Repair steel post with base plate unit price, Texas
Low bidders on TxDOT contracts carried a median of $125.00 per EACH for item 770-7019, repair steel post with base plate, over the 24 months to 19 NOV 2026, across 58 low bids. Half of all 233 bids fell between $100.00 and $300.00.
- Owner
- Texas DOT
- Item
- 770-7019
- Unit
- EACH
- Latest letting
- 19 NOV 2026
By year of letting
| Year | Contracts | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|---|
| 2024 | 2 | 1 | $1,415.00 | 11 | $350.00 |
| 2025 | 53 | 41 | $100.00 | 183 | $200.00 |
| 2026 | 19 | 16 | $150.00 | 39 | $150.00 |
Bid prices as published, not adjusted for inflation.
By district
| District | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|
| Houston District | 8 | $125.00 | 42 | $196.25 |
| Lufkin District | 11 | $75.00 | 33 | $100.00 |
| Atlanta District | 6 | $200.00 | 18 | $194.50 |
| Austin District | 3 | $100.00 | 18 | $312.50 |
| Dallas District | 3 | $100.00 | 15 | $100.00 |
| Fort Worth District | 3 | $200.00 | 12 | $200.00 |
| Bryan District | 3 | $200.00 | 12 | $200.00 |
| San Antonio District | 3 | $280.00 | 7 | $300.00 |
| Tyler District | 4 | $275.00 | 6 | $300.00 |
Districts with at least three low bids, over the last 24 months.
By quantity
| Quantity (EACH) | Low bids | Low-bid median |
|---|---|---|
| 1 to 5 | 14 | $100.00 |
| 5 to 5 | 15 | $200.00 |
| 5 to 10 | 14 | $175.00 |
| 10 to 150 | 15 | $100.00 |
The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.
Latest contracts with this item
| Let | Contract | District | Quantity | Low bidder's price | Median | Estimate | Bids | Low bidder | Source |
|---|---|---|---|---|---|---|---|---|---|
| 19 NOV 2026 | A00224139 | Paris District | 16 | n/a | $200.00 | $70.00 | 1 | AUSTIN BARRICADE COMPANY, L.L.C. | TxDOT |
| 12 AUG 2026 | A00223094 | Bryan District | 5 | n/a | $200.00 | $170.00 | 1 | RHINO EQUITY, LLC | TxDOT |
| 11 AUG 2026 | A00223019 | Bryan District | 5 | $200.00 | $200.00 | $170.00 | 1 | T&L CLEANING SERVICES LLC | TxDOT |
| 09 JUN 2026 | A00220019 | Houston District | 25 | $150.00 | $125.00 | $137.50 | 2 | ROY JORGENSEN ASSOCIATES, INC. | TxDOT |
| 27 MAY 2026 | A00221790 | Amarillo District | 5 | $258.50 | $134.25 | $100.00 | 2 | TI-ZACK CONCRETE, LLC | TxDOT |
| 13 MAY 2026 | A00220031 | Lufkin District | 5 | $100.00 | $100.00 | $100.00 | 2 | BK FIELD OPERATIONS LLC | TxDOT |
| 13 MAY 2026 | A00220032 | Lufkin District | 5 | $100.00 | $100.00 | $100.00 | 2 | ACE CONTRACTORS, INC. | TxDOT |
| 13 MAY 2026 | A00219922 | Austin District | 10 | $15.00 | $100.00 | $45.00 | 3 | RHINO EQUITY, LLC | TxDOT |
| 12 MAY 2026 | A00220799 | Tyler District | 5 | $300.00 | $300.00 | $100.00 | 1 | CATOCON, INC. | TxDOT |
| 12 MAY 2026 | A00218435 | Tyler District | 10 | $250.00 | $250.00 | $100.00 | 1 | CATOCON, INC. | TxDOT |
| 21 APR 2026 | A00219951 | Odessa District | 5 | n/a | $422.00 | $100.00 | 1 | HJC FARMS, INC. | TxDOT |
| 16 APR 2026 | A00212377 | San Angelo District | 2 | $250.00 | $225.00 | $200.00 | 4 | T&L CLEANING SERVICES LLC | TxDOT |
| 18 MAR 2026 | A00218937 | Atlanta District | 5 | $200.00 | $189.00 | $50.00 | 3 | CATOCON, INC. | TxDOT |
| 18 MAR 2026 | A00218938 | Atlanta District | 5 | $85.00 | $192.50 | $50.00 | 2 | AUSTIN BARRICADE COMPANY, L.L.C. | TxDOT |
| 18 MAR 2026 | A00218939 | Atlanta District | 5 | $200.00 | $200.00 | $50.00 | 1 | CATOCON, INC. | TxDOT |
Filter this item by your own quantity, district and period, or check your price against it, in the TxDOT explorer.
How these prices were read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
- Item codes and units are TxDOT's own: this item is compared with TxDOT contracts only.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.