Electrical power service, remove overhead unit price, Florida

Low bidders on FDOT contracts carried a median of $840.00 per AS for item 0639-1610, electrical power service, remove overhead, over the 24 months to 28 OCT 2026, across 25 low bids. Half of all 105 bids fell between $693.14 and $1,335.00.

Owner
Florida DOT
Item
0639-1610
Unit
AS
Latest letting
28 OCT 2026
$840.00Low bidder's median, per AS
$880.00Median of all bids, per AS
25Contracts in the window

By year of letting

Electrical power service, remove overhead, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
201866$320.9230$425.22
20191616$440.0072$432.50
202077$500.0031$545.00
20211515$745.6769$612.31
2022910$1,000.0045$1,000.00
20231717$1,000.0065$907.50
20241919$1,075.6973$1,088.23
20251212$864.0049$1,040.00
20261010$789.0244$798.00
Electrical power service, remove overhead, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Electrical power service, remove overhead, FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 67$700.0038$780.25
District 57$1,000.0027$1,050.00
District 43$1,074.0411$1,050.61
District 13$840.0010$807.50
Electrical power service, remove overhead, FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Electrical power service, remove overhead, FDOT: low bidder's median by quantity band
Quantity (AS)Low bidsLow-bid median
1 to 16$1,081.13
1 to 16$892.53
1 to 26$802.75
2 to 87$750.00
Electrical power service, remove overhead, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Electrical power service, remove overhead
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 OCT 2026T1947District 11$1,589.15$1,135.004AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
30 SEP 2026T6398District 62$765.50$797.504OHLA USA INCFDOT
30 SEP 2026T6613District 61$500.00$750.009WEEKLEY ASPHALT PAVING, INC.FDOT
10 JUN 2026T7534District 72$812.54$1,224.354PREFERRED MATERIALS INC.FDOT
29 APR 2026T3997District 31$300.00$1,142.474INGRAM SIGNALIZATION, INC.FDOT
25 MAR 2026T5878District 51$1,313.00$880.003TRAFFIC CONTROL DEVICES, LLCFDOT
25 FEB 2026T1813District 14$250.00$582.914SUPERIOR ASPHALT, INC.FDOT
25 FEB 2026T2A36District 21$897.06$648.532CHINCHOR ELECTRIC INC.FDOT
28 JAN 2026T5874District 52$1,200.00$1,200.005MASCI GENERAL CONTRACTORS, INCFDOT
28 JAN 2026T6618District 62$250.00$609.005WEEKLEY ASPHALT PAVING, INC.FDOT
29 OCT 2025T5869District 51$524.80$524.803ANDERSON COLUMBIA CO., INC.FDOT
29 OCT 2025T5873District 51$888.00$1,081.502CHINCHOR ELECTRIC INC.FDOT
27 AUG 2025T5872District 51$2,387.00$573.804BLACKTIP SERVICES INCORPORATEDFDOT
30 JUL 2025T4648District 41$3,500.00$600.005WEEKLEY ASPHALT PAVING, INC.FDOT
30 JUL 2025T6599District 68$750.00$880.006AUM CONSTRUCTION INC.FDOT
Latest FDOT contracts carrying Electrical power service, remove overhead

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy