IDOT contract 78C29 bid tabulation
Section (3-2,8X-1,4-2)RS-1;. Let by Illinois DOT on September 18, 2026, Saline, District 09. 1 bid received; low bid $2,354,550 by E. T. Simonds Construction Company.
- Owner
- Illinois DOT
- Letting
- 18 SEP 2026
- Pay items
- 55
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E. T. Simonds Construction Company | $2,354,550 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E. T. Simonds Construction Company |
|---|---|---|---|---|
| 1 | STR refl CR CTRL TRTMT (X4430200) | LF | 7,778 | $1.84 |
| 2 | Bit matls tack CT (40600290) | LB | 46,366 | $0.01 |
| 3 | Long joint sealant (40600370) | LF | 27,159 | $4.05 |
| 4 | Matl transfer device (40600405) | TON | 6,817 | $6.00 |
| 5 | HMA surf rem butt JT (40600982) | SY | 122 | $50.75 |
| 6 | Temporary ramp (40600990) | SY | 551 | $53.17 |
| 7 | HMA BC IL-9.5 N70 (40602985) | TON | 965 | $113.05 |
| 8 | HMA SC IL-9.5 D N70 (40604062) | TON | 5,853 | $124.12 |
| 9 | Incidental HMA surf (40800050) | TON | 2 | $575.00 |
| 10 | PC conc sidewalk 5 (42400200) | SF | 470 | $44.40 |
| 11 | Detectable warnings (42400800) | SF | 40 | $50.16 |
| 12 | HMA surf rem 1 1/2 (44000155) | SY | 79,809 | $2.44 |
| 13 | HMA surf rem 2 (44000157) | SY | 13,529 | $3.70 |
| 14 | HMA surf rem 3 (44000161) | SY | 3,862 | $6.59 |
| 15 | Comb curb gutter rem (44000500) | LF | 68 | $74.70 |
| 16 | Sidewalk rem (44000600) | SF | 699 | $17.54 |
| 17 | Welded wire reinf (44200050) | SY | 454 | $20.43 |
| 18 | CL B patch T2 9 1/2 (44200958) | SY | 27 | $322.00 |
| 19 | CL B patch T3 9 1/2 (44200963) | SY | 90 | $315.00 |
| 20 | CL B patch T4 9 1/2 (44200965) | SY | 34 | $304.00 |
| 21 | Dowel bars 1 1/4 (44201298) | EACH | 160 | $45.73 |
| 22 | CL C patch T1 12 (44201373) | SY | 4 | $238.00 |
| 23 | CL C patch T2 12 (44201377) | SY | 381 | $210.00 |
| 24 | CL C patch T3 12 (44201381) | SY | 256 | $223.00 |
| 25 | CL C patch T4 12 (44201383) | SY | 74 | $230.00 |
| 26 | Saw cuts (44213200) | LF | 594 | $19.97 |
| 27 | Tie bars 3/4 (44213204) | EACH | 74 | $27.04 |
| 28 | Agg wedge SHLD type B (48102100) | TON | 137 | $81.17 |
| 29 | HMA shoulders (48203100) | TON | 2,830 | $96.27 |
| 30 | Comb CC&G TY B-6.24 (60605000) | LF | 68 | $146.92 |
| 31 | Shoulder rum strip 8 (64200108) | LF | 28,732 | $0.65 |
| 32 | Sinusoidal rum STP 14 (64200214) | LF | 3,058 | $5.56 |
| 33 | Engr field office A (67000400) | CAL MO | 3 | $2,208.22 |
| 34 | Mobilization (67100100) | LS | 1 | $175,082 |
| 35 | Traf cont-prot 701421 (70100310) | LS | 1 | $97,947 |
| 36 | Traf cont-prot 701306 (70100460) | LS | 1 | $39,277 |
| 37 | Traf cont-prot 701336 (70100600) | LS | 1 | $15,136 |
| 38 | TR cont & prot 701701 (70102635) | LS | 1 | $7,896.94 |
| 39 | TR cont & prot 701801 (70102640) | LS | 1 | $4,342.81 |
| 40 | Changeable message SN (70107025) | CAL DAY | 112 | $41.40 |
| 41 | Short term pavt mking (70300100) | LF | 6,799 | $1.82 |
| 42 | SHRT TRM pavt MK rem (70300150) | SF | 2,183 | $0.01 |
| 43 | Temp PVT MK LTR & sym paint (70300211) | SF | 438 | $0.01 |
| 44 | Temp PVT MK line 4 - paint (70300221) | LF | 39,890 | $0.01 |
| 45 | Sign panel T1 (72000100) | SF | 14 | $87.10 |
| 46 | Wood sin support (73000100) | LF | 58 | $57.07 |
| 47 | THPL PVT MK LTR & sym (78000100) | SF | 401 | $4.97 |
| 48 | THPL PVT MK line 4 (78000200) | LF | 28,961 | $0.83 |
| 49 | PT PVT MK LTRS & symb (78001100) | SF | 37 | $5.52 |
| 50 | Paint PVT MK line 4 (78001110) | LF | 10,929 | $0.51 |
| 51 | GRV RCSD PM LTR & sym (78011000) | SF | 401 | $5.52 |
| 52 | GRV RCSD PVT MRKG 5 (78011025) | LF | 28,961 | $0.44 |
| 53 | Raised refl pavt MKR (78100100) | EACH | 310 | $73.74 |
| 54 | Raised ref PVT MK rem (78300200) | EACH | 310 | $19.62 |
| 55 | PVT MKG rem grinding (78300201) | SF | 10,056 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.