IDOT contract 64U84 bid tabulation
Section (I-3)RS. Let by Illinois DOT on January 16, 2026, Boone, District 02. 1 bid received; low bid $233,841 by Rock Road Companies, Inc..
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 21
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rock Road Companies, Inc. | $233,841 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rock Road Companies, Inc. |
|---|---|---|---|---|
| 1 | P bit matls tack CT (40600295) | LB | 1,823 | $2.34 |
| 2 | Long joint sealant (40600370) | LF | 1,885 | $6.99 |
| 3 | HMA BC HM N50 (40600900) | TON | 50 | $190.00 |
| 4 | Temporary ramp (40600990) | SY | 35 | $67.83 |
| 5 | HMA SC IL-9.5FG C N50 (40604000) | TON | 511 | $170.00 |
| 6 | HMA surf rem 2 1/4 (44000158) | SY | 4,052 | $9.31 |
| 7 | Agg wedge SHLD type B (48102100) | TON | 10 | $412.52 |
| 8 | Man adjust (60255500) | EACH | 2 | $2,910.66 |
| 9 | Mobilization (67100100) | LS | 1 | $34,602 |
| 10 | Traf cont-prot 701306 (70100460) | LS | 1 | $5,375.60 |
| 11 | TR cont & prot 701701 (70102635) | LS | 1 | $202.85 |
| 12 | Short term pavt mking (70300100) | LF | 706 | $2.43 |
| 13 | SHRT TRM pavt MK rem (70300150) | SF | 235 | $19.51 |
| 14 | Mod ureth PM LTR-sym (78009000) | SF | 141 | $12.68 |
| 15 | Mod ureth PM line 4 (78009004) | LF | 2,427 | $1.32 |
| 16 | Mod ureth PM line 8 (78009008) | LF | 682 | $4.21 |
| 17 | Mod ureth PM line 12 (78009012) | LF | 242 | $6.34 |
| 18 | Mod ureth PM line 24 (78009024) | LF | 48 | $12.68 |
| 19 | Raised refl pavt MKR (78100100) | EACH | 64 | $73.03 |
| 20 | Raised ref PVT MK rem (78300200) | EACH | 60 | $46.49 |
| 21 | Det loop T1 (88600100) | LF | 170 | $35.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.