Low bidders on FDOT contracts carried a median of $11,750 per GM for item 0713-103131, permanent tape, white, skip/dotted, 6" for concrete surfaces, from 31 JAN 2018 to 19 JUN 2024, across 203 low bids. Half of all 800 bids fell between $7,921.81 and $14,702.

Owner
Florida DOT
Item
0713-103131
Unit
GM
Latest letting
19 JUN 2024
$11,750Low bidder's median, per GM
$10,549Median of all bids, per GM
203Contracts in the window

By year of letting

Permanent tape, white, skip/dotted, 6" for concrete surfaces, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20183030$8,636.02148$8,335.52
20192323$9,468.0096$9,356.06
20202121$12,188100$8,535.00
20213232$8,468.20145$8,250.00
20223434$12,500101$12,000
20233838$14,987119$13,700
20242525$12,70091$13,287
Permanent tape, white, skip/dotted, 6" for concrete surfaces, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Permanent tape, white, skip/dotted, 6" for concrete surfaces, FDOT: unit prices by district, all lettings
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 258$12,617172$12,050
District 425$7,524.00132$9,200.00
District 127$10,602116$10,157
District 726$9,512.70114$9,415.89
District 525$11,825112$10,735
District 616$10,10080$8,000.00
District 325$14,92772$14,504
Permanent tape, white, skip/dotted, 6" for concrete surfaces, FDOT: unit prices by district, all lettings

Districts with at least three low bids, over all lettings.

By quantity

Permanent tape, white, skip/dotted, 6" for concrete surfaces, FDOT: low bidder's median by quantity band
Quantity (GM)Low bidsLow-bid median
0.00 to 0.0950$13,410
0.09 to 0.1751$13,000
0.18 to 0.7251$11,500
0.79 to 29.9051$8,587.50
Permanent tape, white, skip/dotted, 6" for concrete surfaces, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Permanent tape, white, skip/dotted, 6" for concrete surfaces
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
19 JUN 2024T7501District 720.63$9,495.86$9,500.004WEBBER, LLCFDOT
22 MAY 2024T1865District 10.11$11,592$10,1353AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
22 MAY 2024T3922District 30.09$11,725$12,1002C.W. ROBERTS CONTRACTING, INC.FDOT
22 MAY 2024T4655District 40.09$13,000$13,2504OHLA USA INCFDOT
22 MAY 2024T4677District 40.12$9,200.00$11,9504WEEKLEY ASPHALT PAVING, INC.FDOT
22 MAY 2024T7540District 71.88$7,880.35$7,689.393PREFERRED MATERIALS INC.FDOT
15 MAY 2024T6539District 63.37$11,750$9,000.003PRINCE CONTRACTING, LLC.FDOT
24 APR 2024T1894District 10.13$12,700$12,5354C.W. ROBERTS CONTRACTING, INC.FDOT
24 APR 2024T5824District 50.10$13,145$14,5267MASCI GENERAL CONTRACTORS, INCFDOT
17 APR 2024T7531District 70.11$12,400$15,3252C.W. ROBERTS CONTRACTING, INC.FDOT
27 MAR 2024T1857District 10.36$13,700$13,2875WATSON CIVIL CONSTRUCTION, INC.FDOT
27 MAR 2024T1878District 11.18$18,000$18,0003C.W. ROBERTS CONTRACTING, INC.FDOT
28 FEB 2024T1882District 10.46$17,501$17,5164GENERAL ASPHALT COMPANY, LLCFDOT
28 FEB 2024T2970District 20.34$12,000$18,5002PREFERRED MATERIALS INC.FDOT
28 FEB 2024T2976District 20.12$26,352$20,0003ANDERSON COLUMBIA CO., INC.FDOT
Latest FDOT contracts carrying Permanent tape, white, skip/dotted, 6" for concrete surfaces

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy