Utility fixture, valve assembly, furnish and install, 12" unit price, Florida

Low bidders on FDOT contracts carried a median of $7,235.06 per EACH for item 1080-24112, utility fixture, valve assembly, furnish and install, 12", over the 24 months to 28 OCT 2026, across 10 low bids. Half of all 47 bids fell between $6,359.96 and $11,035.

Owner
Florida DOT
Item
1080-24112
Unit
EACH
Latest letting
28 OCT 2026
$7,235.06Low bidder's median, per EACH
$7,800.00Median of all bids, per EACH
10Contracts in the window

By year of letting

Utility fixture, valve assembly, furnish and install, 12", FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20181010$2,850.0057$3,051.79
201966$3,431.6234$3,494.05
202033$4,500.0019$4,057.47
202155$3,800.0028$4,377.50
202244$5,241.6611$5,800.00
202355$6,435.0022$6,720.86
202422$7,189.377$7,500.00
202555$7,451.2124$7,550.00
202655$5,900.0023$8,000.00
Utility fixture, valve assembly, furnish and install, 12", FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Utility fixture, valve assembly, furnish and install, 12", FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 74$5,888.5619$6,482.00
District 43$7,451.2115$7,451.21
Utility fixture, valve assembly, furnish and install, 12", FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

Latest contracts with this item

Latest FDOT contracts carrying Utility fixture, valve assembly, furnish and install, 12"
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 OCT 2026T7591District 71$5,828.93$6,247.275PREFERRED MATERIALS INC.FDOT
30 SEP 2026T6398District 624$8,648.75$8,005.394OHLA USA INCFDOT
20 MAY 2026T7576District 74$5,877.11$8,424.003C.W. ROBERTS CONTRACTING, INC.FDOT
29 APR 2026T7562District 74$5,900.00$6,482.007WATSON CIVIL CONSTRUCTION, INC.FDOT
31 MAR 2026T3845District 332$16,563$16,2824PHOENIX CONSTRUCTION SERVICES, INC.FDOT
27 AUG 2025T4688District 42$17,529$12,0837CENTRAL CIVIL CONSTRUCTION CO.FDOT
11 JUN 2025T5851District 51$5,600.00$10,0005JR. DAVIS CONSTRUCTION CO., INC.FDOT
28 MAY 2025T4575District 44$7,018.90$6,809.454ROADWAY CONSTRUCTION, LLCFDOT
26 MAR 2025T4699District 48$7,451.21$7,050.604TIMOTHY ROSE CONTRACTING, INC.FDOT
26 MAR 2025T7569District 720$9,455.33$7,927.664AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
12 JUN 2024T1875District 114$5,278.74$5,800.003HUBBARD CONSTRUCTION COMPANYFDOT
24 APR 2024T7520District 73$9,100.00$9,550.004WATSON CIVIL CONSTRUCTION, INC.FDOT
15 NOV 2023T5798District 54$5,200.00$6,695.294WATSON CIVIL CONSTRUCTION, INC.FDOT
27 SEP 2023T4570District 47$8,800.00$9,600.005HALLEY ENGINEERING CONTRACTORS, INC.FDOT
24 MAY 2023T5784District 54$5,600.00$8,523.223COMMERCIAL INDUSTRIAL CORP.FDOT
Latest FDOT contracts carrying Utility fixture, valve assembly, furnish and install, 12"

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy