IDOT contract 74E25 bid tabulation
Section D7. Let by Illinois DOT on April 24, 2026, Richland, District 07. 1 bid received; low bid $538,201 by Mt. Carmel Stabilization Group, Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 8
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mt. Carmel Stabilization Group, Inc. | $538,201 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mt. Carmel Stabilization Group, Inc. |
|---|---|---|---|---|
| 1 | Bit surf treatmnt A2 (X1500005) | SY | 66,214 | $6.25 |
| 2 | Bit matls FS (X4060107) | LB | 29,796 | $0.65 |
| 3 | HMA pothole patch(CM) (X4062948) | TON | 22 | $170.00 |
| 4 | Preparation of base (35800100) | SY | 37,504 | $1.50 |
| 5 | Agg base repair (35800200) | TON | 100 | $65.00 |
| 6 | Mobilization (67100100) | LS | 1 | $12,500 |
| 7 | Traf cont-prot 701201 (70100450) | LS | 1 | $5,000.00 |
| 8 | Traf cont-prot 701306 (70100460) | LS | 1 | $21,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.