Caltrans letting results, April 26, 2023

5 contracts let by Caltrans on April 26, 2023, $10,894,832 in low bids, a median of 4 bidders per contract. On the 5 with an engineer's estimate, the low bid came in under it 2 times; median low bid +4.0% against the estimate.

Owner
Caltrans
Contracts
5
Low bids, total
$10,894,832
Data through
09 MAY 2023

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapAgainst estimateSource
11-2N1664Cold plane, RHMA overlay, pavement marking, & rumble stripDistrict 114Martin Marietta San Diego Aggregates$2,886,641$3,163,598+10%-6.0%Caltrans
08-1M4904Polyester concrete overlay and bridge deck treatmentDistrict 084Velarde Concrete Construction$2,826,987$3,483,413+23%+4.0%Caltrans
07-0W4004Concrete pavement slabs replacement & slurry shoulderDistrict 074Re Chaffee Construction Inc$2,705,704$2,981,210+10%+27%Caltrans
03-2G8804Modify changeable message sign systemsDistrict 032Studebaker Electric, Inc.$1,531,050$1,796,000+17%+8.0%Caltrans
02-2J4904Modify signal and lighting systems, replace AC surfacing, & stripingDistrict 024Robert J. Frank Construction, Inc.$944,450$968,000+2.0%-2.0%Caltrans
Caltrans contracts let on April 26, 2023, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than Caltrans received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy