Pole cable distribution system, furnish and install, conventional unit price, Florida

Low bidders on FDOT contracts carried a median of $900.00 per EACH for item 0715-500-1, pole cable distribution system, furnish and install, conventional, over the 24 months to 28 OCT 2026, across 141 low bids. Half of all 755 bids fell between $772.55 and $1,089.07.

Owner
Florida DOT
Item
0715-500-1
Unit
EACH
Latest letting
28 OCT 2026
$900.00Low bidder's median, per EACH
$900.00Median of all bids, per EACH
141Contracts in the window

By year of letting

Pole cable distribution system, furnish and install, conventional, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20194951$600.00225$592.68
20204445$613.35248$619.50
20216161$614.53330$637.65
20225558$831.66236$850.08
20236263$870.00220$924.31
20247171$916.24264$940.50
20257272$897.32375$928.63
20265656$891.50339$883.64
Pole cable distribution system, furnish and install, conventional, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Pole cable distribution system, furnish and install, conventional, FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 443$915.00255$885.16
District 622$950.00142$1,000.00
District 719$816.45111$874.56
District 123$947.7487$947.74
District 517$823.5286$858.65
District 39$920.0037$950.00
District 26$921.0231$940.00
Pole cable distribution system, furnish and install, conventional, FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Pole cable distribution system, furnish and install, conventional, FDOT: low bidder's median by quantity band
Quantity (EACH)Low bidsLow-bid median
1 to 535$965.67
5 to 1035$925.00
10 to 3035$880.11
32 to 25536$839.46
Pole cable distribution system, furnish and install, conventional, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Pole cable distribution system, furnish and install, conventional
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 OCT 2026T1941District 16$675.93$840.212AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
28 OCT 2026T1947District 117$938.04$931.524AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
28 OCT 2026T4765District 422$695.50$747.756GENERAL ASPHALT COMPANY, LLCFDOT
28 OCT 2026T5914District 547$915.00$950.003MASCI GENERAL CONTRACTORS, INCFDOT
28 OCT 2026T7616District 72$826.69$826.695CHINCHOR ELECTRIC INC.FDOT
30 SEP 2026T5893District 54$750.66$800.008MASCI GENERAL CONTRACTORS, INCFDOT
30 SEP 2026T6398District 684$765.50$797.504OHLA USA INCFDOT
30 SEP 2026T6613District 64$1,200.00$1,201.149WEEKLEY ASPHALT PAVING, INC.FDOT
26 AUG 2026T1940District 19$2,127.30$846.344AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
26 AUG 2026T4757District 4178$569.51$750.0012AMERICAN LIGHTING AND SIGNALIZATION, LLC.FDOT
26 AUG 2026T4764District 45$885.16$899.719OHLA USA INCFDOT
26 AUG 2026T4773District 497$867.00$867.0013GERELCO TRAFFIC CONTROLS, INC.FDOT
26 AUG 2026T7613District 715$650.00$1,031.0010LEON AMERICA CONSTRUCTIONFDOT
26 AUG 2026T7624District 777$575.31$820.005AMERICAN LIGHTING AND SIGNALIZATION, LLC.FDOT
29 JUL 2026T4745District 434$820.86$894.556FLORIDA ENGINEERING & DEVELOPMENT CORPFDOT
Latest FDOT contracts carrying Pole cable distribution system, furnish and install, conventional

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy