Span wire assembly, f&i, two point, box or drop box unit price, Florida

Low bidders on FDOT contracts carried a median of $13,600 per PI for item 0634-4153, span wire assembly, f&i, two point, box or drop box, over the 24 months to 28 OCT 2026, across 27 low bids. Half of all 127 bids fell between $10,299 and $16,186.

Owner
Florida DOT
Item
0634-4153
Unit
PI
Latest letting
28 OCT 2026
$13,600Low bidder's median, per PI
$12,693Median of all bids, per PI
27Contracts in the window

By year of letting

Span wire assembly, f&i, two point, box or drop box, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20181111$4,512.3351$6,000.00
20191313$6,228.2869$6,501.20
20201010$6,065.5452$6,436.54
20211111$7,424.6842$7,462.34
20221212$7,649.9132$9,008.50
20231111$10,20827$11,500
20241717$11,14064$11,189
20251212$12,80055$13,400
20261212$13,77761$12,466
Span wire assembly, f&i, two point, box or drop box, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Span wire assembly, f&i, two point, box or drop box, FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 77$13,95441$12,321
District 56$10,52433$10,748
District 44$18,05020$16,801
District 35$13,60016$13,033
District 13$12,02112$13,692
Span wire assembly, f&i, two point, box or drop box, FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Span wire assembly, f&i, two point, box or drop box, FDOT: low bidder's median by quantity band
Quantity (PI)Low bidsLow-bid median
1 to 16$15,425
1 to 17$14,091
1 to 17$13,600
1 to 47$11,617
Span wire assembly, f&i, two point, box or drop box, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Span wire assembly, f&i, two point, box or drop box
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 OCT 2026T5894District 51$18,000$17,0855AUM CONSTRUCTION INC.FDOT
29 JUL 2026T3A16District 31$10,000$10,0001INGRAM SIGNALIZATION, INC.FDOT
10 JUN 2026T5888District 52$10,300$10,0508C.W. ROBERTS CONTRACTING, INC.FDOT
20 MAY 2026T7595District 73$15,979$15,4658C.W. ROBERTS CONTRACTING, INC.FDOT
25 MAR 2026T1932District 11$12,021$12,4594BLACKTIP SERVICES INCORPORATEDFDOT
25 MAR 2026T3A02District 31$13,600$12,4667NORTH FLORIDA ASPHALT, INC.FDOT
25 MAR 2026T4753District 41$22,500$20,0003TRAFFICO LLCFDOT
25 MAR 2026T5878District 51$8,094.00$10,2973TRAFFIC CONTROL DEVICES, LLCFDOT
25 FEB 2026T7583District 74$13,954$14,3725PREFERRED MATERIALS INC.FDOT
25 FEB 2026T7601District 71$15,129$11,2276PREFERRED MATERIALS INC.FDOT
28 JAN 2026T5874District 51$14,299$12,7005MASCI GENERAL CONTRACTORS, INCFDOT
28 JAN 2026T7579District 71$11,617$8,765.196PREFERRED MATERIALS INC.FDOT
03 DEC 2025T3A01District 31$12,000$21,0102INGRAM SIGNALIZATION, INC.FDOT
24 SEP 2025T7592District 71$8,266.00$11,2876CONE & GRAHAM, INC.FDOT
27 AUG 2025T4702District 41$32,533$32,5338THE STOUT GROUP LLCFDOT
Latest FDOT contracts carrying Span wire assembly, f&i, two point, box or drop box

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy