IDOT contract 68J38 bid tabulation
Section 72(8,9,9-1)LS-16. Let by Illinois DOT on January 17, 2025, Peoria, District 04. 2 bids received; low bid $307,381 by JIMAX Landscape LLC.
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 19
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | JIMAX Landscape LLC | $307,381 | Low |
| 2 | Central Landscaping, LP | $327,930 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. JIMAX Landscape LLC | 2. Central Landscaping, LP |
|---|---|---|---|---|---|
| 1 | T-amel X GF CS SF 5' (B2000864) | EACH | 1 | $900.00 | $900.00 |
| 2 | T-malus PF CL 6' (B2004166) | EACH | 1 | $900.00 | $900.00 |
| 3 | E-pinus mugo SLWMND 6'B&B (D2002605) | EACH | 11 | $800.00 | $450.00 |
| 4 | P PL ornament T 4" P (K0012975) | UNIT | 1.70 | $2,000.00 | $2,000.00 |
| 5 | P PL ornament T gal P (K0012990) | UNIT | 2.87 | $3,000.00 | $3,300.00 |
| 6 | Tree care (K0026701) | LS | 1 | $4,750.00 | $4,200.00 |
| 7 | Shrub care (K0026811) | LS | 1 | $22,815 | $35,000 |
| 8 | Perennial plant care (K0026851) | LS | 1 | $78,900 | $90,000 |
| 9 | Weed cont broadlf TRF (K0029618) | GAL | 0.10 | $5,000.00 | $5,000.00 |
| 10 | Weed contr pre-EM GRN (K0029634) | LB | 900 | $9.24 | $10.00 |
| 11 | Mulch (K1003680) | SY | 19,077 | $4.48 | $3.50 |
| 12 | Plant watering (K1004539) | UNIT | 6 | $1,250.00 | $1,000.00 |
| 13 | Weed barrier fabric (X0321501) | SY | 422 | $13.60 | $2.00 |
| 14 | Decorative stone (X1800024) | SF | 3,797 | $2.18 | $1.35 |
| 15 | Selective clearing (X2010514) | ACRE | 0.16 | $22,000 | $7,000.00 |
| 16 | Mowing SPL (X2503110) | ACRE | 63 | $418.73 | $450.00 |
| 17 | Stone boulders SPL (X2600040) | EACH | 42 | $634.00 | $950.00 |
| 18 | Traf cont & prot SPL (X7010216) | LS | 1 | $3,780.00 | $5,000.00 |
| 19 | Mobilization (67100100) | LS | 1 | $2,200.00 | $16,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.