Permanent tape, black, skip/dotted, 6" for concrete surfaces unit price, Florida
Low bidders on FDOT contracts carried a median of $10,725 per GM for item 0713-103331, permanent tape, black, skip/dotted, 6" for concrete surfaces, from 31 JAN 2018 to 19 JUN 2024, across 168 low bids. Half of all 658 bids fell between $7,640.70 and $13,383.
- Owner
- Florida DOT
- Item
- 0713-103331
- Unit
- GM
- Latest letting
- 19 JUN 2024
By year of letting
| Year | Contracts | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|---|
| 2018 | 25 | 25 | $8,700.00 | 113 | $8,500.00 |
| 2019 | 19 | 19 | $9,225.00 | 83 | $9,074.21 |
| 2020 | 17 | 17 | $9,930.00 | 81 | $8,400.00 |
| 2021 | 26 | 26 | $7,850.00 | 124 | $7,881.18 |
| 2022 | 31 | 31 | $12,000 | 92 | $10,898 |
| 2023 | 35 | 35 | $14,974 | 113 | $12,200 |
| 2024 | 15 | 15 | $11,725 | 52 | $12,640 |
Bid prices as published, not adjusted for inflation.
By district
| District | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|
| District 2 | 46 | $12,165 | 135 | $10,700 |
| District 4 | 22 | $7,016.61 | 116 | $7,717.00 |
| District 1 | 26 | $10,001 | 109 | $10,003 |
| District 7 | 24 | $9,342.27 | 108 | $9,129.60 |
| District 5 | 16 | $10,340 | 78 | $10,253 |
| District 3 | 24 | $14,244 | 69 | $13,560 |
| District 6 | 9 | $8,000.00 | 41 | $8,000.00 |
Districts with at least three low bids, over all lettings.
By quantity
| Quantity (GM) | Low bids | Low-bid median |
|---|---|---|
| 0.00 to 0.09 | 42 | $13,730 |
| 0.10 to 0.23 | 42 | $12,050 |
| 0.24 to 1.02 | 42 | $9,576.53 |
| 1.06 to 29.88 | 42 | $8,579.77 |
The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.
Latest contracts with this item
| Let | Contract | District | Quantity | Low bidder's price | Median | Bids | Low bidder | Source |
|---|---|---|---|---|---|---|---|---|
| 19 JUN 2024 | T7501 | District 7 | 20.54 | $9,499.54 | $9,500.00 | 4 | WEBBER, LLC | FDOT |
| 22 MAY 2024 | T1865 | District 1 | 0.11 | $11,592 | $10,135 | 3 | AJAX PAVING INDUSTRIES OF FLORIDA LLC | FDOT |
| 22 MAY 2024 | T3922 | District 3 | 0.09 | $11,725 | $12,100 | 2 | C.W. ROBERTS CONTRACTING, INC. | FDOT |
| 22 MAY 2024 | T4655 | District 4 | 0.01 | $11,000 | $12,250 | 4 | OHLA USA INC | FDOT |
| 15 MAY 2024 | T6539 | District 6 | 1.57 | $11,700 | $9,500.00 | 3 | PRINCE CONTRACTING, LLC. | FDOT |
| 24 APR 2024 | T1894 | District 1 | 0.13 | $12,700 | $12,378 | 4 | C.W. ROBERTS CONTRACTING, INC. | FDOT |
| 27 MAR 2024 | T1857 | District 1 | 0.35 | $13,400 | $13,092 | 5 | WATSON CIVIL CONSTRUCTION, INC. | FDOT |
| 27 MAR 2024 | T1878 | District 1 | 1.18 | $9,400.00 | $10,844 | 3 | C.W. ROBERTS CONTRACTING, INC. | FDOT |
| 28 FEB 2024 | T1882 | District 1 | 0.49 | $17,501 | $17,578 | 4 | GENERAL ASPHALT COMPANY, LLC | FDOT |
| 28 FEB 2024 | T2976 | District 2 | 0.10 | $26,352 | $20,000 | 3 | ANDERSON COLUMBIA CO., INC. | FDOT |
| 28 FEB 2024 | T7519 | District 7 | 0.11 | $11,500 | $14,000 | 5 | WATSON CIVIL CONSTRUCTION, INC. | FDOT |
| 31 JAN 2024 | T1867 | District 1 | 0.38 | $13,400 | $13,000 | 5 | AJAX PAVING INDUSTRIES OF FLORIDA LLC | FDOT |
| 31 JAN 2024 | T2964 | District 2 | 2.12 | $11,000 | $12,000 | 3 | DE MOYA HIGHWAY INFRASTRUCTURE LLC | FDOT |
| 31 JAN 2024 | T3885 | District 3 | 0.12 | $12,632 | $13,165 | 2 | ANDERSON COLUMBIA CO., INC. | FDOT |
| 31 JAN 2024 | T6575 | District 6 | 0.08 | $17,550 | $17,400 | 2 | GENERAL ASPHALT COMPANY, LLC | FDOT |
Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.
How these prices were read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
- Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.