Utility fixture, valve assembly, furnish and install, 12" unit price, Florida
Low bidders on FDOT contracts carried a median of $7,235.06 per EACH for item 1080-24112, utility fixture, valve assembly, furnish and install, 12", over the 24 months to 28 OCT 2026, across 10 low bids. Half of all 47 bids fell between $6,359.96 and $11,035.
- Owner
- Florida DOT
- Item
- 1080-24112
- Unit
- EACH
- Latest letting
- 28 OCT 2026
By year of letting
| Year | Contracts | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|---|
| 2018 | 10 | 10 | $2,850.00 | 57 | $3,051.79 |
| 2019 | 6 | 6 | $3,431.62 | 34 | $3,494.05 |
| 2020 | 3 | 3 | $4,500.00 | 19 | $4,057.47 |
| 2021 | 5 | 5 | $3,800.00 | 28 | $4,377.50 |
| 2022 | 4 | 4 | $5,241.66 | 11 | $5,800.00 |
| 2023 | 5 | 5 | $6,435.00 | 22 | $6,720.86 |
| 2024 | 2 | 2 | $7,189.37 | 7 | $7,500.00 |
| 2025 | 5 | 5 | $7,451.21 | 24 | $7,550.00 |
| 2026 | 5 | 5 | $5,900.00 | 23 | $8,000.00 |
Bid prices as published, not adjusted for inflation.
By district
| District | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|
| District 7 | 4 | $5,888.56 | 19 | $6,482.00 |
| District 4 | 3 | $7,451.21 | 15 | $7,451.21 |
Districts with at least three low bids, over the last 24 months.
Latest contracts with this item
| Let | Contract | District | Quantity | Low bidder's price | Median | Bids | Low bidder | Source |
|---|---|---|---|---|---|---|---|---|
| 28 OCT 2026 | T7591 | District 7 | 1 | $5,828.93 | $6,247.27 | 5 | PREFERRED MATERIALS INC. | FDOT |
| 30 SEP 2026 | T6398 | District 6 | 24 | $8,648.75 | $8,005.39 | 4 | OHLA USA INC | FDOT |
| 20 MAY 2026 | T7576 | District 7 | 4 | $5,877.11 | $8,424.00 | 3 | C.W. ROBERTS CONTRACTING, INC. | FDOT |
| 29 APR 2026 | T7562 | District 7 | 4 | $5,900.00 | $6,482.00 | 7 | WATSON CIVIL CONSTRUCTION, INC. | FDOT |
| 31 MAR 2026 | T3845 | District 3 | 32 | $16,563 | $16,282 | 4 | PHOENIX CONSTRUCTION SERVICES, INC. | FDOT |
| 27 AUG 2025 | T4688 | District 4 | 2 | $17,529 | $12,083 | 7 | CENTRAL CIVIL CONSTRUCTION CO. | FDOT |
| 11 JUN 2025 | T5851 | District 5 | 1 | $5,600.00 | $10,000 | 5 | JR. DAVIS CONSTRUCTION CO., INC. | FDOT |
| 28 MAY 2025 | T4575 | District 4 | 4 | $7,018.90 | $6,809.45 | 4 | ROADWAY CONSTRUCTION, LLC | FDOT |
| 26 MAR 2025 | T4699 | District 4 | 8 | $7,451.21 | $7,050.60 | 4 | TIMOTHY ROSE CONTRACTING, INC. | FDOT |
| 26 MAR 2025 | T7569 | District 7 | 20 | $9,455.33 | $7,927.66 | 4 | AJAX PAVING INDUSTRIES OF FLORIDA LLC | FDOT |
| 12 JUN 2024 | T1875 | District 1 | 14 | $5,278.74 | $5,800.00 | 3 | HUBBARD CONSTRUCTION COMPANY | FDOT |
| 24 APR 2024 | T7520 | District 7 | 3 | $9,100.00 | $9,550.00 | 4 | WATSON CIVIL CONSTRUCTION, INC. | FDOT |
| 15 NOV 2023 | T5798 | District 5 | 4 | $5,200.00 | $6,695.29 | 4 | WATSON CIVIL CONSTRUCTION, INC. | FDOT |
| 27 SEP 2023 | T4570 | District 4 | 7 | $8,800.00 | $9,600.00 | 5 | HALLEY ENGINEERING CONTRACTORS, INC. | FDOT |
| 24 MAY 2023 | T5784 | District 5 | 4 | $5,600.00 | $8,523.22 | 3 | COMMERCIAL INDUSTRIAL CORP. | FDOT |
Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.
How these prices were read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
- Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.