Iowa DOT contract 09-0036-073 bid tabulation

Bridge Deck Overlay - IOWA 3 Drainage Ditch 2.1 mi W of Co Rd V56. Let by Iowa DOT on October 20, 2026, Bremer. 7 bids received; low bid $590,176 by Wicks Construction, Inc..

Owner
Iowa DOT
Letting
20 OCT 2026
Pay items
31
Data through
20 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Wicks Construction, Inc.$590,176Low
2Hawkeye Paving Corp.$603,721+2.0%
3Boulder Contracting, LLC.$620,304+5.0%
4Jasper Construction Services, Inc.$671,680+14%
5Cramer and Assoc., Inc.$718,727+22%
6Ti-Zack Concrete, LLC$893,763+51%
7Pciroads, LLC$997,803+69%
Iowa DOT contract 09-0036-073: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Wicks Construction, Inc.2. Hawkeye Paving Corp.3. Boulder Contracting, LLC.4. Jasper Construction Services, Inc.5. Cramer and Assoc., Inc.6. Ti-Zack Concrete, LLC
0010Removals, as per plan (2401-6750001)LS1$10,750$16,000$12,500$16,000$15,000$55,213
0020Excavation, class 20 (2402-2720000)CY34.60$67.50$80.00$30.00$40.00$90.00$290.00
0030Structural concrete (miscellaneous) (2403-0100000)CY8$2,350.00$3,300.00$3,300.00$4,000.00$5,000.00$6,847.48
0040Reinforcing steel, epoxy coated (2404-7775005)LB1,352$2.50$3.00$3.00$4.00$5.00$3.25
0050Deck repair, class A (2413-0698074)SY30$370.00$500.00$360.00$300.00$525.00$248.50
0060Concrete repair (2426-6772016)SF36$160.00$280.00$320.00$250.00$400.00$277.77
0070Paving notch replacement (2499-0800000)LF66.80$353.00$400.00$255.00$350.00$350.00$227.27
0080Mobilization (2533-4980005)LS1$34,500$25,000$30,000$54,000$70,000$131,049
0090Deck overlay (class O PCC) (2413-0698066)SY216
0100Trial batch and test placement (fiber reinforced concrete) (2403-1000010)LS1$1,500.00$500.00$7,500.00$5,000.00$1,000.00$3,000.00
0110Deck overlay (class HPC-O PCC) (2413-0698067)SY216$351.00$205.00$354.00$425.00$405.00$581.65
0120Fiber reinforcement for concrete repair/overlay (2413-1000005)SY216$3.25$4.00$2.50$6.00$2.00$25.25
0130Special backfill (2102-0425070)TON374.07$31.80$50.00$42.00$50.00$38.50$38.50
0140Excavation, class 13, waste (2102-2713090)CY552.40$33.75$20.00$25.00$20.00$17.60$17.60
0150Modified subbase (2115-0100000)CY37.46$66.40$130.00$67.00$90.00$82.50$82.50
0160Paved shoulder, hot mix asphalt mixture, 9 in. (2122-5500090)SY217.70$90.75$82.00$83.50$90.00$82.00$82.00
0170Shoulder strengthening, optional hot mix asphalt mixture or portland cement concrete, 8 in. (2122-7450080)SY1,187.40$62.15$62.00$62.50$65.00$61.20$61.20
0180Shoulder construction, earth (2123-7450000)STA19.79$550.00$250.00$308.00$650.00$330.00$330.00
0190Bridge approach, BR-203 (2301-0690203)SY704.40$232.00$285.00$239.00$250.00$300.00$335.00
0200Longitudinal grooving in concrete, bridge deck and/or approaches (2412-0000100)SY869.10$10.80$11.00$12.75$15.00$10.80$8.25
0210Remove and reinstall formed steel beam guardrail (2505-6765006)LF414$25.00$10.00$49.00$25.00$47.73$47.73
0220Removal of pavement (2510-6745850)SY1,076.30$22.00$25.00$23.75$20.00$20.00$16.00
0230Construction survey, location survey (2526-8285040)LS1$2,500.00$500.00$10,250$1.00$1.00$10,000
0240Pavement markings removed (2527-9263181)STA18.21$110.00$110.00$112.00$120.00$110.00$40.00
0250Painted pavement markings, waterborne or solvent-based (2527-9263209)STA18.21$110.00$110.00$112.00$120.00$110.00$40.00
0260Removable tape markings, wet retroreflective (2527-9263231)STA72.34$180.00$180.00$185.00$200.00$180.00$190.00
0270Temporary barrier rail, concrete (2528-8400048)LF675$11.00$11.00$11.50$12.00$11.00$12.00
0280Temporary traffic signals (2528-8400256)EACH1$7,500.00$7,500.00$7,700.00$8,000.00$7,500.00$7,500.00
0290Traffic control (2528-8445110)LS1$6,400.00$10,000$6,600.00$7,500.00$6,400.00$9,175.00
0300Temp crash cushion (2551-0000110)EACH4$900.00$1,000.00$920.00$1,000.00$900.00$1,000.00
0310Flaggers (2528-8445113)EACH20$660.00$660.00$660.00$660.00$660.00$660.00
Iowa DOT contract 09-0036-073: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from Iowa DOT's tabulation for this contract. Iowa DOT bid tabulation PDFs: the letting of 19 January 2022 (read from the Internet Archive's copy of Iowa DOT's file) and lettings of August to October 2026. On A+B contracts the item total is kept and the time part dropped. Bids that did not match their published total are left out.

Every contract let that day: Iowa DOT letting of October 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy