Uninterruptible power supply, furnish and install, online/double conversion with cabinet unit price, Florida

Low bidders on FDOT contracts carried a median of $15,000 per EACH for item 0685-1-14, uninterruptible power supply, furnish and install, online/double conversion with cabinet, over the 24 months to 28 OCT 2026, across 19 low bids. Half of all 70 bids fell between $11,997 and $16,275.

Owner
Florida DOT
Item
0685-1-14
Unit
EACH
Latest letting
28 OCT 2026
$15,000Low bidder's median, per EACH
$14,303Median of all bids, per EACH
19Contracts in the window

By year of letting

Uninterruptible power supply, furnish and install, online/double conversion with cabinet, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
201911$5,946.425$6,100.00
202055$8,800.0025$8,415.00
202122$10,05011$9,412.84
20221111$12,60127$11,500
202399$12,90030$14,325
20241010$14,00035$15,000
202555$14,34813$13,755
20261212$15,75051$15,000
Uninterruptible power supply, furnish and install, online/double conversion with cabinet, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Uninterruptible power supply, furnish and install, online/double conversion with cabinet, FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 55$14,30524$15,996
District 37$15,00017$14,000
District 73$15,43114$13,050
District 13$14,3489$13,600
Uninterruptible power supply, furnish and install, online/double conversion with cabinet, FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Uninterruptible power supply, furnish and install, online/double conversion with cabinet, FDOT: low bidder's median by quantity band
Quantity (EACH)Low bidsLow-bid median
1 to 14$13,300
1 to 15$14,348
1 to 25$17,000
2 to 105$14,500
Uninterruptible power supply, furnish and install, online/double conversion with cabinet, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Uninterruptible power supply, furnish and install, online/double conversion with cabinet
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 OCT 2026T5894District 52$17,000$17,0005AUM CONSTRUCTION INC.FDOT
28 OCT 2026T7616District 71$15,431$12,3135CHINCHOR ELECTRIC INC.FDOT
30 SEP 2026T3A46District 31$16,000$16,0003CAPITAL ASPHALT INCFDOT
26 AUG 2026T3947District 31$15,500$11,8253MURDOCK INVESTMENTS, LLC DBA GRIFFIN TRAFFIC SIGNALSFDOT
29 JUL 2026T3A16District 31$11,500$11,5001INGRAM SIGNALIZATION, INC.FDOT
10 JUN 2026T5888District 53$10,200$15,9968C.W. ROBERTS CONTRACTING, INC.FDOT
20 MAY 2026T3992District 31$15,000$14,3003ROADS, INC. OF NWFFDOT
29 APR 2026T5880District 510$14,305$14,3613HALIFAX PAVING, INC.FDOT
29 APR 2026T7562District 72$16,000$12,6007WATSON CIVIL CONSTRUCTION, INC.FDOT
25 MAR 2026T5878District 51$18,263$18,0223TRAFFIC CONTROL DEVICES, LLCFDOT
25 MAR 2026T6589District 61$18,000$17,1036AUM CONSTRUCTION INC.FDOT
28 JAN 2026T1922District 18$16,980$13,5564SUPERIOR ASPHALT, INC.FDOT
27 AUG 2025T3930District 31$17,996$17,9963ROADS, INC. OF NWFFDOT
28 MAY 2025T3967District 31$8,349.39$8,125.003ROADS, INC. OF NWFFDOT
30 APR 2025T1913District 11$13,600$13,5482SUPERIOR ASPHALT, INC.FDOT
Latest FDOT contracts carrying Uninterruptible power supply, furnish and install, online/double conversion with cabinet

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy