Section (11,12,13)RS-4. Let by Illinois DOT on June 13, 2025, Jefferson, District 09. 1 bid received; low bid $2,283,905 by E. T. Simonds Construction Company.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 34
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E. T. Simonds Construction Company | $2,283,905 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E. T. Simonds Construction Company |
|---|---|---|---|---|
| 1 | RR prot liability ins (Z0048665) | LS | 1 | $6,158.90 |
| 2 | Bit matls tack CT (40600290) | LB | 66,441 | $0.01 |
| 3 | Long joint sealant (40600370) | LF | 47,291 | $2.69 |
| 4 | Matl transfer device (40600405) | TON | 9,902 | $3.59 |
| 5 | Temporary ramp (40600990) | SY | 304 | $31.12 |
| 6 | HMA SC IL-9.5 D N70 (40604062) | TON | 4,909 | $106.47 |
| 7 | HMA SC IL-9.5 D N90 (40604064) | TON | 5,025 | $109.19 |
| 8 | HMA surf rem 1 1/2 (44000155) | SY | 148,021 | $2.01 |
| 9 | CL C patch T2 16 (44201427) | SY | 139 | $466.81 |
| 10 | CL C patch T3 16 (44201431) | SY | 16 | $1,047.26 |
| 11 | CL C patch T4 16 (44201433) | SY | 27 | $526.34 |
| 12 | Agg wedge SHLD type B (48102100) | TON | 352 | $93.26 |
| 13 | HMA shoulders (48203100) | TON | 2,513 | $126.09 |
| 14 | Shoulder rum strip 8 (64200108) | LF | 22,164 | $0.24 |
| 15 | Engr field office A (67000400) | CAL MO | 3 | $2,200.00 |
| 16 | Mobilization (67100100) | LS | 1 | $138,402 |
| 17 | Traf cont-prot 701306 (70100460) | LS | 1 | $59,253 |
| 18 | Traf cont-prot 701336 (70100600) | LS | 1 | $2,271.50 |
| 19 | TR cont & prot 701701 (70102635) | LS | 1 | $0.01 |
| 20 | Changeable message SN (70107025) | CAL DAY | 28 | $41.25 |
| 21 | Short term pavt mking (70300100) | LF | 13,556 | $1.21 |
| 22 | SHRT TRM pavt MK rem (70300150) | SF | 4,532 | $0.01 |
| 23 | Temp PVT MK LTR & sym paint (70300211) | SF | 332 | $0.01 |
| 24 | Temp PVT MK line 4 - paint (70300221) | LF | 139,150 | $0.01 |
| 25 | Temp PVT MK line 12 - paint (70300261) | LF | 329 | $0.01 |
| 26 | Temp PVT MK line 24 - paint (70300281) | LF | 66 | $0.01 |
| 27 | THPL PVT MK LTR & sym (78000100) | SF | 332 | $5.50 |
| 28 | THPL PVT MK line 4 (78000200) | LF | 9,804 | $1.43 |
| 29 | THPL PVT MK line 12 (78000600) | LF | 329 | $4.28 |
| 30 | THPL PVT MK line 24 (78000650) | LF | 66 | $6.60 |
| 31 | Paint PVT MK line 4 (78001110) | LF | 129,346 | $0.13 |
| 32 | Raised refl pavt MKR (78100100) | EACH | 547 | $39.23 |
| 33 | Raised ref PVT MK rem (78300200) | EACH | 547 | $5.81 |
| 34 | PVT MKG rem grinding (78300201) | SF | 46,156 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.