IDOT contract 68J63 bid tabulation
Section [(35NRM)RS-2;35RS-10]SW. Let by Illinois DOT on June 13, 2025, Tazewell, District 04. 1 bid received; low bid $2,166,199 by R. A. Cullinan and Son, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 59
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R. A. Cullinan and Son, a div of UCM, Inc. | $2,166,199 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R. A. Cullinan and Son, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | Constr sta layout (XZ013798) | LS | 1 | $6,652.00 |
| 2 | Park benches (X0321158) | EACH | 3 | $1,480.00 |
| 3 | Trash receptacle rel (X0323706) | EACH | 1 | $1,235.00 |
| 4 | Rem ST RE snplassy SP (X2600022) | EACH | 2 | $192.50 |
| 5 | Man adj F&G SPL (X6025602) | EACH | 4 | $7,185.82 |
| 6 | Construction layout (Z0013798) | LS | 1 | $41,024 |
| 7 | Tree trunk protection (20101100) | EACH | 1 | $726.70 |
| 8 | Tree root pruning (20101200) | EACH | 1 | $440.00 |
| 9 | Topsoil F & P 4 (21101615) | SY | 505 | $13.15 |
| 10 | Nitrogen fert nutr (25000400) | LB | 8 | $7.15 |
| 11 | Phosphorus fert nutr (25000500) | LB | 8 | $7.15 |
| 12 | Potassium fert nutr (25000600) | LB | 8 | $7.15 |
| 13 | Sodding salt tolerant (25200110) | SY | 505 | $25.85 |
| 14 | Supple watering (25200200) | UNIT | 2.90 | $165.00 |
| 15 | Inlet filters (28000510) | EACH | 20 | $645.93 |
| 16 | Sub gran mat B 4 (31101200) | SY | 924 | $91.50 |
| 17 | P bit matls tack CT (40600295) | LB | 5,314 | $5.06 |
| 18 | Matl transfer device (40600405) | TON | 2,305 | $11.20 |
| 19 | HMA surf rem butt JT (40600982) | SY | 724 | $35.49 |
| 20 | Temporary ramp (40600990) | SY | 407 | $37.11 |
| 21 | P HMA SC "D" N50 (40603535) | TON | 2,305 | $235.96 |
| 22 | PC conc sidewalk 5 (42400200) | SF | 8,196 | $32.29 |
| 23 | Detectable warnings (42400800) | SF | 447 | $49.47 |
| 24 | HMA surf rem 1 (44000153) | SY | 378 | $17.00 |
| 25 | HMA surf rem 1 3/4 (44000156) | SY | 23,187 | $7.95 |
| 26 | Curb rem (44000300) | LF | 90 | $101.88 |
| 27 | Comb curb gutter rem (44000500) | LF | 694 | $77.58 |
| 28 | Sidewalk rem (44000600) | SF | 7,178 | $10.45 |
| 29 | Pavt patch T2 6 (44200065) | SY | 5 | $924.08 |
| 30 | Pavt patch T1 12 (44200140) | SY | 36 | $1,070.06 |
| 31 | Pavt patch T2 12 (44200144) | SY | 226 | $668.94 |
| 32 | Water valves adjust (56109210) | EACH | 2 | $4,101.37 |
| 33 | Man adjust (60255500) | EACH | 2 | $4,478.01 |
| 34 | Inlets adjust (60260100) | EACH | 1 | $2,057.99 |
| 35 | FR & grates adjust (60300105) | EACH | 2 | $2,970.66 |
| 36 | FR & lids adjust (60300305) | EACH | 2 | $2,970.66 |
| 37 | Comb CC&G TB6.12 (60603800) | LF | 646 | $137.45 |
| 38 | Comb CC&G TB6.18 (60604400) | LF | 48 | $304.53 |
| 39 | Comb CC&G TY B-6.24 (60605000) | LF | 95 | $304.16 |
| 40 | Engr field office A (67000400) | CAL MO | 6 | $4,456.23 |
| 41 | Mobilization (67100100) | LS | 1 | $123,103 |
| 42 | TR cont & prot 701502 (70102622) | LS | 1 | $91,380 |
| 43 | TR cont & prot 701701 (70102635) | LS | 1 | $0.01 |
| 44 | TR cont & prot 701801 (70102640) | LS | 1 | $1,045.00 |
| 45 | TR cont surveillance (70103815) | CAL DAY | 76 | $432.90 |
| 46 | Changeable message SN (70107025) | CAL DAY | 28 | $137.50 |
| 47 | Short term pavt mking (70300100) | LF | 4,130 | $2.35 |
| 48 | SHRT TRM pavt MK rem (70300150) | SF | 1,394 | $5.29 |
| 49 | Sign panel T1 (72000100) | SF | 58 | $62.15 |
| 50 | Teles STL sin support (72800100) | LF | 74 | $42.90 |
| 51 | Base tel STL sin supp (73100100) | EACH | 8 | $715.00 |
| 52 | Mod ureth PM LTR-sym (78009000) | SF | 1,120 | $4.40 |
| 53 | Mod ureth PM line 4 (78009004) | LF | 11,343 | $1.21 |
| 54 | Mod ureth PM line 6 (78009006) | LF | 1,329 | $1.82 |
| 55 | Mod ureth PM line 8 (78009008) | LF | 719 | $2.42 |
| 56 | Mod ureth PM line 12 (78009012) | LF | 135 | $3.69 |
| 57 | Mod ureth PM line 24 (78009024) | LF | 523 | $7.32 |
| 58 | Raised refl pavt MKR (78100100) | EACH | 235 | $40.10 |
| 59 | Raised ref PVT MK rem (78300200) | EACH | 207 | $43.11 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.