Section 4RS-6,(4BR-2)BDR. Let by Illinois DOT on January 16, 2026, Christian, District 06. 3 bids received; low bid $2,539,344 by Truman L. Flatt & Sons Co., Inc..
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 45
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Truman L. Flatt & Sons Co., Inc. | $2,539,344 | Low |
| 2 | Illinois Valley Paving, a div of UCM, Inc. | $2,594,593 | +2.0% |
| 3 | P. H. Broughton & Sons, Inc. | $2,644,075 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Truman L. Flatt & Sons Co., Inc. | 2. Illinois Valley Paving, a div of UCM, Inc. | 3. P. H. Broughton & Sons, Inc. |
|---|---|---|---|---|---|---|
| 1 | Exc & GR EX SHLD SPL (X2020060) | UNIT | 5 | $1,766.91 | $1,525.57 | $4,105.17 |
| 2 | PCC surf rem 1 1/2 (X4406812) | SY | 37 | $24.00 | $8.14 | $4.50 |
| 3 | Width restrict sign (X7200201) | LS | 1 | $5,211.48 | $1,398.76 | $5,483.98 |
| 4 | Appr slab repair (PD) (Z0001800) | SY | 65 | $1,190.01 | $226.37 | $1,252.24 |
| 5 | Conc curb repair (Z0012500) | LF | 15 | $198.21 | $115.43 | $208.57 |
| 6 | Polymer concrete (Z0041895) | CF | 5.50 | $1.02 | $1,837.75 | $1.07 |
| 7 | Prot reset survey MRK (Z0049799) | EACH | 22 | $760.59 | $372.42 | $1,073.34 |
| 8 | Trainees (Z0076600) | HR | 2,500 | $0.80 | $0.80 | $0.80 |
| 9 | Trainees TPG (Z0076604) | HR | 2,500 | $15.00 | $15.00 | $15.00 |
| 10 | Earth excavation (20200100) | CY | 137 | $68.17 | $158.77 | $21.65 |
| 11 | HMA BC wid 9 (35600712) | SY | 181 | $129.14 | $113.46 | $192.94 |
| 12 | Preparation of base (35800100) | SY | 634 | $14.10 | $5.81 | $4.50 |
| 13 | Agg surf course TY B (40200800) | TON | 37 | $97.68 | $55.31 | $85.55 |
| 14 | Bit matls tack CT (40600290) | LB | 56,011 | $0.68 | $0.98 | $0.61 |
| 15 | Long joint sealant (40600370) | LF | 33,872 | $2.59 | $2.54 | $2.72 |
| 16 | Matl transfer device (40600405) | TON | 6,971 | $3.20 | $3.11 | $3.63 |
| 17 | HMA surf rem butt JT (40600982) | SY | 3,465 | $10.35 | $8.14 | $15.75 |
| 18 | Temporary ramp (40600990) | SY | 835 | $14.71 | $8.94 | $13.73 |
| 19 | HMA BC IL-9.5FG N50 (40602965) | TON | 5,810 | $105.65 | $114.95 | $109.77 |
| 20 | HMA SC IL-9.5 C N50 (40604050) | TON | 6,971 | $102.81 | $109.70 | $107.49 |
| 21 | Bit matls tack CT (40800029) | LB | 1,582 | $0.68 | $0.87 | $0.61 |
| 22 | Incidental HMA surf (40800050) | TON | 573 | $262.50 | $231.02 | $227.71 |
| 23 | HMA surf rem 1 1/2 (44000155) | SY | 82,148 | $1.98 | $1.98 | $1.50 |
| 24 | HMA surf rem 2 3/4 (44000160) | SY | 832 | $10.52 | $1.98 | $1.50 |
| 25 | Agg wedge SHLD type B (48102100) | TON | 1,249 | $46.68 | $35.56 | $57.87 |
| 26 | HMA shoulders (48203100) | TON | 16 | $164.48 | $194.04 | $126.55 |
| 27 | BR deck grooving (50300260) | SY | 323 | $16.66 | $19.92 | $17.53 |
| 28 | Protective coat (50300300) | SY | 340 | $4.41 | $7.16 | $4.64 |
| 29 | BR deck scar 3/4 (53101002) | SY | 338 | $247.48 | $206.30 | $260.42 |
| 30 | BR DK mic C ovl 2 1/2 (53101609) | SY | 338 | $228.74 | $398.74 | $240.70 |
| 31 | STR rep con DP = < 5 (53212754) | SF | 75 | $354.74 | $495.57 | $373.28 |
| 32 | Engr field office A (67000400) | CAL MO | 12 | $2,471.26 | $3,223.07 | $4,071.67 |
| 33 | Mobilization (67100100) | LS | 1 | $54,199 | $44,135 | $59,896 |
| 34 | Traf cont-prot 701316 (70100100) | EACH | 1 | $30,896 | $13,779 | $32,511 |
| 35 | Traf cont-prot 701201 (70100450) | LS | 1 | $1,061.16 | $302.17 | $1,341.67 |
| 36 | Traf cont-prot 701306 (70100460) | LS | 1 | $13,487 | $20,926 | $10,089 |
| 37 | Traf cont-prot 701326 (70100500) | LS | 1 | $1,748.73 | $0.01 | $9,338.01 |
| 38 | Temp BR traf signals (70106500) | EACH | 1 | $8,670.00 | $11,297 | $9,123.35 |
| 39 | Temp rumble strips (70106700) | EACH | 6 | $1,909.31 | $971.03 | $2,009.14 |
| 40 | Changeable message SN (70107025) | CAL DAY | 30 | $100.00 | $120.39 | $80.50 |
| 41 | Short term pavt mking (70300100) | LF | 10,265 | $0.42 | $1.39 | $1.61 |
| 42 | SHRT TRM pavt MK rem (70300150) | SF | 1,142 | $2.83 | $4.78 | $2.70 |
| 43 | Mod ureth PM line 5 (78009005) | LF | 84,896 | $0.62 | $0.61 | $0.65 |
| 44 | Raised refl pavt MKR (78100100) | EACH | 428 | $38.88 | $48.47 | $49.11 |
| 45 | Raised ref PVT MK rem (78300200) | EACH | 428 | $15.25 | $12.21 | $12.52 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.