Pull & splice box, f&i, 17" x 30" cover size unit price, Florida

Low bidders on FDOT contracts carried a median of $1,795.08 per EACH for item 0635-2-14, pull & splice box, f&i, 17" x 30" cover size, over the 24 months to 28 OCT 2026, across 63 low bids. Half of all 336 bids fell between $1,638.25 and $2,237.42.

Owner
Florida DOT
Item
0635-2-14
Unit
EACH
Latest letting
28 OCT 2026
$1,795.08Low bidder's median, per EACH
$1,895.34Median of all bids, per EACH
54Contracts in the window

By year of letting

Pull & splice box, f&i, 17" x 30" cover size, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
202213$925.789$925.78
20231318$1,815.7267$1,908.47
20241721$1,900.0087$1,924.00
20251723$1,878.52129$2,000.00
20263437$1,770.29196$1,878.85
Pull & splice box, f&i, 17" x 30" cover size, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Pull & splice box, f&i, 17" x 30" cover size, FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 423$1,670.00149$1,800.00
District 720$2,002.50107$1,900.00
District 114$1,886.5956$1,897.74
District 53$1,900.0013$2,350.00
Pull & splice box, f&i, 17" x 30" cover size, FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Pull & splice box, f&i, 17" x 30" cover size, FDOT: low bidder's median by quantity band
Quantity (EACH)Low bidsLow-bid median
1 to 915$1,741.07
9 to 1916$1,962.00
23 to 7616$1,783.22
80 to 25216$1,762.00
Pull & splice box, f&i, 17" x 30" cover size, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Pull & splice box, f&i, 17" x 30" cover size
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 OCT 2026T3A28District 33$1,200.00$1,200.003C.W. ROBERTS CONTRACTING, INC.FDOT
28 OCT 2026T5894District 530$1,900.00$2,400.005AUM CONSTRUCTION INC.FDOT
28 OCT 2026T7591District 767$1,377.48$1,552.535PREFERRED MATERIALS INC.FDOT
28 OCT 2026T7616District 79$1,770.29$1,781.475CHINCHOR ELECTRIC INC.FDOT
29 JUL 2026T4745District 468$1,555.75$1,585.006FLORIDA ENGINEERING & DEVELOPMENT CORPFDOT
29 JUL 2026T4747District 413$1,921.00$1,780.496R & D PAVING LLCFDOT
10 JUN 2026T2A63District 218$2,450.00$2,224.224MAER HOMES, LLCFDOT
10 JUN 2026T7534District 7187$1,810.87$2,092.464PREFERRED MATERIALS INC.FDOT
20 MAY 2026T4666District 4114$1,726.90$2,178.508OHLA USA INCFDOT
20 MAY 2026T7587District 79$1,710.41$2,492.495HUBBARD CONSTRUCTION COMPANYFDOT
20 MAY 2026T7607District 71$3,368.95$2,528.156BLACKTIP SERVICES INCORPORATEDFDOT
20 MAY 2026T7609District 78$3,807.32$2,167.534BLACKTIP SERVICES INCORPORATEDFDOT
20 MAY 2026T7610District 7136$1,659.00$1,729.506RUSSELL ENGINEERING, INC.FDOT
29 APR 2026T3997District 33$1,555.00$2,006.384INGRAM SIGNALIZATION, INC.FDOT
29 APR 2026T4723District 418$1,670.00$1,635.004WEEKLEY ASPHALT PAVING, INC.FDOT
Latest FDOT contracts carrying Pull & splice box, f&i, 17" x 30" cover size

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy