Elec condr (no.6) bare unit price, Texas

Low bidders on TxDOT contracts carried a median of $2.50 per LF for item 620-7009, elec condr (no.6) bare, over the 24 months to 19 NOV 2026, across 273 low bids. Half of all 1,487 bids fell between $2.10 and $3.12.

Owner
Texas DOT
Item
620-7009
Unit
LF
Latest letting
12 NOV 2026
$2.50Low bidder's median, per LF
$2.55Median of all bids, per LF
273Contracts in the window
$2.52Engineer's estimate, median per LF

By year of letting

Elec condr (no.6) bare, TxDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20241111$2.2048$2.65
2025131131$2.50607$2.70
2026138138$2.45860$2.50
Elec condr (no.6) bare, TxDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Elec condr (no.6) bare, TxDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
Dallas District54$3.00327$3.00
Houston District22$2.09170$2.08
Austin District27$2.40148$2.40
San Antonio District22$2.15125$2.35
Pharr District25$2.00115$2.15
Fort Worth District14$2.7770$2.76
Odessa District19$2.5063$2.50
Yoakum District9$2.6360$2.50
Atlanta District10$2.8856$3.00
Tyler District9$3.3055$3.25
Waco District8$2.3353$2.92
Lubbock District12$2.7753$2.90
Elec condr (no.6) bare, TxDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Elec condr (no.6) bare, TxDOT: low bidder's median by quantity band
Quantity (LF)Low bidsLow-bid median
5 to 24568$2.62
250 to 1,25568$2.52
1,260 to 3,81568$2.49
3,825 to 56,07369$2.20
Elec condr (no.6) bare, TxDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest TxDOT contracts carrying Elec condr (no.6) bare
LetContractDistrictQuantityLow bidder's priceMedianEstimateBidsLow bidderSource
12 NOV 2026A00222829Dallas District1,500$3.54$3.50$2.755HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLCTxDOT
04 NOV 2026A00206976Austin District120$2.40$2.40$3.509LONE STAR SITEWORK, LLCTxDOT
04 NOV 2026A00212892Dallas District3,341$3.30$3.20$4.006INDUS ROAD & BRIDGE, INC.TxDOT
04 NOV 2026A00129572Dallas District245$3.00$2.91$2.354MARIO SINACOLA & SONS EXCAVATING, INC.TxDOT
04 NOV 2026A00221850Houston District140$1.75$3.06$2.505DECO CONTRACTORS, INC.TxDOT
03 NOV 2026A00206952Waco District30$2.15$2.85$3.009THE LEVY COMPANY, LLCTxDOT
03 NOV 2026A00218531Atlanta District462$2.65$2.88$3.5010NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTIONTxDOT
03 NOV 2026A00184974Austin District41,836$2.47$2.51$2.496AUSTIN BRIDGE & ROAD SERVICES, LPTxDOT
03 NOV 2026A00222928Houston District2,500$2.75$3.09$1.757TRAF-TEX, INC.TxDOT
03 NOV 2026A00206455Dallas District9,010$1.80$2.50$2.5013RCR TELECON LLCTxDOT
07 OCT 2026A00135746Dallas District170$5.60$2.86$4.009GARRET SHIELDS INFRASTRUCTURETxDOT
07 OCT 2026A00064192San Antonio District2,340$1.95$2.05$1.898HUNTER INDUSTRIES, LTD.TxDOT
07 OCT 2026A00192619Dallas District8,195$1.47$2.25$2.156SICE, INC.TxDOT
09 SEP 2026A00219945Austin District1,080$2.40$2.33$2.334VACA UNDERGROUND UTILITIES INCTxDOT
09 SEP 2026A00220213Austin District2,200$2.40$2.40$2.335VACA UNDERGROUND UTILITIES INCTxDOT
Latest TxDOT contracts carrying Elec condr (no.6) bare

Filter this item by your own quantity, district and period, or check your price against it, in the TxDOT explorer.

How these prices were read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are TxDOT's own: this item is compared with TxDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy