CDOT unit bid prices and bid tabulations
Unit prices bid on 4 Colorado DOT contracts let from 11 DEC 2025 to 18 DEC 2025, read from CDOT's own tabulations. Every pay item is in the explorer.
- Contracts
- 4
- Bids
- 12
- Unit prices
- 1,221
- Latest letting
- 18 DEC 2025
Price a CDOT pay item
Loading the bids.
Check my bid
Add the lines you are pricing, with your quantity and unit price. Each line is placed against what bidders carried in the last 24 months, at a similar quantity when enough bids exist. Your numbers stay in this browser.
Competitors
Who bids, how often they are low, how far off they are when they lose, and how much they leave on the table when they win.
Lettings
Open any contract to read the full tabulation: every line, every bidder.
Where the numbers come from
Each price is copied from a bid tabulation the owner published after the letting. Nothing is estimated or averaged before it reaches this page.
How each bid was checked
For every bidder, quantity times unit price was summed over all lines of the contract and compared with the total bid printed by the owner. A bid is published only when the two match to within one dollar. The states marked not checkable or third party are explained in the table.
Read the numbers like an estimator
- Item codes and measurement rules are each owner's. Prices are compared inside one state and never pooled across states.
- Unit price moves with quantity, location and season. Set your quantity and region before you trust a median.
- Some bidders price a line at a cent and load the cost elsewhere. Those token prices, and bids more than three times the low bid, are left out of statistics by default and stay visible in tabulations.
- The low bidder's price on one line is not always the lowest price on that line. Orange marks the bidder who was low on the whole contract.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
Latest lettings
| Let | Contract | Region | Project | Bids | Low bid | Source |
|---|---|---|---|---|---|---|
| 18 DEC 2025 | C24846 | County line to purcell blvd | 3 | $12,305,351 | CDOT | |
| 18 DEC 2025 | C26234 | Culvert (11) remove & replace culvert locations combined with (8)rehab culvert locations. remove & replace culvert locations as shown in the | 3 | $8,859,323 | CDOT | |
| 18 DEC 2025 | C26274 | This is bridge replacement project near hayden, colorado in routt county along us 40 at mp 108.35. the work includes water control, a tempor | 5 | $2,440,781 | CDOT | |
| 11 DEC 2025 | C25682 | This project is located along us 40 between mp 111.5 to mp 126.5. the project will overlay the roadway with a 1" leveling layer and a 1.5" t | 2 | $12,017,516 | CDOT |
Where these numbers come from
CDOT Tabulation of Bids PDFs, read by OCR. Bids that did not match their published total are left out.
| Year | Contracts |
|---|---|
| 2025 | 4 |
Every state's coverage and check is on the bid results hub.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.