Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement unit price, Florida

Low bidders on FDOT contracts carried a median of $45,301 per GM for item 0713-103102, permanent tape, white, solid, 8" exit lane at interchange on concrete pavement, over the 24 months to 28 OCT 2026, across 17 low bids. Half of all 69 bids fell between $42,113 and $51,958.

Owner
Florida DOT
Item
0713-103102
Unit
GM
Latest letting
26 AUG 2026
$45,301Low bidder's median, per GM
$47,254Median of all bids, per GM
17Contracts in the window

By year of letting

Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
201833$29,60014$33,680
202033$32,50019$33,170
202133$39,03911$36,000
202222$49,9782$49,978
202377$49,71019$44,500
202455$42,26818$44,500
202588$46,10130$48,324
202699$45,30139$46,600
Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement, FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 35$47,00015$50,000
District 24$44,00013$41,117
Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement, FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement, FDOT: low bidder's median by quantity band
Quantity (GM)Low bidsLow-bid median
0.01 to 0.024$49,640
0.03 to 0.054$47,614
0.05 to 0.074$49,000
0.07 to 0.695$44,000
Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
26 AUG 2026T1945District 10.07$36,513$42,1135PREFERRED MATERIALS INC.FDOT
29 JUL 2026T2A29District 20.10$38,000$42,8774DUVAL ASPHALT PRODUCTS, INC.FDOT
29 APR 2026T3995District 30.04$44,908$49,7582ANDERSON COLUMBIA CO., INC.FDOT
31 MAR 2026T3845District 30.69$50,000$51,0004PHOENIX CONSTRUCTION SERVICES, INC.FDOT
25 MAR 2026T6591District 60.01$300,000$48,2507WEEKLEY ASPHALT PAVING, INC.FDOT
25 FEB 2026T2A37District 20.03$50,000$45,0005GOSALIA CONCRETE CONSTRUCTORS, INC.FDOT
25 FEB 2026T2A58District 20.07$36,000$38,8333PREFERRED MATERIALS INC.FDOT
25 FEB 2026T7601District 70.05$45,301$42,8716PREFERRED MATERIALS INC.FDOT
28 JAN 2026T3988District 30.04$49,927$50,7873ANDERSON COLUMBIA CO., INC.FDOT
03 DEC 2025T2A52District 20.05$67,618$67,6181ANDERSON COLUMBIA CO., INC.FDOT
24 SEP 2025T6592District 60.19$44,000$47,6977ROADWAY CONSTRUCTION, LLCFDOT
11 JUN 2025T5851District 50.07$51,000$51,0005JR. DAVIS CONSTRUCTION CO., INC.FDOT
28 MAY 2025T3956District 30.01$39,000$48,1483C.W. ROBERTS CONTRACTING, INC.FDOT
26 MAR 2025T3935District 30.07$47,000$47,0003C.W. ROBERTS CONTRACTING, INC.FDOT
26 MAR 2025T4710District 40.02$34,000$39,0002OHLA USA INCFDOT
Latest FDOT contracts carrying Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.