Iowa DOT contract 73-0591-045 bid tabulation
Rcb Culvert - Repair - U.S. 59 3.7 mi N of NCL Shenandoah. Let by Iowa DOT on September 29, 2026, Page. 4 bids received; low bid $227,150 by Reilly Construction Co., Inc..
- Owner
- Iowa DOT
- Letting
- 29 SEP 2026
- Pay items
- 18
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Reilly Construction Co., Inc. | $227,150 | Low |
| 2 | Peterson Contractors Inc. | $286,601 | +26% |
| 3 | Minturn, Inc. | $331,450 | +46% |
| 4 | Gus Construction Co., Inc. | $349,340 | +54% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Reilly Construction Co., Inc. | 2. Peterson Contractors Inc. | 3. Minturn, Inc. | 4. Gus Construction Co., Inc. |
|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (2101-0850001) | ACRE | 0.10 | $50,000 | $27,500 | $28,500 | $85,000 |
| 0020 | Excavation, class 10, channel (2104-2710020) | CY | 80 | $20.00 | $82.00 | $300.00 | $110.00 |
| 0030 | Topsoil, strip, salvage and spread (2105-8425015) | CY | 100 | $20.00 | $12.50 | $30.00 | $100.00 |
| 0040 | Modified subbase (2115-0100000) | CY | 20 | $100.00 | $85.00 | $175.00 | $50.00 |
| 0050 | Macadam stone base (2210-0475290) | TON | 10 | $100.00 | $71.00 | $90.00 | $150.00 |
| 0060 | Culvert, corrugated metal roadway pipe, 120 in. dia. (2417-1060120) | LF | 86 | $800.00 | $574.00 | $925.00 | $1,250.00 |
| 0070 | Flowable mortar (2506-4984000) | CY | 200 | $250.00 | $543.00 | $400.00 | $565.00 |
| 0080 | Engineering fabric (2507-3250005) | SY | 160 | $5.00 | $3.50 | $6.00 | $25.00 |
| 0090 | Revetment, class E (2507-6800061) | TON | 130 | $100.00 | $71.00 | $100.00 | $55.00 |
| 0100 | Construction survey, control point survey (2526-8285020) | LS | 1 | $1,500.00 | $2,470.00 | $1,470.00 | $1,804.00 |
| 0110 | Construction survey, location survey (2526-8285040) | LS | 1 | $1,000.00 | $7,930.00 | $830.00 | $1,804.00 |
| 0120 | Traffic control (2528-8445110) | LS | 1 | $2,500.00 | $11,295 | $2,150.00 | $2,500.00 |
| 0130 | Flaggers (2528-8445113) | EACH | 20 | $660.00 | $660.00 | $660.00 | $660.00 |
| 0140 | Patches, full-depth finish, by area (2529-5070110) | SY | 50 | $420.00 | $363.00 | $600.00 | $363.00 |
| 0150 | Patches, full-depth finish, by count (2529-5070120) | EACH | 2 | $250.00 | $166.00 | $270.00 | $166.00 |
| 0160 | Rumble strip panel (in full depth patch) (2529-8202000) | EACH | 1 | $750.00 | $500.00 | $500.00 | $500.00 |
| 0170 | Mobilization (2533-4980005) | LS | 1 | $22,500 | $28,000 | $30,000 | $32,000 |
| 0180 | Stabilized construction entrance, EC303 (2602-0000150) | LF | 200 | $100.00 | $120.00 | $225.00 | $88.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from Iowa DOT's tabulation for this contract. Iowa DOT bid tabulation PDFs: the letting of 19 January 2022 (read from the Internet Archive's copy of Iowa DOT's file) and lettings of August to October 2026. On A+B contracts the item total is kept and the time part dropped. Bids that did not match their published total are left out.
Every contract let that day: Iowa DOT letting of September 29, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.