5 contracts let by Caltrans on May 3, 2023, $17,869,183 in low bids, a median of 3 bidders per contract. On the 5 with an engineer's estimate, the low bid came in under it 1 times; median low bid +3.0% against the estimate.
- Owner
- Caltrans
- Contracts
- 5
- Low bids, total
- $17,869,183
- Data through
- 09 MAY 2023
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 08-1H4914 | Replace AC Surf, HMA (Type A), and cold central plant recycling | District 08 | 3 | Sully-Miller Contracting Company | $7,748,325 | $8,157,429 | +5.0% | -4.0% | Caltrans |
| 08-1M2204 | Polyester concrete overlay and replace joint seals | District 08 | 4 | Myers & Sons Construction, LLC | $5,450,000 | $6,317,317 | +16% | +3.0% | Caltrans |
| 11-2N1414 | Place methacrylate, polyester concrete, joint seals and repair spalls | District 11 | 3 | Truesdell Corporation of California, | $2,828,828 | $3,064,002 | +8.0% | +6.0% | Caltrans |
| 04-0Y2204 | Cold plane AC pavement and place HMA (Type A) | District 04 | 3 | Granite Rock Company | $1,416,920 | $1,486,100 | +5.0% | +43% | Caltrans |
| 07-0W4804 | Clean, line culverts and repair cracked or damaged walls | District 07 | 4 | Jabre Contracting Inc. | $425,110 | $556,440 | +31% | +2.0% | Caltrans |
Gap is the second bid over the low bid. Where a contract shows fewer bids than Caltrans received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.