Iowa DOT contract 92-0925-712 bid tabulation
Pcc Patching - IOWA 92 Keokuk Co Line to 0.2 mi E of Elm Ave. Let by Iowa DOT on August 18, 2026, Washington. 4 bids received; low bid $124,764 by Cedar Falls Construction Co., Inc..
- Owner
- Iowa DOT
- Letting
- 18 AUG 2026
- Pay items
- 9
- Data through
- 20 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Cedar Falls Construction Co., Inc. | $124,764 | Low |
| 2 | Midwest Contractors, Inc. | $139,558 | +12% |
| 3 | Hawkeye Paving Corp. | $154,540 | +24% |
| 4 | Iowa Civil Contracting, Inc. | $181,630 | +46% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cedar Falls Construction Co., Inc. | 2. Midwest Contractors, Inc. | 3. Hawkeye Paving Corp. | 4. Iowa Civil Contracting, Inc. |
|---|---|---|---|---|---|---|---|
| 0010 | Traffic control (2528-8445110) | LS | 1 | $660.00 | $2,000.00 | $500.00 | $4,950.00 |
| 0020 | Flaggers (2528-8445113) | EACH | 20 | $660.00 | $660.00 | $660.00 | $660.00 |
| 0030 | Pilot cars (2528-8445115) | EACH | 10 | $990.00 | $990.00 | $990.00 | $990.00 |
| 0040 | CD joint assembly (2529-2242304) | EACH | 8 | $120.00 | $120.00 | $150.00 | $175.00 |
| 0050 | CT joint (2529-2242320) | EACH | 11 | $200.00 | $220.00 | $200.00 | $265.00 |
| 0060 | Patches, full-depth finish, by area (2529-5070110) | SY | 81.20 | $147.50 | $164.00 | $205.00 | $266.00 |
| 0070 | Patches, full-depth finish, by area (50 feet or greater in length) (2529-5070111) | SY | 533.30 | $147.50 | $167.00 | $183.00 | $185.00 |
| 0080 | Patches, full-depth finish, by count (2529-5070120) | EACH | 9 | $245.00 | $300.00 | $1,200.00 | $445.00 |
| 0090 | Mobilization (2533-4980005) | LS | 1 | $5,000.00 | $6,000.00 | $2,500.00 | $25,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from Iowa DOT's tabulation for this contract. Iowa DOT bid tabulation PDFs: the letting of 19 January 2022 (read from the Internet Archive's copy of Iowa DOT's file) and lettings of August to October 2026. On A+B contracts the item total is kept and the time part dropped. Bids that did not match their published total are left out.
Every contract let that day: Iowa DOT letting of August 18, 2026. Compiled by Mirage Metrics.