Vehicle detection system- furnish & install above ground equipment unit price, Florida

Low bidders on FDOT contracts carried a median of $8,410.88 per EACH for item 0660-4-12, vehicle detection system- furnish & install above ground equipment, over the 24 months to 28 OCT 2026, across 90 low bids. Half of all 436 bids fell between $6,396.89 and $11,000.

Owner
Florida DOT
Item
0660-4-12
Unit
EACH
Latest letting
28 OCT 2026
$8,410.88Low bidder's median, per EACH
$8,500.00Median of all bids, per EACH
90Contracts in the window

By year of letting

Vehicle detection system- furnish & install above ground equipment, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20183737$4,090.81197$3,340.00
20193637$3,500.00166$3,775.00
20202828$4,310.00145$3,800.00
20213434$5,473.13182$4,736.04
20224545$6,748.00167$6,846.12
20234747$6,437.54166$7,001.57
20244647$8,266.13170$8,549.50
20254545$9,200.00210$8,974.65
20263434$7,750.00191$8,420.00
Vehicle detection system- furnish & install above ground equipment, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Vehicle detection system- furnish & install above ground equipment, FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 523$9,850.00114$10,165
District 615$3,564.0090$4,305.00
District 415$6,987.0088$8,470.50
District 716$7,348.3682$8,005.00
District 310$13,50027$9,926.00
District 15$7,581.2118$8,320.44
District 26$10,36217$9,093.50
Vehicle detection system- furnish & install above ground equipment, FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Vehicle detection system- furnish & install above ground equipment, FDOT: low bidder's median by quantity band
Quantity (EACH)Low bidsLow-bid median
1 to 222$8,877.50
2 to 423$8,477.60
4 to 1222$8,062.95
13 to 5723$7,114.50
Vehicle detection system- furnish & install above ground equipment, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Vehicle detection system- furnish & install above ground equipment
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 OCT 2026T1947District 12$6,757.22$6,440.114AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
28 OCT 2026T4765District 44$7,490.00$9,495.006GENERAL ASPHALT COMPANY, LLCFDOT
28 OCT 2026T5894District 511$5,000.00$9,950.005AUM CONSTRUCTION INC.FDOT
28 OCT 2026T7591District 714$10,247$10,2475PREFERRED MATERIALS INC.FDOT
30 SEP 2026T6613District 62$8,000.00$12,0009WEEKLEY ASPHALT PAVING, INC.FDOT
26 AUG 2026T4764District 42$6,535.75$7,200.009OHLA USA INCFDOT
29 JUL 2026T2A40District 22$5,748.95$5,874.482ANDERSON COLUMBIA CO., INC.FDOT
29 JUL 2026T4745District 42$4,850.48$5,250.006FLORIDA ENGINEERING & DEVELOPMENT CORPFDOT
10 JUN 2026T2A63District 21$21,000$9,972.064MAER HOMES, LLCFDOT
10 JUN 2026T5888District 518$8,500.00$7,412.008C.W. ROBERTS CONTRACTING, INC.FDOT
10 JUN 2026T7534District 712$7,032.41$7,116.204PREFERRED MATERIALS INC.FDOT
20 MAY 2026T3992District 33$17,000$16,5003ROADS, INC. OF NWFFDOT
20 MAY 2026T5863District 56$9,982.00$6,694.576MASCI GENERAL CONTRACTORS, INCFDOT
20 MAY 2026T5882District 518$13,780$11,21910MASCI GENERAL CONTRACTORS, INCFDOT
20 MAY 2026T7587District 74$15,135$8,380.005HUBBARD CONSTRUCTION COMPANYFDOT
Latest FDOT contracts carrying Vehicle detection system- furnish & install above ground equipment

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.