Special guardrail post- special steel post for concrete structure mount unit price, Florida

Low bidders on FDOT contracts carried a median of $312.89 per EACH for item 0536-7-2, special guardrail post- special steel post for concrete structure mount, over the 24 months to 28 OCT 2026, across 23 low bids. Half of all 91 bids fell between $279.75 and $403.78.

Owner
Florida DOT
Item
0536-7-2
Unit
EACH
Latest letting
26 AUG 2026
$312.89Low bidder's median, per EACH
$330.00Median of all bids, per EACH
23Contracts in the window

By year of letting

Special guardrail post- special steel post for concrete structure mount, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20181212$220.5648$212.04
20191212$282.6343$284.00
202077$209.8935$300.00
20211414$260.0272$260.00
20221111$315.0048$325.00
20231919$350.0061$337.00
20241616$387.5061$385.00
20251313$312.8953$350.00
202688$301.0131$300.78
Special guardrail post- special steel post for concrete structure mount, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Special guardrail post- special steel post for concrete structure mount, FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 28$399.4124$275.25
District 74$328.6417$334.98
District 35$350.0014$330.00
Special guardrail post- special steel post for concrete structure mount, FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Special guardrail post- special steel post for concrete structure mount, FDOT: low bidder's median by quantity band
Quantity (EACH)Low bidsLow-bid median
1 to 25$350.00
3 to 66$331.44
6 to 256$381.00
25 to 1216$267.57
Special guardrail post- special steel post for concrete structure mount, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Special guardrail post- special steel post for concrete structure mount
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
26 AUG 2026T2A77District 26$618.00$296.773PEAVY & SON CONSTRUCTION CO., INC.FDOT
20 MAY 2026T3987District 31$310.00$315.004C.W. ROBERTS CONTRACTING, INC.FDOT
20 MAY 2026T3992District 32$350.00$330.003ROADS, INC. OF NWFFDOT
25 MAR 2026T1919District 19$584.47$422.314AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
25 FEB 2026T2A37District 262$267.55$268.005GOSALIA CONCRETE CONSTRUCTORS, INC.FDOT
25 FEB 2026T2A60District 2121$206.53$185.762ANDERSON COLUMBIA CO., INC.FDOT
25 FEB 2026T7583District 74$292.03$300.785PREFERRED MATERIALS INC.FDOT
28 JAN 2026T2A54District 23$250.00$250.005PREFERRED MATERIALS INC.FDOT
03 DEC 2025T3958District 344$50.00$52.502MURPHREE BRIDGE CORPORATIONFDOT
03 DEC 2025T7572District 742$365.26$395.005PREFERRED MATERIALS INC.FDOT
29 OCT 2025T3983District 320$400.00$400.003YOROCA ENGINEERING CONTRACTORS,FDOT
24 SEP 2025T2A38District 22$309.92$340.754ANDERSON COLUMBIA CO., INC.FDOT
27 AUG 2025T4688District 444$267.59$267.597CENTRAL CIVIL CONSTRUCTION CO.FDOT
30 JUL 2025T5819District 59$362.00$500.008RANGER CONSTRUCTION INDUSTRIES, INC.FDOT
28 MAY 2025T2A20District 22$510.65$510.651ANDERSON COLUMBIA CO., INC.FDOT
Latest FDOT contracts carrying Special guardrail post- special steel post for concrete structure mount

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy