Prestr conc slab beam (5SB15) unit price, Texas

Low bidders on TxDOT contracts carried a median of $215.00 per LF for item 4256012, prestr conc slab beam (5sb15), from 06 FEB 2020 to 28 JUN 2023, across 55 low bids. Half of all 277 bids fell between $190.00 and $252.60.

Owner
Texas DOT
Item
4256012
Unit
LF
Latest letting
28 JUN 2023
$215.00Low bidder's median, per LF
$221.89Median of all bids, per LF
55Contracts in the window
$190.00Engineer's estimate, median per LF

By year of letting

Prestr conc slab beam (5SB15), TxDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20201818$182.50101$203.04
20211717$200.0085$210.00
20221919$255.0089$260.00
202311$185.002$217.50
Prestr conc slab beam (5SB15), TxDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Prestr conc slab beam (5SB15), TxDOT: unit prices by district, all lettings
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
Yoakum District11$192.1142$226.00
Dallas District5$180.0041$210.00
Lufkin District6$202.5030$226.08
Corpus Christi District5$155.0030$190.14
Brownwood District4$232.5022$220.00
San Antonio District3$267.5616$245.00
Paris District3$255.0013$260.00
Houston District3$230.009$220.00
Beaumont District3$315.008$343.50
Prestr conc slab beam (5SB15), TxDOT: unit prices by district, all lettings

Districts with at least three low bids, over all lettings.

By quantity

Prestr conc slab beam (5SB15), TxDOT: low bidder's median by quantity band
Quantity (LF)Low bidsLow-bid median
178 to 247.5013$235.00
247.50 to 45414$237.50
467.42 to 742.5014$215.35
771 to 12,72014$166.33
Prestr conc slab beam (5SB15), TxDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest TxDOT contracts carrying Prestr conc slab beam (5SB15)
LetContractDistrictQuantityLow bidder's priceMedianEstimateBidsLow bidderSource
28 JUN 202306233602Yoakum District10,098$185.00$217.50$250.002WEBBER, LLCTxDOT
30 JUN 202206223642Beaumont District247.11$315.00$344.50$250.002TEXAS MATERIALS GROUP, INC.TxDOT
29 JUN 202206223427Lufkin District247.50$291.00$301.50$215.004THK CONSTRUCTION LLCTxDOT
29 JUN 202206223430Paris District197.50$338.57$335.00$162.005HIGHWAY 19 CONSTRUCTION LLCTxDOT
29 JUN 202206223438Beaumont District247.50$330.00$330.00$250.003CROSS PLUS CONSTRUCTION, LLCTxDOT
05 MAY 202205223227Yoakum District247.50$246.80$301.00$230.005FUQUA CONSTRUCTION CO., INC.TxDOT
07 APR 202204223210Dallas District1,068$226.00$255.00$180.008NEW WORLD CONTRACTING, LLCTxDOT
07 APR 202204223217Bryan District247.11$266.00$296.50$350.004TREVWAY, INC.TxDOT
06 APR 202204223019Yoakum District494.91$325.00$275.00$225.005TEXAS STEEL INDUSTRIAL PLACING, LLCTxDOT
06 APR 202204223022Bryan District592.41$215.70$256.00$185.008FUQUA CONSTRUCTION CO., INC.TxDOT
04 MAR 202203223203Dallas District969.50$286.00$225.00$180.003STERLING DELAWARE HOLDING COMPANY, INC.TxDOT
04 MAR 202203223218Paris District494.21$255.00$260.00$230.003HODGES AND SON CONSTRUCTION COMPANY, INC.TxDOT
04 MAR 202203223223Beaumont District247.50$291.00$397.00$185.003DREWERY CONSTRUCTION COMPANY, INCORPORATEDTxDOT
03 MAR 202203223002Corpus Christi District12,720$200.00$195.00$166.006ANDERSON COLUMBIA CO., INC.TxDOT
04 FEB 202202223229Tyler District336$247.35$227.50$190.006SOUTH TEXAS ILLUMINATION, LLCTxDOT
Latest TxDOT contracts carrying Prestr conc slab beam (5SB15)

Filter this item by your own quantity, district and period, or check your price against it, in the TxDOT explorer.

How these prices were read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are TxDOT's own: this item is compared with TxDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy