ODOT unit bid prices and bid tabulations
Unit prices bid on 4,408 Ohio DOT contracts let from 23 JAN 2020 to 12 NOV 2026, read from ODOT's own tabulations. 856 pay items have enough recent bids for a page of their own; every item is in the explorer.
- Contracts
- 4,408
- Bids
- 15,816
- Unit prices
- 1,093,243
- Latest letting
- 12 NOV 2026
Price a ODOT pay item
Loading the bids.
Check my bid
Add the lines you are pricing, with your quantity and unit price. Each line is placed against what bidders carried in the last 24 months, at a similar quantity when enough bids exist. Your numbers stay in this browser.
Competitors
Who bids, how often they are low, how far off they are when they lose, and how much they leave on the table when they win.
Lettings
Open any contract to read the full tabulation: every line, every bidder.
Where the numbers come from
Each price is copied from a bid tabulation the owner published after the letting. Nothing is estimated or averaged before it reaches this page.
How each bid was checked
For every bidder, quantity times unit price was summed over all lines of the contract and compared with the total bid printed by the owner. A bid is published only when the two match to within one dollar. The states marked not checkable or third party are explained in the table.
Read the numbers like an estimator
- Item codes and measurement rules are each owner's. Prices are compared inside one state and never pooled across states.
- Unit price moves with quantity, location and season. Set your quantity and region before you trust a median.
- Some bidders price a line at a cent and load the cost elsewhere. Those token prices, and bids more than three times the low bid, are left out of statistics by default and stay visible in tabulations.
- The low bidder's price on one line is not always the lowest price on that line. Orange marks the bidder who was low on the whole contract.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
The ODOT pay items bid most often
| Pay item | Code | Unit | Low-bid median | Low bids | Window | Bids, all time |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | $1.00 | 963 | Last 24 months | 13,386 |
| Commercial fertilizer | 659E20000 | TON | $1,000.00 | 610 | Last 24 months | 9,391 |
| Water | 659E35000 | MGAL | $1.00 | 614 | Last 24 months | 9,355 |
| Law enforcement officer with patrol car for assist | 614E11110 | HR | $95.00 | 691 | Last 24 months | 8,650 |
| Excavation | 203E10000 | CY | $32.00 | 573 | Last 24 months | 8,485 |
| Lime | 659E31000 | ACRE | $154.00 | 513 | Last 24 months | 8,071 |
| Seeding and mulching | 659E10000 | SY | $2.95 | 511 | Last 24 months | 8,051 |
| Aggregate base | 304E20000 | CY | $100.00 | 553 | Last 24 months | 8,014 |
| Embankment | 203E20000 | CY | $29.94 | 516 | Last 24 months | 7,986 |
| Subgrade compaction | 204E10000 | SY | $3.00 | 507 | Last 24 months | 7,645 |
| Non-tracking tack coat | 407E20000 | GAL | $3.50 | 562 | Last 24 months | 7,230 |
| Raised pavement marker removed | 621E54000 | EACH | $10.25 | 518 | Last 24 months | 6,945 |
| Rpm | 621E00100 | EACH | $42.00 | 515 | Last 24 months | 6,617 |
| Topsoil | 659E00300 | CY | $50.00 | 475 | Last 24 months | 6,213 |
| Pavement removed | 202E23000 | SY | $18.00 | 473 | Last 24 months | 6,191 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | $40.00 | 453 | Last 24 months | 6,014 |
| Removal of ground mounted post support and disposa | 630E86002 | EACH | $25.00 | 323 | Last 24 months | 5,981 |
| Guardrail removed | 202E38000 | FT | $3.00 | 408 | Last 24 months | 5,852 |
| Sign, flat sheet | 630E80100 | SF | $25.00 | 409 | Last 24 months | 5,830 |
| Repair seeding and mulching | 659E14000 | SY | $1.50 | 418 | Last 24 months | 5,777 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | $20.00 | 310 | Last 24 months | 5,322 |
| Portable changeable message sign, as per plan | 614E18601 | SNMT | $995.00 | 433 | Last 24 months | 5,023 |
| Center line, type 1 | 642E00300 | MI | $1,545.00 | 329 | Last 24 months | 4,686 |
| Tack coat | 407E10000 | GAL | $3.50 | 262 | Last 24 months | 4,619 |
| Guardrail, type mgs | 606E15050 | FT | $22.77 | 340 | Last 24 months | 4,533 |
| Edge line, 6", type 1 | 642E00104 | MI | $1,200.00 | 312 | Last 24 months | 4,463 |
| Ground mounted support, no. 3 post | 630E03100 | FT | $17.50 | 292 | Last 24 months | 4,184 |
| Porous backfill with geotextile fabric | 518E21200 | CY | $140.00 | 257 | Last 24 months | 3,919 |
| Water | 616E10000 | MGAL | $55.00 | 247 | Last 24 months | 3,897 |
| Asphalt concrete for maintaining traffic | 614E13000 | CY | $275.00 | 258 | Last 24 months | 3,863 |
| Portable barrier, unanchored | 622E41100 | FT | $26.00 | 248 | Last 24 months | 3,768 |
| Concrete masonry | 602E20000 | CY | $2,596.97 | 250 | Last 24 months | 3,703 |
| Field office, type b | 619E16010 | MNTH | $2,300.00 | 263 | Last 24 months | 3,694 |
| Soil analysis test | 659E00100 | EACH | $133.00 | 273 | Last 24 months | 3,588 |
| 1" preformed expansion joint filler | 516E13600 | SF | $12.00 | 213 | Last 24 months | 3,486 |
| Ground mounted support, no. 2 post | 630E02100 | FT | $15.90 | 160 | Last 24 months | 3,471 |
| Asphalt concrete surface course, type 1, (448), pg | 441E50000 | CY | $296.50 | 92 | Last 24 months | 3,381 |
| Asphalt concrete base, PG64-22, (449) | 301E56000 | CY | $285.00 | 406 | Last 24 months | 3,366 |
| Removal of ground mounted sign and reerection | 630E85100 | EACH | $85.00 | 237 | Last 24 months | 3,345 |
| Anchor assembly, mgs type t | 606E26550 | EACH | $1,360.00 | 268 | Last 24 months | 3,313 |
| Work zone center line, class iii, 642 paint | 614E21550 | MI | $1,050.00 | 268 | Last 24 months | 3,288 |
| Proof rolling | 204E45000 | HR | $250.00 | 246 | Last 24 months | 3,132 |
| Inter-seeding | 659E15000 | SY | $1.00 | 258 | Last 24 months | 3,100 |
| Stop line | 644E00500 | FT | $9.00 | 315 | Last 24 months | 3,087 |
| Pipe removed, 24" and under | 202E35100 | FT | $19.00 | 689 | All lettings | 3,038 |
| Ground rod | 625E32000 | EACH | $300.00 | 228 | Last 24 months | 3,027 |
| Center line | 646E10200 | MI | $10,334 | 233 | Last 24 months | 3,002 |
| Edge line, 6" | 646E10010 | MI | $9,000.00 | 222 | Last 24 months | 2,969 |
| Compacted aggregate | 617E10100 | CY | $110.00 | 246 | Last 24 months | 2,949 |
| Wearing course removed | 202E23500 | SY | $10.00 | 199 | Last 24 months | 2,931 |
| Asphalt concrete base, PG64-22 | 301E46000 | CY | $220.00 | 577 | All lettings | 2,868 |
| Type 2 waterproofing | 512E33000 | SY | $40.00 | 197 | Last 24 months | 2,859 |
| Walk removed | 202E30000 | SF | $4.50 | 246 | Last 24 months | 2,858 |
| Aggregate drains | 605E31100 | FT | $21.00 | 174 | Last 24 months | 2,849 |
| Curb removed | 202E32000 | FT | $11.00 | 231 | Last 24 months | 2,848 |
| Patching concrete structure, as per plan | 519E11101 | SF | $185.00 | 216 | Last 24 months | 2,806 |
| Work zone stop line, class iii, 642 paint | 614E26610 | FT | $3.60 | 260 | Last 24 months | 2,770 |
| Precast reinforced concrete outlet | 611E99710 | EACH | $427.00 | 184 | Last 24 months | 2,754 |
| Treating concrete bridge decks with gravity fed re | 512E73500 | SY | $12.00 | 242 | Last 24 months | 2,738 |
| Work zone marking sign | 614E12460 | EACH | $92.00 | 253 | Last 24 months | 2,733 |
| 6" perforated corrugated plastic pipe | 518E40000 | FT | $12.00 | 179 | Last 24 months | 2,656 |
| Field painting structural steel, intermediate coat | 514E00060 | SF | $4.72 | 122 | Last 24 months | 2,547 |
| Epoxy coated reinforcing steel | 509E10000 | LB | $1.70 | 584 | All lettings | 2,509 |
| Curb, type 6 | 609E26000 | FT | $41.00 | 188 | Last 24 months | 2,441 |
| Catch basin removed | 202E58100 | EACH | $500.00 | 175 | Last 24 months | 2,401 |
| Fence removed | 202E75000 | FT | $5.00 | 147 | Last 24 months | 2,380 |
| Work zone edge line, class iii, 6", 642 paint | 614E22360 | MI | $810.50 | 214 | Last 24 months | 2,374 |
| Final inspection repair | 514E10000 | EACH | $200.00 | 104 | Last 24 months | 2,370 |
| Center line | 644E00300 | MI | $7,390.00 | 205 | Last 24 months | 2,365 |
| Grinding fins, tears, slivers on existing structur | 514E00504 | MNHR | $150.00 | 107 | Last 24 months | 2,362 |
| Surface preparation of existing structural steel | 514E00050 | SF | $14.00 | 102 | Last 24 months | 2,314 |
| Field painting of existing structural steel, prime | 514E00056 | SF | $4.80 | 105 | Last 24 months | 2,294 |
| Asphalt concrete surface course, type 1, (449), pg | 441E70000 | CY | $375.40 | 277 | Last 24 months | 2,277 |
| 4" concrete walk | 608E10000 | SF | $15.00 | 171 | Last 24 months | 2,257 |
| Excavation of subgrade | 204E13000 | CY | $30.00 | 165 | Last 24 months | 2,208 |
| Curb ramp | 608E52000 | SF | $25.00 | 173 | Last 24 months | 2,173 |
| Sign post reflector | 630E08600 | EACH | $46.63 | 172 | Last 24 months | 2,168 |
| Field painting structural steel, finish coat | 514E00066 | SF | $3.75 | 114 | Last 24 months | 2,154 |
| Epoxy coated steel reinforcement | 509E10000 | LB | $2.00 | 310 | Last 24 months | 2,145 |
| Object marker, two way | 614E13360 | EACH | $21.75 | 117 | Last 24 months | 2,144 |
| Lane arrow | 644E01300 | EACH | $120.00 | 183 | Last 24 months | 2,084 |
| Object marker, one way | 614E13350 | EACH | $20.00 | 143 | Last 24 months | 2,078 |
| Geotextile fabric | 204E50000 | SY | $2.27 | 166 | Last 24 months | 2,025 |
| Mgs bridge terminal assembly, type 1 | 606E35002 | EACH | $2,550.00 | 152 | Last 24 months | 2,022 |
| Manhole adjusted to grade | 611E99654 | EACH | $1,100.00 | 203 | Last 24 months | 1,997 |
| 6" non-perforated corrugated plastic pipe, includi | 518E40010 | FT | $20.00 | 130 | Last 24 months | 1,928 |
| 6" conduit, type f for underdrain outlets | 611E00510 | FT | $30.00 | 145 | Last 24 months | 1,911 |
| Approach slab removed | 202E22900 | SY | $52.00 | 127 | Last 24 months | 1,902 |
| Rock channel protection, type c with filter | 601E32200 | CY | $220.00 | 121 | Last 24 months | 1,865 |
| Guardrail, type mgs with long posts | 606E15100 | FT | $25.00 | 152 | Last 24 months | 1,853 |
| Prime coat, as per plan | 408E10001 | GAL | $5.00 | 122 | Last 24 months | 1,812 |
| Edge line, 6" | 644E00104 | MI | $5,175.00 | 142 | Last 24 months | 1,794 |
| Pavement repair | 253E02000 | CY | $402.50 | 162 | Last 24 months | 1,766 |
| Work zone impact attenuator, 24" wide hazards, (bi | 614E12384 | EACH | $2,352.94 | 110 | Last 24 months | 1,765 |
| Stop line | 646E10400 | FT | $12.50 | 148 | Last 24 months | 1,761 |
| Transverse/diagonal line | 644E00700 | FT | $8.00 | 159 | Last 24 months | 1,758 |
| Tied concrete block mat with type 1 underlayment | 601E21050 | SY | $157.50 | 158 | Last 24 months | 1,751 |
| Asphalt concrete intermediate course, type 2, (448 | 441E50300 | CY | $220.00 | 41 | Last 24 months | 1,747 |
| Class QC1 concrete, footing | 511E46510 | CY | $800.00 | 103 | Last 24 months | 1,742 |
| Work zone impact attenuator, 24" wide hazards, (un | 614E12380 | EACH | $2,300.00 | 153 | Last 24 months | 1,732 |
| Work zone center line, class i, 642 paint | 614E21100 | MI | $1,382.50 | 142 | Last 24 months | 1,725 |
| Trench | 625E29000 | FT | $13.86 | 119 | Last 24 months | 1,718 |
| 12" conduit, type b | 611E04400 | FT | $102.95 | 126 | Last 24 months | 1,709 |
| Removal of existing coatings from concrete surface | 512E74000 | SY | $30.00 | 188 | Last 24 months | 1,700 |
| Full depth pavement sawing | 252E01500 | FT | $4.00 | 96 | Last 24 months | 1,681 |
| Manhole, no. 3 | 611E99574 | EACH | $5,600.00 | 133 | Last 24 months | 1,674 |
| Headwall removed | 202E20010 | EACH | $540.00 | 111 | Last 24 months | 1,655 |
| Valve box adjusted to grade | 638E10800 | EACH | $500.00 | 160 | Last 24 months | 1,646 |
| Sealing of concrete surfaces (non-epoxy) | 512E10050 | SY | $15.00 | 113 | Last 24 months | 1,620 |
| Pull box, 725.08, 18" | 625E30700 | EACH | $1,250.00 | 129 | Last 24 months | 1,620 |
| 12" conduit, type c | 611E04600 | FT | $100.00 | 122 | Last 24 months | 1,616 |
| Work zone stop line, class i | 614E26000 | FT | $4.00 | 109 | Last 24 months | 1,613 |
| Sign, flat sheet, 730.20 | 630E80100 | SF | $30.00 | 35 | Last 24 months | 1,597 |
| Special - steel drip strip | 518E22300 | FT | $20.00 | 125 | Last 24 months | 1,569 |
| Dowel holes with nonshrink, nonmetallic grout | 510E10000 | EACH | $32.00 | 106 | Last 24 months | 1,563 |
| 6" conduit, type f | 611E01500 | FT | $25.00 | 103 | Last 24 months | 1,548 |
| Catch basin, no. 2-2B | 611E98470 | EACH | $2,800.00 | 116 | Last 24 months | 1,538 |
| Pull box, 725.08, 24" | 625E30706 | EACH | $1,500.00 | 99 | Last 24 months | 1,537 |
| Catch basin adjusted to grade | 611E98630 | EACH | $1,125.00 | 144 | Last 24 months | 1,535 |
| Rock channel protection, type b with filter | 601E32100 | CY | $150.00 | 101 | Last 24 months | 1,506 |
| Work zone stop line, class i, 642 paint | 614E26200 | FT | $4.00 | 104 | Last 24 months | 1,500 |
| 2" preformed expansion joint filler | 516E13900 | SF | $12.00 | 120 | Last 24 months | 1,468 |
| Field office, type a | 619E16000 | MNTH | $1,800.00 | 52 | Last 24 months | 1,460 |
| Compacted aggregate, as per plan | 617E10101 | CY | $98.27 | 109 | Last 24 months | 1,436 |
| Asphalt concrete surface course, type 1, (448), as | 441E50101 | CY | $215.00 | 35 | Last 24 months | 1,427 |
| Connection, fused pull apart | 625E00450 | EACH | $150.00 | 109 | Last 24 months | 1,423 |
| Lane arrow | 646E20300 | EACH | $169.00 | 123 | Last 24 months | 1,368 |
| Work zone lane line, class iii, 6", 642 paint | 614E20560 | MI | $650.00 | 146 | Last 24 months | 1,358 |
| Anchor assembly, mgs type e (mash 2016) | 606E26150 | EACH | $2,584.12 | 108 | Last 24 months | 1,356 |
| Work zone center line, class i | 614E21000 | MI | $1,225.00 | 102 | Last 24 months | 1,320 |
| Channelizing line, 8" | 644E00400 | FT | $2.30 | 96 | Last 24 months | 1,311 |
| Catch basin, no. 3A | 611E98180 | EACH | $4,138.58 | 97 | Last 24 months | 1,306 |
| Work zone edge line, class i, 6", 642 paint | 614E22110 | MI | $1,175.00 | 113 | Last 24 months | 1,297 |
| Work zone channelizing line, class iii, 8", 642 pa | 614E23680 | FT | $0.80 | 103 | Last 24 months | 1,294 |
| Connection, unfused permanent | 625E00480 | EACH | $132.50 | 104 | Last 24 months | 1,286 |
| Granular material, type b | 204E30010 | CY | $70.00 | 94 | Last 24 months | 1,284 |
| No. 10 awg pole and bracket cable | 625E23400 | FT | $2.00 | 96 | Last 24 months | 1,270 |
| Underground warning/marking tape | 625E36010 | FT | $2.00 | 66 | Last 24 months | 1,255 |
| Lane line, 6", type 1 | 642E00204 | MI | $700.00 | 94 | Last 24 months | 1,243 |
| Digital speed limit (dsl) sign assembly | 808E18700 | SNMT | $700.00 | 127 | Last 24 months | 1,235 |
| Unclassified excavation | 503E21100 | CY | $102.16 | 96 | Last 24 months | 1,232 |
| Increased barrier delineation | 614E11630 | FT | $1.98 | 94 | Last 24 months | 1,231 |
| Barrier reflector, type 2 (bidirectional) | 626E00110 | EACH | $13.00 | 68 | Last 24 months | 1,224 |
| Pipe removed, 24" diameter and under | 202E35100 | FT | $25.00 | 302 | Last 24 months | 1,222 |
| Embankment, as per plan | 203E20001 | CY | $54.65 | 96 | Last 24 months | 1,218 |
| Semi-integral abutment expansion joint seal | 516E14020 | FT | $45.00 | 86 | Last 24 months | 1,210 |
| Asphalt concrete intermediate course, type 2, (449 | 441E70300 | CY | $314.00 | 143 | Last 24 months | 1,204 |
| Slope erosion protection | 670E00500 | SY | $2.00 | 108 | Last 24 months | 1,202 |
| Pipe removed, over 24" | 202E35200 | FT | $35.79 | 256 | All lettings | 1,190 |
| 15" conduit, type b | 611E05900 | FT | $118.50 | 82 | Last 24 months | 1,179 |
706 more items have a page; search any item in the explorer above.
Latest lettings
| Let | Contract | County | Project | Bids | Low bid | Source |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260459 | FUL | FUL-US 20A-19.20 Slide Repair (SLIDE REPAIR) | 5 | $1,265,940 | ODOT |
| 12 NOV 2026 | 260489 | ASD | ASD-IR 71-00.00 (FOUR LANE RESURFACING) | 2 | $12,774,168 | ODOT |
| 12 NOV 2026 | 260490 | ATH | ATH-US 50-01.77 (FOUR LANE RESURFACING) | 1 | $8,350,586 | ODOT |
| 12 NOV 2026 | 260491 | BEL | BEL-SR 7-25.27 (SLIDE REPAIR) | 8 | $844,260 | ODOT |
| 12 NOV 2026 | 260492 | CLA | CLA-LMT Culvert Replacement (CULVERT REPLACEMENT) | 3 | $197,783 | ODOT |
| 12 NOV 2026 | 260493 | CLI | CLI-US 68-09.42 (CULVERT REPLACEMENT) | 5 | $239,218 | ODOT |
| 12 NOV 2026 | 260495 | COL | COL-SR 9-15.244 (SIGNALIZATION) | 3 | $108,791 | ODOT |
| 12 NOV 2026 | 260497 | District 1 | D01-OL FY27 (BRIDGE REPAIR) | 4 | $1,242,291 | ODOT |
| 12 NOV 2026 | 260499 | DEL | DEL-/UNI-SIGN-FY2027 (SIGNING) | 3 | $413,173 | ODOT |
| 12 NOV 2026 | 260501 | GEA | GEA-SR 87-03.18 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 | $2,236,334 | ODOT |
| 12 NOV 2026 | 260502 | HAM | HAM-IR 275-05.25 (SLIDE REPAIR) | 4 | $1,018,980 | ODOT |
| 12 NOV 2026 | 260504 | KNO | KNO-US 62-00.00 (TWO LANE RESURFACING) | 2 | $4,851,899 | ODOT |
Where these numbers come from
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
| Year | Contracts |
|---|---|
| 2020 | 701 |
| 2021 | 706 |
| 2022 | 669 |
| 2023 | 609 |
| 2024 | 599 |
| 2025 | 609 |
| 2026 | 515 |
Every state's coverage and check is on the bid results hub.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.