Span wire assembly, remove- poles remain unit price, Florida
Low bidders on FDOT contracts carried a median of $2,000.00 per PI for item 0634-4600, span wire assembly, remove- poles remain, over the 24 months to 28 OCT 2026, across 13 low bids. Half of all 58 bids fell between $1,721.27 and $3,137.25.
- Owner
- Florida DOT
- Item
- 0634-4600
- Unit
- PI
- Latest letting
- 28 OCT 2026
By year of letting
| Year | Contracts | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|---|
| 2018 | 7 | 7 | $927.12 | 26 | $801.00 |
| 2019 | 8 | 8 | $943.95 | 36 | $932.50 |
| 2020 | 8 | 8 | $912.17 | 37 | $1,000.00 |
| 2021 | 8 | 8 | $650.90 | 46 | $903.08 |
| 2022 | 8 | 8 | $930.66 | 24 | $1,056.20 |
| 2023 | 9 | 9 | $1,500.00 | 29 | $1,728.50 |
| 2024 | 10 | 10 | $2,042.50 | 33 | $2,650.00 |
| 2025 | 4 | 4 | $2,414.75 | 17 | $2,462.40 |
| 2026 | 7 | 7 | $1,708.36 | 35 | $2,242.05 |
Bid prices as published, not adjusted for inflation.
By district
| District | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|
| District 5 | 7 | $1,900.00 | 26 | $2,290.00 |
| District 7 | 4 | $1,881.43 | 24 | $2,070.00 |
Districts with at least three low bids, over the last 24 months.
By quantity
| Quantity (PI) | Low bids | Low-bid median |
|---|---|---|
| 1 to 1 | 3 | $3,600.00 |
| 1 to 1 | 3 | $2,775.00 |
| 1 to 1 | 3 | $1,708.36 |
| 2 to 5 | 4 | $1,727.61 |
The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.
Latest contracts with this item
| Let | Contract | District | Quantity | Low bidder's price | Median | Bids | Low bidder | Source |
|---|---|---|---|---|---|---|---|---|
| 28 OCT 2026 | T5894 | District 5 | 1 | $2,000.00 | $3,956.00 | 5 | AUM CONSTRUCTION INC. | FDOT |
| 26 AUG 2026 | T2A78 | District 2 | 1 | $4,000.00 | $3,759.88 | 3 | DUVAL ASPHALT PRODUCTS, INC. | FDOT |
| 20 MAY 2026 | T7595 | District 7 | 4 | $2,366.55 | $2,290.32 | 8 | C.W. ROBERTS CONTRACTING, INC. | FDOT |
| 25 MAR 2026 | T5878 | District 5 | 1 | $1,528.00 | $2,200.00 | 3 | TRAFFIC CONTROL DEVICES, LLC | FDOT |
| 25 FEB 2026 | T7583 | District 7 | 4 | $1,555.21 | $2,500.00 | 5 | PREFERRED MATERIALS INC. | FDOT |
| 28 JAN 2026 | T5874 | District 5 | 2 | $1,300.00 | $1,300.00 | 5 | MASCI GENERAL CONTRACTORS, INC | FDOT |
| 28 JAN 2026 | T7579 | District 7 | 1 | $1,708.36 | $1,605.00 | 6 | PREFERRED MATERIALS INC. | FDOT |
| 03 DEC 2025 | T2A48 | District 2 | 1 | $3,600.00 | $2,750.00 | 5 | COXWELL, J.B. CONTRACTING, INC. | FDOT |
| 29 OCT 2025 | T5873 | District 5 | 1 | $2,775.00 | $2,577.50 | 2 | CHINCHOR ELECTRIC INC. | FDOT |
| 11 JUN 2025 | T5851 | District 5 | 5 | $1,900.00 | $2,025.00 | 5 | JR. DAVIS CONSTRUCTION CO., INC. | FDOT |
| 29 JAN 2025 | T7558 | District 7 | 1 | $2,054.50 | $2,070.00 | 5 | GOSALIA CONCRETE CONSTRUCTORS, INC. | FDOT |
| 04 DEC 2024 | T5842 | District 5 | 1 | $4,428.00 | $3,296.25 | 3 | CARR CONSTRUCTION, LLC | FDOT |
| 30 OCT 2024 | T5835 | District 5 | 1 | $748.35 | $748.35 | 3 | C.W. ROBERTS CONTRACTING, INC. | FDOT |
| 12 JUN 2024 | T5816 | District 5 | 1 | $2,092.15 | $2,525.00 | 4 | PREFERRED MATERIALS INC. | FDOT |
| 22 MAY 2024 | T5804 | District 5 | 1 | $5,060.00 | $2,835.00 | 2 | CHINCHOR ELECTRIC INC. | FDOT |
Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.
How these prices were read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
- Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.