INDOT contract M-45472-A bid tabulation

GUARDRAIL, MAINTENANCE OR REPAIR. Let by Indiana DOT on July 9, 2025, Marion, Greenfield. 2 bids received; low bid $839,114 by James H Drew Corporation.

Owner
Indiana DOT
Letting
09 JUL 2025
Pay items
59
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1James H Drew Corporation$839,114Low
2C-Tech Corporation Inc$850,207+1.0%
INDOT contract M-45472-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. James H Drew Corporation2. C-Tech Corporation Inc
0001Liquidated damages (109-08359)DOL1$1.00$1.00
0002Contract liens (109-08360)DOL1$1.00$1.00
0003Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00
0004Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00
0005Mobilization and demobilization (110-01001)LS1$30,000$61,000
0006Guardrail transition, type TGB (601-01522)EACH1$3,400.00$2,450.00
0007Guardrail connector system, W-beam, curved, type 1 (601-01625)EACH1$1,500.00$1,865.00
0008Guardrail connector system, W-beam, curved, type 2 (601-01626)EACH1$1,500.00$1,855.00
0009Guardrail post, 8.5 LBS per LFT, 7 FT long, galvanized (601-02211)EACH180$120.00$100.00
0010Guardrail post, wood, type W5 (601-03456)EACH9$100.00$75.00
0011Guardrail, W thrie-beam, rail section, 12 FT 6 in. (601-03457)EACH8$325.00$250.00
0012Guardrail, steel curved terminal end section (601-03464)EACH5$100.00$67.00
0013Cat unit complete without foundation tubes or soil plates above ground components only , AB stage 1 (601-03471)EACH2$1,800.00$5,000.00
0014Cat unit complete without foundation tubes or soil plates above ground components only , AB stage 1 and 2 (601-03471)EACH2$3,850.00$7,300.00
0015Cat unit complete without foundation tubes or soil plates above ground components only , AB stage 1, 2 and 3 (601-03471)EACH2$7,250.00$7,700.00
0016Cat unit complete without foundation tubes or soil plates above ground components only , AB stage 1,2 and 3 MS (601-03471)EACH2$7,250.00$7,700.00
0017Cat unit complete without foundation tubes or soil plates above ground components only , AB stage 1,2 and 3 OS (601-03471)EACH2$7,250.00$7,700.00
0019Guardrail end treatment, type SKT-350 , ET, head only (601-06273)EACH30$1,300.00$1,800.00
0020Guardrail end treatment, type SKT-350 , ET, post only (601-06273)EACH28$275.00$295.00
0021Guardrail end treatment, type SKT-350 , reset head (601-06273)EACH6$500.00$875.00
0022Guardrail end treatment, type SKT-350 , slotted rail only (601-06273)EACH35$675.00$710.00
0023Timber block (601-06798)EACH2,000$18.00$11.00
0024Impact attenuator , quadguard, M10, complete (601-07607)EACH1$35,000$30,500
0025Impact attenuator , react 350 TL-2, furnish and install (601-07607)EACH1$26,500$22,000
0026Impact attenuator , react 350 TL-2, install (601-07607)EACH1$4,250.00$3,000.00
0027Impact attenuator , react II TL-3 install (601-07607)EACH1$4,250.00$3,000.00
0028Impact attenuator , react M TL-3, furnish and install (601-07607)EACH1$38,000$33,000
0029Impact attenuator , sci CR1 W1 TL-2, furnish and install (601-07607)EACH1$32,500$26,500
0030Impact attenuator , sci CR1 W1 TL-2, install (601-07607)EACH1$4,250.00$3,000.00
0031Impact attenuator , sci CR2 W1 TL-3, install (601-07607)EACH1$4,250.00$3,000.00
0032Impact attenuator , sci CR2 W1 TL-3, furnish and install (601-07607)EACH1$38,000$33,000
0037Guardrail, thrie-beam, blockout, steel (601-08132)EACH40$100.00$85.00
0038Hand dig guardrail post holes (601-09238)EACH30$75.00$100.00
0039Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT125$25.00$25.00
0040Guardrail, MGS W-beam, double faced, 6 FT 3 in. spacing (601-12284)LFT10$45.00$38.00
0041Guardrail, post , bracket, galvanized, 14 FT (601-52501)EACH125$30.00$91.00
0042Guardrail, post , hba bottom post (601-52501)EACH2$275.00$178.00
0043Guardrail, post , hba top post (601-52501)EACH30$125.00$9.00
0044Guardrail, post , steel 10 FT (601-52501)EACH1$150.00$151.00
0045Guardrail, post , wood, CRT (601-52501)EACH20$100.00$83.00
0046Guardrail post, 15.5 LBS per FT, galvanized, 6 FT 3 in. long (601-61340)EACH400$50.00$89.00
0047Guardrail, steel beam, galvanized (601-62070)LFT5,000$18.00$14.00
0048Guardrail, steel beam, curved section, galvanized (601-62080)LFT720$20.00$37.00
0049Guardrail post, 15.5 LBS per LFT, galvanized, 7 FT 0 in. long (601-62150)EACH60$50.00$104.00
0050Guardrail post, plumb (601-62540)EACH1,800$20.00$18.00
0051Guardrail post, 8.5 LBS per LFT, galvanized, 6 FT 0 in. long (601-91468)EACH300$125.00$89.00
0052Guardrail post, W4, 8 in. X 8 in. (601-91511)EACH1$100.00$88.00
0053Guardrail, blockout, 6 in. X 8 in., B1 (601-91542)EACH15$25.00$48.00
0054Guardrail, blockout, 6 in. X 8 in., B2 (601-91575)EACH1$25.00$52.00
0055Guardrail, blockout, 6 in. X 8 in., B3 (601-91576)EACH4$25.00$44.00
0056Guardrail, thrie-beam transition section, galvanized (601-91649)EACH6$475.00$172.00
0057Guardrail end treatment, type OS , softstop (601-94689)EACH3$4,000.00$4,050.00
0058Guardrail end treatment, type MS , fleat - MT (601-94690)EACH3$6,125.00$6,000.00
0059Guardrail, splice plate, C, galvanized (601-95342)EACH1$135.00$98.00
0060Construction sign, type A (801-06640)EACH14$150.00$250.00
0061Flashing arrow sign (801-06710)DAY30$200.00$75.00
0062Maintaining traffic (801-06775)LS1$60,000$47,000
0063Portable changeable message sign (801-11642)EACH2$1,500.00$5,500.00
0064Guardrail end treatment, type OS , MSKT (601-94689)EACH25$4,000.00$4,100.00
INDOT contract M-45472-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of July 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy