INDOT contract R-44969-A bid tabulation

PAVEMENT REHABILITATION, ROAD AND BRIDGE IMPROVEMENTS. Let by Indiana DOT on February 26, 2025, Wayne, Greenfield. 2 bids received; low bid $162,305,009 by Milestone Contractors LP/E & B.

Owner
Indiana DOT
Letting
26 FEB 2025
Pay items
31
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Milestone Contractors LP/E & B$162,305,009Low
2Walsh Construction II/Rieth Riley J/V$165,639,957+2.0%
INDOT contract R-44969-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Milestone Contractors LP/E & B2. Walsh Construction II/Rieth Riley J/V
0001Design build , des 2002424, 50 percent (104-05404)LS1$61,860,000$62,518,889
0002Design build , des 2002424, 50 percent (104-05404)LS1$61,860,000$62,518,889
0003Design build , des 2002426, bridge no. 04 (104-05404)LS1$2,165,000$2,498,880
0004Design build , des 2002427, bridge no. 06 (104-05404)LS1$1,015,000$1,107,025
0005Design build , des 2002428, bridge no. 07 (104-05404)LS1$865,000$981,272
0006Design build , des 2002429, bridge no. 08 (104-05404)LS1$865,000$981,197
0007Design build , des 2002430, bridge no. 09 (104-05404)LS1$1,310,000$2,054,877
0008Design build , des 2002431, bridge no. 10 (104-05404)LS1$1,310,000$2,017,297
0009Design build , des 2002432, bridge no. 11 (104-05404)LS1$1,760,000$2,038,420
0010Design build , des 2002433, bridge no. 12 (104-05404)LS1$1,760,000$2,029,819
0011Design build , des 2002434, bridge no. 03 (104-05404)LS1$2,165,000$2,514,286
0012Design build , des 2002567, bridge no. 05 (104-05404)LS1$1,015,000$1,034,402
0013Design build , des 2002575, bridge no. 13 (104-05404)LS1$1,935,000$3,417,631
0014Design build , des 2200762, bridge no. 01 (104-05404)LS1$2,390,000$2,852,465
0015Design build , des 2200763, bridge no. 02 (104-05404)LS1$2,390,000$2,839,798
0016Design build , design fee (104-05404)LS1$15,000,000$11,594,800
0017Liquidated damages (109-08359)DOL1$1.00$1.00
0018Contract liens (109-08360)DOL1$1.00$1.00
0019Quality adjustments, HMA (109-08440)DOL1$1.00$1.00
0020Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00
0021Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00
0022Project estimate adjustment (109-08463)DOL1$1.00$1.00
0023Quality adjustments, pavement traffic markings (109-09377)DOL1$1.00$1.00
0024Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00
0025Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00
0026Special maintenance , permanent patching (109-12573)DOL850,000$1.00$1.00
0027Special maintenance , property damage (109-12573)DOL250,000$1.00$1.00
0028Special maintenance , PTQ truck (109-12573)DOL500,000$1.00$1.00
0029Special maintenance , temporary patching (109-12573)DOL350,000$1.00$1.00
0030Law enforcement officer (801-12324)HRS10,000$60.00$60.00
0031Special maintenance , service point power drop connection (109-12573)DOL90,000$1.00$1.00
INDOT contract R-44969-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of February 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy