IDOT contract 72D00 bid tabulation

Section (59-1,2,68-1)RS-4. Let by Illinois DOT on January 17, 2025, Montgomery, District 06. 1 bid received; low bid $15,476,927 by Illinois Valley Paving, a div of UCM, Inc..

Owner
Illinois DOT
Letting
17 JAN 2025
Pay items
51
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Illinois Valley Paving, a div of UCM, Inc.$15,476,927Low
IDOT contract 72D00: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Illinois Valley Paving, a div of UCM, Inc.
1Maintenance mowing (X2503000)ACRE121$148.50
2Bit matls FS (X4060107)LB203,726$2.60
3Clean underdr outlet (X6010100)EACH826$175.07
4Outlet marker (X6670201)EACH826$22.00
5Temp raised pavt MKR (X7810400)EACH4,414$30.24
6Construction layout (Z0013798)LS1$49,748
7RR prot liability ins (Z0048665)LS1$6,579.35
8Trainees (Z0076600)HR5,000$0.80
9Trainees TPG (Z0076604)HR5,000$15.00
10Bit matls tack CT (40600290)LB222,952$0.99
11LNG JNT SLNT half WD (40600372)LF322,385$2.09
12Matl transfer device (40600405)TON41,662$5.86
13P HMA SC IL-9.5 E N90 (40604174)TON41,681$183.80
14HMA surf rem 1 1/2 (44000155)SY495,450$5.48
15Welded wire reinf (44200050)SY230$24.20
16CL A patch T2 13 (44200610)SY80$522.50
17CL A patch T3 13 (44200612)SY80$520.30
18CL A patch T4 13 (44200614)SY96$518.10
19CL B patch T2 12 (44200994)SY84$412.50
20CL B patch T2 14 (44201019)SY43$423.50
21CL B patch T4 14 (44201025)SY230$412.50
22CL B patch expan JT (44201294)LF608$60.50
23Dowel bars 1 1/2 (44201299)EACH285$38.50
24Patch reinforcement (44213000)SY256$82.50
25Saw cuts (44213200)LF1,648$13.20
26Tie bars 3/4 (44213204)EACH285$24.20
27Engr field office A (67000400)CAL MO12$4,079.20
28Mobilization (67100100)LS1$920,816
29Traf cont-prot 701422 (70100320)LS1$53,064
30Traf cont-prot 701411 (70100420)EACH14$4,137.48
31Traf cont-prot 701201 (70100450)LS1$29,535
32Traf cont-prot 701206 (70100455)LS1$2,782.33
33Traf cont-prot 701401 (70100800)LS1$428,905
34Traf cont-prot 701451 (70100820)LS1$42,222
35Traf cont-prot 701456 (70100825)LS1$13,036
36Changeable message SN (70107025)CAL DAY84$91.85
37Night work zone light (70200100)LS1$208,607
38Short term pavt mking (70300100)LF15,034$1.58
39SHRT TRM pavt MK rem (70300150)SF4,961$9.14
40Mod ureth PM LTR-sym (78009000)SF493$16.50
41Mod ureth PM line 6 (78009006)LF386,842$0.59
42Mod ureth PM line 8 (78009008)LF11,859$0.83
43Mod ureth PM line 12 (78009012)LF1,606$11.00
44Mod ureth PM line 24 (78009024)LF214$19.80
45GRV RCSD PM LTR & sym (78011000)SF493$4.95
46GRV RCSD PVT MRKG 7 (78011035)LF386,842$0.44
47GRV RCSD PVT MRKG 9 (78011045)LF11,859$0.50
48GRV RCSD PVT MRKG 13 (78011065)LF1,606$4.95
49GRV RCSD PVT MRKG 25 (78011125)LF214$6.60
50Raised refl pavt MKR (78100100)EACH4,277$44.80
51Raised ref PVT MK rem (78300200)EACH4,277$16.06
IDOT contract 72D00: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy