Siltation control excavation unit price, Virginia
Low bidders on VDOT contracts carried a median of $5.88 per CY for item 303SD20-0029, siltation control excavation, over the 24 months to 28 OCT 2026, across 82 low bids. Half of all 273 bids fell between $2.50 and $35.00.
- Owner
- Virginia DOT
- Item
- 303SD20-0029
- Unit
- CY
- Latest letting
- 28 OCT 2026
By year of letting
| Year | Contracts | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|---|
| 2025 | 20 | 14 | $14.03 | 49 | $15.00 |
| 2026 | 77 | 68 | $5.12 | 224 | $10.16 |
Bid prices as published, not adjusted for inflation.
By district
| District | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|
| Staunton | 19 | $4.86 | 61 | $10.00 |
| Salem | 9 | $5.75 | 38 | $12.61 |
| Bristol | 13 | $2.13 | 36 | $5.00 |
| Fredericksburg | 8 | $37.50 | 34 | $20.00 |
| Culpeper | 7 | $10.00 | 32 | $16.20 |
| Richmond | 11 | $4.86 | 29 | $15.60 |
| Hampton Roads | 7 | $17.00 | 21 | $24.00 |
| Lynchburg | 5 | $10.00 | 13 | $13.71 |
| Northern Virginia | 3 | $65.00 | 9 | $50.00 |
Districts with at least three low bids, over the last 24 months.
By quantity
| Quantity (CY) | Low bids | Low-bid median |
|---|---|---|
| 12.70 to 110 | 20 | $10.00 |
| 126 to 255 | 21 | $5.00 |
| 279 to 574 | 20 | $8.00 |
| 584 to 7,582.50 | 21 | $5.00 |
The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.
Latest contracts with this item
| Let | Contract | District | Quantity | Low bidder's price | Median | Bids | Low bidder | Source |
|---|---|---|---|---|---|---|---|---|
| 28 OCT 2026 | C0000124205C01B | Staunton | 425 | $1.00 | $46.00 | 3 | S. L. WILLIAMSON COMPANY, INCORPORATED | VDOT |
| 28 OCT 2026 | C0000115201C01B | Richmond | 179.70 | $10.00 | $51.55 | 4 | FLB CONTRACTORS, INC. | VDOT |
| 28 OCT 2026 | C0000127207B70 | Salem | 103 | n/a | $150.00 | 1 | KING GENERAL CONTRACTORS, INC. | VDOT |
| 28 OCT 2026 | C0000128987B24 | Fredericksburg | 148 | $340.00 | $227.50 | 2 | INDEPENDENCE EXCAVATING, INC. | VDOT |
| 28 OCT 2026 | C0000124007C01 | Staunton | 102 | $1.00 | $93.43 | 3 | S. L. WILLIAMSON COMPANY, INCORPORATED | VDOT |
| 23 SEP 2026 | C0000119597C01B | Richmond | 2,953 | $0.63 | $0.63 | 1 | CURTIS CONTRACTING, INC. | VDOT |
| 23 SEP 2026 | C0000124001C01B | Staunton | 108 | $35.88 | $27.14 | 2 | RICHARDSON-WAYLAND-FERREIRA, LLC | VDOT |
| 23 SEP 2026 | C0000123290C01 | Richmond | 7,582.50 | $1.00 | $2.90 | 4 | CATON CONSTRUCTION GROUP, INC. | VDOT |
| 26 AUG 2026 | C000119218C01B | Hampton Roads | 153 | $140.79 | $20.00 | 3 | BRANSCOME OPERATING, LLC dba BRANSCOME | VDOT |
| 26 AUG 2026 | C0000119687C01B | Richmond | 392.52 | $4.80 | $17.40 | 2 | GRAY AND SONS CONSTRUCTION, INC. | VDOT |
| 26 AUG 2026 | C0000124095M01 | Salem | 595 | n/a | $154.78 | 2 | ALLEGHENY CONSTRUCTION COMPANY, INC. | VDOT |
| 26 AUG 2026 | C0000115512C01 | Hampton Roads | 1,082 | n/a | $6.96 | 1 | ALLAN MYERS VA, INC. | VDOT |
| 26 AUG 2026 | C0000129131C01B | Richmond | 1,408 | $41.02 | $21.01 | 2 | CATON CONSTRUCTION GROUP, INC. | VDOT |
| 22 JUL 2026 | C0000119468M01 | Salem | 755 | $1.50 | $13.25 | 2 | E. C. PACE COMPANY, INC. | VDOT |
| 22 JUL 2026 | C0000120697C01 | Salem | 440 | n/a | $25.00 | 1 | CROSSROADS BRIDGE INC. | VDOT |
Filter this item by your own quantity, district and period, or check your price against it, in the VDOT explorer.
How these prices were read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
- Item codes and units are VDOT's own: this item is compared with VDOT contracts only.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.