IDOT contract 89898 bid tabulation
Project Number:, section 25-00057-07-RS. Let by Illinois DOT on April 24, 2026, Tazewell, District 04. 1 bid received; low bid $2,149,810 by R. A. Cullinan and Son, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 18
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R. A. Cullinan and Son, a div of UCM, Inc. | $2,149,810 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R. A. Cullinan and Son, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | Aggregate SHLDS B SPL (X4811300) | TON | 852 | $60.93 |
| 2 | Traf cont & prot SPL (X7010216) | LS | 1 | $20,515 |
| 3 | Trainees (Z0076600) | HR | 1,000 | $0.80 |
| 4 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 |
| 5 | P bit matls tack CT (40600295) | LB | 86,098 | $1.77 |
| 6 | Matl transfer device (40600405) | TON | 5,363 | $4.29 |
| 7 | HMA surf rem butt JT (40600982) | SY | 1,350 | $24.59 |
| 8 | Temporary ramp (40600990) | SY | 64 | $80.29 |
| 9 | HMA BC IL-9.5FG N50 (40602965) | TON | 3,797 | $152.80 |
| 10 | P HMA SC IL-9.5 D N50 (40604160) | TON | 5,363 | $159.25 |
| 11 | Incidental HMA surf (40800050) | TON | 252 | $384.74 |
| 12 | HMA surf rem 1 1/2 (44000155) | SY | 63,990 | $3.05 |
| 13 | CL D patch T4 6 (44201723) | SY | 80 | $345.63 |
| 14 | Mobilization (67100100) | LS | 1 | $48,946 |
| 15 | Short term pavt mking (70300100) | LF | 11,296 | $1.39 |
| 16 | SHRT TRM pavt MK rem (70300150) | SF | 941 | $13.20 |
| 17 | Raised refl pavt MKR (78100100) | EACH | 204 | $44.00 |
| 18 | Raised ref PVT MK rem (78300200) | EACH | 204 | $38.18 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.