLTZ CONTRACTING, INC.VDOT
Latest VDOT contracts carrying Hydraulic erosion control product type 3

Filter this item by your own quantity, district and period, or check your price against it, in the VDOT explorer.

How these prices were read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are VDOT's own: this item is compared with VDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy