IDOT contract 72D00 bid tabulation
Section (59-1,2,68-1)RS-4. Let by Illinois DOT on January 17, 2025, Montgomery, District 06. 1 bid received; low bid $15,476,927 by Illinois Valley Paving, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 51
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Illinois Valley Paving, a div of UCM, Inc. | $15,476,927 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Illinois Valley Paving, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | Maintenance mowing (X2503000) | ACRE | 121 | $148.50 |
| 2 | Bit matls FS (X4060107) | LB | 203,726 | $2.60 |
| 3 | Clean underdr outlet (X6010100) | EACH | 826 | $175.07 |
| 4 | Outlet marker (X6670201) | EACH | 826 | $22.00 |
| 5 | Temp raised pavt MKR (X7810400) | EACH | 4,414 | $30.24 |
| 6 | Construction layout (Z0013798) | LS | 1 | $49,748 |
| 7 | RR prot liability ins (Z0048665) | LS | 1 | $6,579.35 |
| 8 | Trainees (Z0076600) | HR | 5,000 | $0.80 |
| 9 | Trainees TPG (Z0076604) | HR | 5,000 | $15.00 |
| 10 | Bit matls tack CT (40600290) | LB | 222,952 | $0.99 |
| 11 | LNG JNT SLNT half WD (40600372) | LF | 322,385 | $2.09 |
| 12 | Matl transfer device (40600405) | TON | 41,662 | $5.86 |
| 13 | P HMA SC IL-9.5 E N90 (40604174) | TON | 41,681 | $183.80 |
| 14 | HMA surf rem 1 1/2 (44000155) | SY | 495,450 | $5.48 |
| 15 | Welded wire reinf (44200050) | SY | 230 | $24.20 |
| 16 | CL A patch T2 13 (44200610) | SY | 80 | $522.50 |
| 17 | CL A patch T3 13 (44200612) | SY | 80 | $520.30 |
| 18 | CL A patch T4 13 (44200614) | SY | 96 | $518.10 |
| 19 | CL B patch T2 12 (44200994) | SY | 84 | $412.50 |
| 20 | CL B patch T2 14 (44201019) | SY | 43 | $423.50 |
| 21 | CL B patch T4 14 (44201025) | SY | 230 | $412.50 |
| 22 | CL B patch expan JT (44201294) | LF | 608 | $60.50 |
| 23 | Dowel bars 1 1/2 (44201299) | EACH | 285 | $38.50 |
| 24 | Patch reinforcement (44213000) | SY | 256 | $82.50 |
| 25 | Saw cuts (44213200) | LF | 1,648 | $13.20 |
| 26 | Tie bars 3/4 (44213204) | EACH | 285 | $24.20 |
| 27 | Engr field office A (67000400) | CAL MO | 12 | $4,079.20 |
| 28 | Mobilization (67100100) | LS | 1 | $920,816 |
| 29 | Traf cont-prot 701422 (70100320) | LS | 1 | $53,064 |
| 30 | Traf cont-prot 701411 (70100420) | EACH | 14 | $4,137.48 |
| 31 | Traf cont-prot 701201 (70100450) | LS | 1 | $29,535 |
| 32 | Traf cont-prot 701206 (70100455) | LS | 1 | $2,782.33 |
| 33 | Traf cont-prot 701401 (70100800) | LS | 1 | $428,905 |
| 34 | Traf cont-prot 701451 (70100820) | LS | 1 | $42,222 |
| 35 | Traf cont-prot 701456 (70100825) | LS | 1 | $13,036 |
| 36 | Changeable message SN (70107025) | CAL DAY | 84 | $91.85 |
| 37 | Night work zone light (70200100) | LS | 1 | $208,607 |
| 38 | Short term pavt mking (70300100) | LF | 15,034 | $1.58 |
| 39 | SHRT TRM pavt MK rem (70300150) | SF | 4,961 | $9.14 |
| 40 | Mod ureth PM LTR-sym (78009000) | SF | 493 | $16.50 |
| 41 | Mod ureth PM line 6 (78009006) | LF | 386,842 | $0.59 |
| 42 | Mod ureth PM line 8 (78009008) | LF | 11,859 | $0.83 |
| 43 | Mod ureth PM line 12 (78009012) | LF | 1,606 | $11.00 |
| 44 | Mod ureth PM line 24 (78009024) | LF | 214 | $19.80 |
| 45 | GRV RCSD PM LTR & sym (78011000) | SF | 493 | $4.95 |
| 46 | GRV RCSD PVT MRKG 7 (78011035) | LF | 386,842 | $0.44 |
| 47 | GRV RCSD PVT MRKG 9 (78011045) | LF | 11,859 | $0.50 |
| 48 | GRV RCSD PVT MRKG 13 (78011065) | LF | 1,606 | $4.95 |
| 49 | GRV RCSD PVT MRKG 25 (78011125) | LF | 214 | $6.60 |
| 50 | Raised refl pavt MKR (78100100) | EACH | 4,277 | $44.80 |
| 51 | Raised ref PVT MK rem (78300200) | EACH | 4,277 | $16.06 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.