IDOT contract 62J29 bid tabulation
Section 2019-052-I. Let by Illinois DOT on September 19, 2025, Lake, District 01. 1 bid received; low bid $586,632 by Clean Cut Tree Service, Inc..
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 25
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Clean Cut Tree Service, Inc. | $586,632 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Clean Cut Tree Service, Inc. |
|---|---|---|---|---|
| 1 | Weed CTRL NTV LSCP EN (X0327120) | ACRE | 16.65 | $1,200.00 |
| 2 | Tree remov 6-15 exp (X2010110) | UNIT | 1,293 | $28.00 |
| 3 | Tree remov over 15 exp (X2010210) | UNIT | 788 | $39.58 |
| 4 | Tree remov SPL (X2010310) | UNIT | 118 | $20.00 |
| 5 | Tree remov acres SPL (X2010350) | ACRE | 3.55 | $10,000 |
| 6 | Tree remov acres SPL exp (X2010351) | ACRE | 16.65 | $11,500 |
| 7 | Tree trimming (X2010410) | EACH | 40 | $125.00 |
| 8 | Selective clearing (X2010516) | UNIT | 3 | $750.00 |
| 9 | Temporary fence SPL (X2011000) | LF | 18,264 | $3.20 |
| 10 | Temp ditch checks SPL (X2800302) | LF | 380 | $15.00 |
| 11 | Fence removal special (X6640106) | LF | 719 | $5.00 |
| 12 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $600.00 |
| 13 | Temp info signing (X7200061) | SF | 83.40 | $15.00 |
| 14 | Stab constr entrance (Z0013797) | SY | 221 | $30.00 |
| 15 | Construction layout (Z0013798) | LS | 1 | $18,200 |
| 16 | Temp eros contr seed (28000250) | LB | 1,700 | $9.00 |
| 17 | Perimeter eros bar (28000400) | LF | 10,749 | $3.50 |
| 18 | Inlet & pipe protect (28000500) | EACH | 24 | $140.00 |
| 19 | Inlet filters (28000510) | EACH | 3 | $290.00 |
| 20 | Mobilization (67100100) | LS | 1 | $65,000 |
| 21 | Traf cont-prot 701201 (70100450) | LS | 1 | $22,500 |
| 22 | Traf cont-prot 701336 (70100600) | LS | 1 | $1.00 |
| 23 | TR cont & prot 701501 (70102620) | LS | 1 | $8,500.00 |
| 24 | TR cont & prot 701502 (70102622) | LS | 1 | $1.00 |
| 25 | TR cont & prot 701701 (70102635) | LS | 1 | $8,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.