Modify existing drainage structure unit price, Florida

Low bidders on FDOT contracts carried a median of $4,436.37 per EACH for item 0425-11, modify existing drainage structure, over the 24 months to 28 OCT 2026, across 8 low bids. Half of all 34 bids fell between $3,484.68 and $7,326.36.

Owner
Florida DOT
Item
0425-11
Unit
EACH
Latest letting
30 SEP 2026
$4,436.37Low bidder's median, per EACH
$4,750.00Median of all bids, per EACH
8Contracts in the window

By year of letting

Modify existing drainage structure, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20181515$3,000.0079$2,893.00
20191414$1,938.7053$2,000.00
202066$2,681.6834$2,655.00
202199$2,937.0037$2,500.00
202299$1,596.6542$2,000.00
202388$5,696.2230$5,599.79
202466$9,013.4221$7,000.00
202555$5,134.0017$5,134.00
202622$3,950.0014$4,750.00
Modify existing drainage structure, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

Latest contracts with this item

Latest FDOT contracts carrying Modify existing drainage structure
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
30 SEP 2026T5893District 51$5,900.00$5,450.008MASCI GENERAL CONTRACTORS, INCFDOT
26 AUG 2026T5890District 56$2,000.00$3,845.006WATSON CIVIL CONSTRUCTION, INC.FDOT
28 MAY 2025T2A20District 22$9,878.15$9,878.151ANDERSON COLUMBIA CO., INC.FDOT
28 MAY 2025T3938District 31$1,500.00$5,802.734C.W. ROBERTS CONTRACTING, INC.FDOT
26 MAR 2025T3944District 31$9,000.00$7,500.002C.W. ROBERTS CONTRACTING, INC.FDOT
26 FEB 2025T4691District 41$3,000.00$3,150.005MASTEC CIVIL LLCFDOT
29 JAN 2025T4705District 44$5,134.00$6,500.005GLF POSILLICO JVFDOT
04 DEC 2024T3907District 31$3,738.74$4,500.003ROADS, INC. OF NWFFDOT
31 JUL 2024T3901District 31$8,026.84$7,513.424C.W. ROBERTS CONTRACTING, INC.FDOT
31 JUL 2024T4668District 42$3,000.00$4,200.003LEON AMERICA CONSTRUCTIONFDOT
22 MAY 2024T7549District 71$10,000$10,0005BLACKTIP SERVICES INCORPORATEDFDOT
27 MAR 2024T1878District 12$10,500$5,000.003C.W. ROBERTS CONTRACTING, INC.FDOT
28 FEB 2024T2971District 21$10,756$5,905.003ANDERSON COLUMBIA CO., INC.FDOT
13 SEP 2023T2942District 21$5,185.53$5,185.533ANDERSON COLUMBIA CO., INC.FDOT
14 JUN 2023T2906District 21$5,992.43$6,365.352PREFERRED MATERIALS INC.FDOT
Latest FDOT contracts carrying Modify existing drainage structure

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy