Trenching and shoulder preparation unit price, Arkansas

Low bidders on ARDOT contracts carried a median of $186.87 per STA for item 215011, trenching and shoulder preparation, over the 24 months to 04 NOV 2026, across 51 low bids. Half of all 146 bids fell between $75.00 and $500.00.

Owner
Arkansas DOT
Item
215011
Unit
STA
Latest letting
04 NOV 2026
$186.87Low bidder's median, per STA
$212.86Median of all bids, per STA
51Contracts in the window

By year of letting

Trenching and shoulder preparation, ARDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
202288$355.2714$441.20
20231919$245.0929$300.00
20242222$217.9442$152.18
20252020$169.7862$250.00
20262525$215.0069$225.00
Trenching and shoulder preparation, ARDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By quantity

Trenching and shoulder preparation, ARDOT: low bidder's median by quantity band
Quantity (STA)Low bidsLow-bid median
1 to 2712$565.62
28 to 23313$250.00
238 to 47113$72.51
482 to 1,19613$85.00
Trenching and shoulder preparation, ARDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest ARDOT contracts carrying Trenching and shoulder preparation
LetContractCountyQuantityLow bidder's priceMedianBidsLow bidderSource
04 NOV 2026A10059Phillips482$59.64$59.641ATLAS ASPHALT, INC.ARDOT
04 NOV 2026A20044Arkansas1,196$85.00$85.004PINE BLUFF SAND & GRAVEL CO.ARDOT
04 NOV 2026040904Crawford167$872.00$1,666.304CROSSLAND CONSTRUCTION CO., INC.ARDOT
04 NOV 2026A40062Polk227$250.00$250.001BLACKSTONE CONSTRUCTION, LLCARDOT
04 NOV 2026A70050Clark655$110.00$126.392REDSTONE CONSTRUCTION GROUP, LLCARDOT
04 NOV 2026A90050Baxter471$44.20$34.602ATLAS ASPHALT, INC.ARDOT
12 AUG 2026030531Little River16$1,784.01$1,346.076MCGEORGE CONTRACTING CO., INC.ARDOT
08 APR 2026A30028Howard438$250.00$280.624BLACKSTONE CONSTRUCTION, LLCARDOT
08 APR 2026A40049Crawford28$475.00$955.003FORSGREN, INC.ARDOT
08 APR 2026A40050Scott63$250.00$270.004BLACKSTONE CONSTRUCTION, LLCARDOT
08 APR 2026A50046Independence279$45.14$60.072ATLAS ASPHALT, INC.ARDOT
08 APR 2026A70039Columbia5$400.00$2,644.502JET ASPHALT & ROCK CO., INC.ARDOT
08 APR 2026A80045Logan286$250.00$250.003BLACKSTONE CONSTRUCTION, LLCARDOT
04 MAR 2026A40051Polk868$300.00$300.001BLACKSTONE CONSTRUCTION, LLCARDOT
04 MAR 2026A50045White223$75.00$72.004CK ASPHALT, LLCARDOT
Latest ARDOT contracts carrying Trenching and shoulder preparation

Filter this item by your own quantity, county and period, or check your price against it, in the ARDOT explorer.

How these prices were read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are ARDOT's own: this item is compared with ARDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy