IDOT contract 66P82 bid tabulation
Section (125BR-3)BP,(124A-BR)BP. Let by Illinois DOT on January 17, 2025, Dekalb, District 03. 5 bids received; low bid $167,056 by ERA-Valdivia Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 19
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | ERA-Valdivia Contractors, Inc. | $167,056 | Low |
| 2 | Venus Painting Co. | $209,084 | +25% |
| 3 | Three Star Painting, Inc. | $266,083 | +59% |
| 4 | Civil Coatings and Construction Inc. | $298,750 | +79% |
| 5 | Capital Industrial Services, LLC | $313,663 | +88% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. ERA-Valdivia Contractors, Inc. | 2. Venus Painting Co. | 3. Three Star Painting, Inc. | 4. Civil Coatings and Construction Inc. | 5. Capital Industrial Services, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | C&D N-lead PT C RS N1 (X5060601) | LS | 1 | $12,610 | $2,250.00 | $2,500.00 | $100.00 | $12,062 |
| 2 | C&D N-lead PT C RS N2 (X5060602) | LS | 1 | $28,336 | $2,250.00 | $2,500.00 | $100.00 | $28,145 |
| 3 | BR CLN & PT war #1 (X5067501) | LS | 1 | $1,000.00 | $600.00 | $1,000.00 | $100.00 | $3,300.00 |
| 4 | BR CLN & PT war #2 (X5067502) | LS | 1 | $1,000.00 | $600.00 | $1,000.00 | $100.00 | $3,300.00 |
| 5 | Traf cont-prot 701201 SPL (X7010101) | EACH | 2 | $10.00 | $500.00 | $100.00 | $1.00 | $150.00 |
| 6 | Temp rumble strips SP (X7010118) | EACH | 12 | $10.00 | $250.00 | $1,000.00 | $1,100.00 | $700.00 |
| 7 | TC-prot 701321 SPL (X7010202) | EACH | 2 | $10.00 | $1,000.00 | $3,700.00 | $12,000 | $14,350 |
| 8 | Temp info signing (X7200061) | SF | 84 | $10.00 | $25.00 | $10.00 | $35.00 | $15.00 |
| 9 | Clean & PT STL BR N1 (Z0010501) | LS | 1 | $50,440 | $45,000 | $95,600 | $80,000 | $48,248 |
| 10 | Clean & PT STL BR N2 (Z0010502) | LS | 1 | $61,985 | $104,544 | $92,200 | $93,600 | $112,580 |
| 11 | Mobilization (67100100) | LS | 1 | $10,000 | $20,000 | $15,000 | $14,000 | $15,000 |
| 12 | Temp BR traf signals (70106500) | EACH | 2 | $10.00 | $5,000.00 | $4,500.00 | $18,000 | $5,500.00 |
| 13 | Short term pavt mking (70300100) | LF | 124 | $0.10 | $9.00 | $10.00 | $2.00 | $2.50 |
| 14 | SHRT TRM pavt MK rem (70300150) | SF | 40 | $0.10 | $25.00 | $10.00 | $6.00 | $6.00 |
| 15 | Temp conc barrier (70400100) | LF | 525 | $1.00 | $16.00 | $20.00 | $40.00 | $46.00 |
| 16 | Imp attn temp NRN TL3 (70600251) | EACH | 2 | $0.50 | $2,000.00 | $500.00 | $2,500.00 | $3,500.00 |
| 17 | Mod ureth PM line 4 (78009004) | LF | 560 | $0.10 | $1.00 | $9.87 | $4.50 | $4.50 |
| 18 | Mod ureth PM line 6 (78009006) | LF | 320 | $0.10 | $1.00 | $14.80 | $6.75 | $6.75 |
| 19 | PVT MKG rem WTR blast (78300202) | SF | 344 | $0.10 | $1.00 | $10.00 | $10.00 | $14.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.