Superpave Bituminous Concrete Upper Binder Layer, 3/4" Maximum Aggregate Size Mix, ESAL Range C/D unit price, Alabama

Low bidders on ALDOT contracts carried a median of $109.56 per TON for item 424B650, superpave bituminous concrete upper binder layer, 3/4" maximum aggregate size mix, esal range c/d, over the 24 months to 28 AUG 2026, across 48 low bids. Half of all 179 bids fell between $98.92 and $167.88.

Owner
Alabama DOT
Item
424B650
Unit
TON
Latest letting
28 AUG 2026
$109.56Low bidder's median, per TON
$125.00Median of all bids, per TON
48Contracts in the window

By year of letting

Superpave Bituminous Concrete Upper Binder Layer, 3/4" Maximum Aggregate Size Mix, ESAL Range C/D, ALDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20221414$110.0836$119.45
20231616$98.0351$107.41
20242222$118.6985$138.00
20252828$103.7897$112.12
202666$88.5028$146.68
Superpave Bituminous Concrete Upper Binder Layer, 3/4" Maximum Aggregate Size Mix, ESAL Range C/D, ALDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Superpave Bituminous Concrete Upper Binder Layer, 3/4" Maximum Aggregate Size Mix, ESAL Range C/D, ALDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
03016$113.3027$132.62
01045$74.0024$110.54
02025$69.0019$117.55
01053$140.0013$153.00
05023$123.2711$131.74
01033$89.2510$105.93
Superpave Bituminous Concrete Upper Binder Layer, 3/4" Maximum Aggregate Size Mix, ESAL Range C/D, ALDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Superpave Bituminous Concrete Upper Binder Layer, 3/4" Maximum Aggregate Size Mix, ESAL Range C/D, ALDOT: low bidder's median by quantity band
Quantity (TON)Low bidsLow-bid median
20 to 42212$166.40
426 to 1,28812$121.53
1,475 to 3,75712$103.67
3,895 to 26,65312$78.25
Superpave Bituminous Concrete Upper Binder Layer, 3/4" Maximum Aggregate Size Mix, ESAL Range C/D, ALDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest ALDOT contracts carrying Superpave Bituminous Concrete Upper Binder Layer, 3/4" Maximum Aggregate Size Mix, ESAL Range C/D
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 AUG 202620260828030020220$230.00$232.008ROGERS GROUP, INC.ALDOT
26 JUN 2026202606260350902426$140.36$179.535WIREGRASS CONSTRUCTION COMPANY, INC.ALDOT
27 MAR 20262026032702206032,320$95.00$95.003APAC-ALABAMA, INC.ALDOT
27 FEB 202620260227021020210,540$64.00$71.162ROGERS GROUP, INC.ALDOT
30 JAN 20262026013000101051,542$80.00$128.296ROGERS GROUP, INC.ALDOT
30 JAN 20262026013002501021,876$82.00$100.754ROGERS GROUP, INC.ALDOT
05 DEC 20252025120500202011,180$125.07$112.143MILLER & MILLER, INC.ALDOT
05 DEC 202520251205030020215,802$69.00$76.073ROGERS GROUP, INC.ALDOT
26 SEP 20252025092600610011,475$124.52$131.012CARCEL & G. CONSTRUCTION, LLCALDOT
26 SEP 20252025092603305023,712$140.83$140.834GFC CONSTRUCTION, INC.ALDOT
29 AUG 202520250829022030110,372$86.73$88.376CHILTON CONTRACTORS, INC.ALDOT
25 JUL 2025202507250010301791$136.00$144.657GILLESPIE CONSTRUCTION, LLCALDOT
25 JUL 20252025072500801033,514$89.25$104.814ROGERS GROUP, INC.ALDOT
27 JUN 20252025062700103719$132.90$134.994THE BRIDGE BUILDERS OF ALABAMA, LLCALDOT
27 JUN 2025202506270160103806$146.87$146.873WIREGRASS CONSTRUCTION COMPANY, INC.ALDOT
Latest ALDOT contracts carrying Superpave Bituminous Concrete Upper Binder Layer, 3/4" Maximum Aggregate Size Mix, ESAL Range C/D

Filter this item by your own quantity, district and period, or check your price against it, in the ALDOT explorer.

How these prices were read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are ALDOT's own: this item is compared with ALDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy