Traffic controller, modify unit price, Florida

Low bidders on FDOT contracts carried a median of $2,625.00 per EACH for item 0671-2-40, traffic controller, modify, over the 24 months to 28 OCT 2026, across 73 low bids. Half of all 332 bids fell between $1,526.90 and $4,000.00.

Owner
Florida DOT
Item
0671-2-40
Unit
EACH
Latest letting
28 OCT 2026
$2,625.00Low bidder's median, per EACH
$2,622.50Median of all bids, per EACH
73Contracts in the window

By year of letting

Traffic controller, modify, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
201811$466.775$572.46
201955$2,607.2131$4,200.00
202111$1,892.004$1,531.65
202299$2,050.0031$2,950.57
20232021$3,174.2075$2,687.50
20243333$3,018.47117$3,170.00
20253030$2,555.00127$2,695.42
20263434$2,999.10173$2,592.00
Traffic controller, modify, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Traffic controller, modify, FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 717$2,365.0093$2,349.35
District 517$2,599.0073$2,500.00
District 114$2,265.0060$2,530.00
District 410$3,840.0053$3,700.00
District 28$2,672.3528$2,500.00
District 37$2,600.0025$2,600.00
Traffic controller, modify, FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Traffic controller, modify, FDOT: low bidder's median by quantity band
Quantity (EACH)Low bidsLow-bid median
1 to 118$2,950.30
1 to 218$2,612.50
2 to 418$2,214.20
4 to 1519$2,916.96
Traffic controller, modify, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Traffic controller, modify
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 OCT 2026T1937District 18$4,392.14$1,226.713AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
28 OCT 2026T5894District 51$2,500.00$2,770.005AUM CONSTRUCTION INC.FDOT
28 OCT 2026T7591District 78$5,499.47$1,562.495PREFERRED MATERIALS INC.FDOT
30 SEP 2026T3A23District 31$1,650.00$2,138.403AMERICAN SAND & X-CAVATION, INC. DBA AMERICAN SAND & ASPHALT PAVINGFDOT
30 SEP 2026T3A26District 35$2,100.00$1,822.504C.W. ROBERTS CONTRACTING, INC.FDOT
30 SEP 2026T5893District 51$2,721.60$2,810.808MASCI GENERAL CONTRACTORS, INCFDOT
26 AUG 2026T1940District 11$3,311.49$1,888.504AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
26 AUG 2026T2A74District 25$1,955.40$3,650.003PREFERRED MATERIALS INC.FDOT
26 AUG 2026T5890District 51$3,300.00$2,930.876WATSON CIVIL CONSTRUCTION, INC.FDOT
29 JUL 2026T2A40District 22$3,389.29$2,819.642ANDERSON COLUMBIA CO., INC.FDOT
29 JUL 2026T4745District 43$1,904.50$2,250.006FLORIDA ENGINEERING & DEVELOPMENT CORPFDOT
10 JUN 2026T1930District 15$4,675.45$2,550.005AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
10 JUN 2026T4766District 42$2,329.29$2,427.148FLORIDA ENGINEERING & DEVELOPMENT CORPFDOT
10 JUN 2026T7534District 75$1,976.13$2,198.744PREFERRED MATERIALS INC.FDOT
20 MAY 2026T5863District 55$2,599.00$2,298.606MASCI GENERAL CONTRACTORS, INCFDOT
Latest FDOT contracts carrying Traffic controller, modify

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way