IDOT contract 68J37 bid tabulation
Section D4. Let by Illinois DOT on January 17, 2025, Various, District 04. 1 bid received; low bid $748,731 by Northern Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 52
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Northern Contracting, Inc. | $748,731 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Northern Contracting, Inc. |
|---|---|---|---|---|
| 1 | Repr/upgr EX vat-cat (X0301372) | EACH | 5 | $380.00 |
| 2 | Guardrail blocks (X6300210) | EACH | 50 | $34.85 |
| 3 | Rail element plates (X6300215) | EACH | 80 | $391.00 |
| 4 | Steel posts (X6300230) | EACH | 135 | $154.00 |
| 5 | Steel posts 9' (X6300239) | EACH | 30 | $182.00 |
| 6 | Repair TRBT T1 SP tan (X6310302) | EACH | 14 | $2,617.00 |
| 7 | Repair TRBT T1 SP FLR (X6310304) | EACH | 5 | $1,740.00 |
| 8 | Repair TR bar term T2 (X6310316) | EACH | 6 | $578.00 |
| 9 | Repair TR bar term T3 (X6310318) | EACH | 4 | $180.00 |
| 10 | Repair TR bar term T4 (X6310324) | EACH | 4 | $220.00 |
| 11 | Repair TR bar term T5 (X6310326) | EACH | 4 | $348.00 |
| 12 | Repair TR bar term T6 (X6310330) | EACH | 4 | $1,886.00 |
| 13 | Repair TR bar term T8 (X6310336) | EACH | 4 | $26.00 |
| 14 | Repair TR bar term T9 (X6310338) | EACH | 4 | $26.00 |
| 15 | Vert adj of guardrail (X6330900) | LF | 320 | $6.20 |
| 16 | Tubular thrie beam (X6331101) | LF | 200 | $8.00 |
| 17 | Rep cable RD guard 3S (X6360123) | LF | 45 | $48.20 |
| 18 | Repr imp attn FRW TL3 (X6432213) | EACH | 1 | $13,186 |
| 19 | RP imp att FRN TL3 (X6432223) | EACH | 3 | $4,738.00 |
| 20 | Repr imp attn sun TL3 (X6432233) | EACH | 1 | $3,500.00 |
| 21 | Rep HTC (gibraltar) (X6440130) | LF | 500 | $3.10 |
| 22 | R HT term (gibraltar) (X6440131) | EACH | 10 | $695.00 |
| 23 | R&R posts (gibraltar) (X6440134) | EACH | 36 | $195.21 |
| 24 | Rep LK PL (gibraltar) (X6440135) | EACH | 90 | $33.00 |
| 25 | Rep hairp (gibraltar) (X6440136) | EACH | 45 | $59.11 |
| 26 | Chain link fence post (X6640502) | EACH | 9 | $187.00 |
| 27 | Traf cont & prot SPL (X7010216) | LS | 1 | $77,780 |
| 28 | Emer work call out (Z0008760) | EACH | 14 | $235.00 |
| 29 | Pull post arrangement (Z0020210) | EACH | 6 | $360.00 |
| 30 | Rem & reset posts (Z0051400) | EACH | 93 | $62.00 |
| 31 | SPBGR TY A 6FT posts (63000001) | LF | 1,750 | $53.45 |
| 32 | SPBGR TY A 9FT posts (63000003) | LF | 475 | $62.11 |
| 33 | Traf bar term T2 (63100045) | EACH | 26 | $912.00 |
| 34 | Traf bar term T5 (63100070) | EACH | 5 | $237.00 |
| 35 | Traf bar term T6 (63100085) | EACH | 3 | $2,786.00 |
| 36 | Traf bar term T9 (63100101) | EACH | 5 | $26.00 |
| 37 | Traf bar term T10 (63100105) | EACH | 5 | $26.00 |
| 38 | Traf bar term T12 (63100115) | EACH | 5 | $26.00 |
| 39 | TR bar TRM T1 SPL tan (63100167) | EACH | 30 | $4,617.00 |
| 40 | TR bar TRM T1 SPL FLR (63100169) | EACH | 13 | $3,081.00 |
| 41 | Guardrail remov (63200310) | LF | 3,500 | $4.80 |
| 42 | Guard posts (63400105) | EACH | 50 | $17.00 |
| 43 | Imp atten FRD nar TL3 (64300260) | EACH | 2 | $14,620 |
| 44 | Imp atten FRD res TL3 (64300320) | EACH | 2 | $16,920 |
| 45 | Imp atten FRD wid TL3 (64300370) | EACH | 1 | $21,240 |
| 46 | Imp atten NRD TL3 (64300450) | EACH | 4 | $870.00 |
| 47 | Imp atten SU nar TL3 (64300770) | EACH | 1 | $16,400 |
| 48 | CH LK fence 4 (66400105) | LF | 120 | $15.35 |
| 49 | CH LK fence 6 (66400305) | LF | 500 | $16.90 |
| 50 | Wov W fence 4 (66500105) | LF | 500 | $20.90 |
| 51 | Terminal marker - DA (72501000) | EACH | 37 | $35.00 |
| 52 | Grdrail ref type A (78200005) | EACH | 32 | $12.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.