Iowa DOT letting results, January 19, 2022
93 contracts let by Iowa DOT on January 19, 2022, $171,706,347 in low bids, a median of 3 bidders per contract.
- Owner
- Iowa DOT
- Contracts
- 93
- Low bids, total
- $171,706,347
- Data through
- 20 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 79-0805-359 | Traffic Signs - I-80, 1 mi W of IA 146 to 2 mi E of IA 146 (WB) | Poweshiek | 2 | Manatt'S, Inc. | $23,494,703 | $23,897,408 | +2.0% | Iowa DOT |
| 77-1945-848 | Bridge Rehabilitation - 2ND AVENUE, In the city of Des Moines, On 2nd Avenue Bridge, Over Des Moines River and Birdland Drive | Polk | 1 | Jasper Construction Services, Inc. | $9,983,441 | Iowa DOT | ||
| 18-0597-051 | Hma Resurfacing/Cold In-Place Recycling - U.S. 59, N of IA 3 to E Jct IA 10 | Cherokee | 4 | Heartland Asphalt, Inc. | $7,960,519 | $8,460,596 | +6.0% | Iowa DOT |
| 22-0761-016 | Pcc Pavement - Replace - IOWA 76, In McGregor from Buell Ave to River St | Clayton | 4 | Portzen Construction, Inc. | $7,512,964 | $8,612,530 | +15% | Iowa DOT |
| 86-0635-072 | Pcc Overlay - U.S. 63, N of Wolfe Creek Bridge in Traer to 0.5 mi S of Jct. Iowa 58 | Black Hawk, Tama | 1 | Croell, Inc. | $7,462,313 | Iowa DOT | ||
| 78-0921-077 | Hma Resurfacing - IOWA 92, Treynor to Carson | Pottawattamie | 2 | Henningsen Construction, Inc. | $5,711,167 | $5,794,047 | +1.0% | Iowa DOT |
| 82-0741-290 | Hma Resurfacing With Milling - I-74, I-80 to the Middle Rd Interchange (EB/WB) | Scott | 4 | Valley Construction Co. | $4,531,752 | $4,548,554 | 0.0% | Iowa DOT |
| 39-C039-098 | Hma Resurfacing - F32, On F32, from Guthrie Center approx 14 miles to N46 | Guthrie | 3 | Henningsen Construction, Inc. | $4,403,823 | $4,628,461 | +5.0% | Iowa DOT |
| 97-7057-708 | Pcc Pavement - Grade & Replace - STONE PARK BOULAVRD, In the city of Sioux City, On Stone Park Blvd, from West Clifton St to Broken Kettle Road | Woodbury | 2 | Sioux City Engineering Co. | $3,992,797 | $4,999,916 | +25% | Iowa DOT |
| 12-C012-121 | Hma Resurfacing / Heater Scarification - T47, On T47 from Hwy 57 N 12 miles to Hwy 3 | Butler | 2 | Heartland Asphalt, Inc. | $3,917,038 | $4,079,216 | +4.0% | Iowa DOT |
| 36-2751-043 | Lighting - U.S. 275, S Jct IA 2 | Fremont | 2 | Western Engineering Co., Inc. | $3,869,540 | $4,060,936 | +5.0% | Iowa DOT |
| 11-0072-035 | Pcc Pavement - Grade & Replace - IOWA 7, In the city of Storm Lake, On 90TH AVE/IA 7/IA 110, S32 T91 R37 | Buena Vista | 1 | Godbersen-Smith Construction Co. & Subsid. | $3,866,040 | Iowa DOT | ||
| 73-C073-142 | Hma Resurfacing/Cold In-Place Recycling - M63, On O Avenue (M63), from IA 2 north 11 Miles to Page/ Montgomery County Line | Page | 2 | Henningsen Construction, Inc. | $3,336,647 | $3,523,279 | +6.0% | Iowa DOT |
| 74-C074-108 | Pcc Pavement Widening / Pcc Resurfacing - B63, On B63, from 525th Ave East Approximately 4.5 Miles to City Limits of West Bend | Palo Alto | 3 of 5 | Godbersen-Smith Construction Co. & Subsid. | $3,268,032 | $3,313,276 | +1.0% | Iowa DOT |
| 05-75 | Hma Pavement Widening / Hma Resurfacing - F32, On Audubon Co. Hwy. F32, from US Hwy 71 E 11 miles to Guthrie County Hwy. N46 | Audubon, Guthrie | 3 | Western Engineering Co., Inc. | $3,267,088 | $3,366,474 | +3.0% | Iowa DOT |
| 39-0444-047 | Hma Resurfacing - IOWA 44, ECL of Guthrie Center to WCL of Panora | Guthrie | 3 | Western Engineering Co., Inc. | $3,206,562 | $3,307,823 | +3.0% | Iowa DOT |
| 97-0121-043 | Hma Resurfacing With Milling - IOWA 12, In Sioux City, from US 20 to Gordon Dr Viaduct | Woodbury | 1 | Knife River Corporation D/B/A Knife River Midwest LLC | $3,080,172 | Iowa DOT | ||
| 18-0597-049 | Pavement Planing/Grooving - U.S. 59, Linden St to S of IA 3 in Cherokee | Cherokee | 2 | Iowa Civil Contracting, Inc. | $2,954,482 | $3,043,370 | +3.0% | Iowa DOT |
| 16-C016-112 | Hma Resurfacing With Milling - Y14, On Y14 (Hoover Highway), from State Highway 130 North 8.7 Miles to State Highway 30 | Cedar | 3 | Manatt'S, Inc. | $2,834,522 | $3,214,694 | +13% | Iowa DOT |
| 82-4252-603 | Bridge Replacement - Ppcb - TERRITORIAL ROAD, In the city of Le Claire, On Territorial Rd, Over McCarty Creek | Scott | 4 | Helm Group, Inc., D/B/A Helm Civil | $2,813,147 | $2,963,959 | +5.0% | Iowa DOT |
| 37-1443-024 | Hma Resurfacing/Cold In-Place Recycling - IOWA 144, 230th St in Grand Junction to the NCL's of Dana | Greene | 4 | Fort Dodge Asphalt Company, Inc. | $2,584,809 | $2,651,931 | +3.0% | Iowa DOT |
| 94-C094-130 | Hma Resurfacing With Milling - VARIOUS LOCATIONS, Div.1 On C66 from Pocahontas County Line to 1900(cid:25) East of P29. Div. 2 On P29 From C66 to Humboldt Count | Webster | 3 | Fort Dodge Asphalt Company, Inc. | $2,560,468 | $2,871,469 | +12% | Iowa DOT |
| 78-0801-530 | Guardrail - I-80, Franklin Ave Bridges to Co Rd G30 Interchange | Pottawattamie | 3 | Dave Gryp Construction, Inc. $2,459,602.96 $210,000.00 | $2,459,603 | $2,620,360 | +7.0% | Iowa DOT |
| 40-C040-105 | Hma Resurfacing/Cold In-Place Recycling - D41, On D41, from US 69 E 9 miles to HARDIN COUNTY | Hamilton | 3 | Manatt'S, Inc. | $2,430,296 | $2,515,210 | +3.0% | Iowa DOT |
| 85-C085-164 | Hma Resurfacing - R38, On R38, from Slater City Limits north 8.0 Miles | Story | 4 | Manatt'S, Inc. | $2,359,127 | $2,550,702 | +8.0% | Iowa DOT |
| 53-0383-061 | Pcc Sidewalk/Trail - IOWA 38, In the City of Monticello (ADA - District 6) | Jones | 4 | Pelling, L.L. Co., Inc. | $2,328,361 | $2,408,502 | +3.0% | Iowa DOT |
| 42-0571-036 | Hma Resurfacing - IOWA 57, W of Fairview Dr in Ackley to 13th St in Aplington | Hardin | 2 | Heartland Asphalt, Inc. | $2,320,506 | $2,561,516 | +10% | Iowa DOT |
| 83-1732-005 | Hma Resurfacing/Cold In-Place Recycling - IOWA 173, Cass Co Line to 0.25 mi S of Co Rd F58 in Elk Horn | Shelby | 2 | Henningsen Construction, Inc. | $2,301,561 | $2,464,613 | +7.0% | Iowa DOT |
| 56-2697-634 | Bridge Replacement - Ccs - F AVENUE, In the city of Fort Madison, On AVENUE F, Over FRENCH CREEK | Lee | 1 | Iowa Bridge & Culvert, L.C. | $2,032,011 | Iowa DOT | ||
| 49-0621-025 | Pcc Sidewalk/Trail - U.S. 52, In the City of Bellevue (ADA - District 6) | Jackson | 4 | Midwest Concrete, Inc. | $2,023,113 | $2,042,217 | +1.0% | Iowa DOT |
| 99-0174-040 | Bridge And Approaches - Ppcb - IOWA 17, Prairie Creek 0.9 mi N of Co Rd C26 | Wright | 3 | Minnowa Construction,Inc. | $1,993,036 | $1,999,710 | 0.0% | Iowa DOT |
| 91-1945-857 | Bridge Replacement - Ccs - SW 9TH STREET, In the city of Des Moines, On SW 9TH ST, Over MIDDLE S CREEK, S9 T77 R24 | Warren | 1 | Herberger Construction Co., Inc. | $1,987,042 | Iowa DOT | ||
| 42-C042-109 | Hma Resurfacing - S75, On S 75, from 340th Street N 3 miles to 310th Street | Hardin, Marshall | 4 | Omg Midwest, Inc., D/B/A Cessford Construction | $1,790,626 | $1,853,975 | +4.0% | Iowa DOT |
| 05-C005-074 | Hma Resurfacing - M66, On M 66, from US IA 44 N 4 miles to F37 S19 T79 R36 | Audubon | 2 | Henningsen Construction, Inc. | $1,776,380 | $2,080,922 | +17% | Iowa DOT |
| 08-0304-107 | Hma Resurfacing With Milling - U.S. 30, 0.5 mi E of IA 17 to 230th St | Boone | 3 | Manatt'S, Inc. | $1,711,389 | $1,997,276 | +17% | Iowa DOT |
| 68-0052-047 | Hma Resurfacing With Milling - IOWA 5, 3rd Ave to BNSF RR Underpass N of C Ave in Albia | Monroe | 3 | TK Concrete, Inc. | $1,492,178 | $1,498,849 | 0.0% | Iowa DOT |
| 60-C060-123-A | Bridge Replacement - Ccs - K60, On K 60, Over TOM CREEK, S30 T100 R44 | Lyon | 3 | Dixon Construction Co. | $1,345,519 | $1,482,998 | +10% | Iowa DOT |
| 85-0695-126 | Hma Pavement Widening - U.S. 69, Co Rd E57 Intersection | Story | 3 | Peterson Contractors Inc. | $1,324,321 | $1,726,514 | +30% | Iowa DOT |
| 24-0595-054 | Pipe Culverts - U.S. 59, 1.45 mi N of Co Rd E59 to 1.5 mi N of Co Rd E53 | Crawford | 5 | Iowa Trenchless LC | $1,247,583 | $1,266,185 | +1.0% | Iowa DOT |
| 80-C080-079 | Seal Coat - P64, On P64, from HWY 2 N 9.0 miles to J20 | Ringgold | 4 | Asphalt Surface Technologies Corporation A/K/A | $1,202,185 | $1,274,871 | +6.0% | Iowa DOT |
| 57-1452-601 | Bridge Replacement - Ppcb - 3RD ST, In the city of Coggon, On N 3RD ST, Over BUFFALO CREEK, S3 T86 R06 | Linn | 3 | Jim Schroeder Construction, Inc. | $1,183,990 | $1,423,976 | +20% | Iowa DOT |
| 40-1757-023 | Hma Paved Shoulder - New - IOWA 175, E of US 69 in Jewell to 0.2 mi W of Delphi St in Ellsworth | Hamilton | 4 | Manatt'S, Inc. | $1,091,974 | $1,225,365 | +12% | Iowa DOT |
| 19-C019-107 | Bridge Replacement - Ccs - KENWOOD AVE, On KENWOOD AVE, Over EAST WAPSIPINICON RIVER, on WLINE S24 T96 R13 | Chickasaw | 4 | Minnowa Construction,Inc. | $1,047,234 | $1,090,960 | +4.0% | Iowa DOT |
| 78-0801-501 | Landscaping - I-80, South Expressway to US 275 | Pottawattamie | 3 | Executive Companies, Inc. D/B/A Executive Design | $1,044,028 | $1,065,344 | +2.0% | Iowa DOT |
| 85-C085-165 | Hma Resurfacing - S27, On S27, from 295th St. North 5.5 Miles to Hwy 30 | Story | 3 | Manatt'S, Inc. | $984,438 | $1,118,365 | +14% | Iowa DOT |
| 92-8140-613 | Pcc Overlay - LEXINGTON BLVD, In the city of Washington, On LEXINGTON BLVD, from North D Avenue W 1.79 miles to west of City Limits | Washington | 6 | Jones Contracting Corp. | $969,708 | $1,062,409 | +10% | Iowa DOT |
| 22-C022-094 | Bridge Replacement - Ccs - 250th STREET, On 250TH ST, Over DRY MILL CREEK, in N1/4 S20 T93 R04 | Clayton | 3 | K Construction Inc. | $883,350 | $1,065,037 | +21% | Iowa DOT |
| 76-C076-073 | Bridge Replacement - Ccs - C49, On C 49, Over LIZARD CK DD #53, S31 T91 R31 | Pocahontas | 4 | Merryman Bridge Construction Co. | $700,131 | $859,938 | +23% | Iowa DOT |
| 51-0012-034 | Bridge Deck Overlay - IOWA 1, Middle Walnut Creek 3.1 mi S of S Jct IA 78 | Jefferson | 3 | Hawkeye Paving Corp. | $687,352 | $708,715 | +3.0% | Iowa DOT |
| 92-2183-087 | Bridge Deck Overlay - U.S. 218, N Fork Long Creek 1.0 mi S of IA 92 (NB) | Washington | 4 | Brandt Construction Co. & Subsidiary | $608,690 | $655,707 | +8.0% | Iowa DOT |
| 90-0347-144 | Bridge Deck Overlay - U.S. 34, Bear Creek 1.2 mi W of Co Rd H35 | Wapello | 3 | Jasper Construction Services, Inc. | $555,451 | $558,959 | +1.0% | Iowa DOT |
| 82-1306-500 | Bridge Painting - IOWA 130, At the I-80 Interchange (EB/WB) | Scott | 5 | Southern Coatings of Tarpon Springs, LLC | $519,788 | $594,212 | +14% | Iowa DOT |
| 24-C024-128 | Bridge Replacement - Ccs - H AVENUE, On H Ave crossing East Boyer River, North Line Section 11 Westside Twp. | Crawford | 4 | Murphy Heavy Contracting Corp. | $517,207 | $517,220 | 0.0% | Iowa DOT |
| 73-C073-143 | Seal Coat - VARIOUS ROUTES, On 230TH ST, Over WEST NODAWAY RIVER, 11.5 miles | Page | 5 | Blacktop Service Co. & Subsidiary | $488,191 | $541,998 | +11% | Iowa DOT |
| 90-0347-145 | Bridge Deck Overlay - U.S. 34, Bardell St 0.5 mi E of IA 149 in Ottumwa (WB) | Wapello | 3 | Hawkeye Paving Corp. | $416,840 | $434,795 | +4.0% | Iowa DOT |
| 18-0032-079-A | Pcc Pavement - Grade And New - IOWA 3, IA 143 Intersection | Cherokee | 6 | Croell, Inc. | $406,136 | $423,704 | +4.0% | Iowa DOT |
| 08-C008-086 | Pcc Sidewalk/Trail - BOONE TRAIL, High Trestle to City of Boone Trail - Phase 1 | Boone | 3 | Caliber Concrete, LLC | $399,709 | $423,882 | +6.0% | Iowa DOT |
| 18-83 | Rcb Culvert Replacement - Triple Box - 470TH STREET, On 470th St, Over WEST FORK LITTLE SIOUX, 0.19 mile W of the intersection of 470th St and G Ave S36 T93 R42 | Cherokee | 3 | Dixon Construction Co. | $381,099 | $465,522 | +22% | Iowa DOT |
| 48-0806-727 | Pcc Patching - I-80, Poweshiek Co Line to Scott Co Line | Iowa | 3 | Cedar Falls Construction Co., Inc. | $379,621 | $395,296 | +4.0% | Iowa DOT |
| 18-84 | Rcb Culvert Replacement - Twin Box - 500TH STREET, On 500th St, Over BADGER CREEK, 0.28 miles W of the intersection of 500th St and T Ave S7 T92 R39 | Cherokee | 5 | Dixon Construction Co. | $376,964 | $381,489 | +1.0% | Iowa DOT |
| 48-93 | Hma Resurfacing - W16, On W16, from Hwy 6 S 0.6 miles to End of Paving | Iowa | 2 | Pelling, L.L. Co., Inc. | $375,733 | $454,058 | +21% | Iowa DOT |
| 57-1516-739 | Pcc Patching - IOWA 13, N of Manchester to S Jct IA 3 | Delaware, | 4 | Midwest Contractors, Inc. | $359,679 | $474,217 | +32% | Iowa DOT |
| 52-0015-115 | Slide Repair - IOWA 1, 1.7 mi N of I-80 | Johnson | 8 | Dirty30 Excavating & Trucking LLC | $354,102 | $362,946 | +2.0% | Iowa DOT |
| 63-0055-509 | Bridge Painting - IOWA 5, At the IA 14 Interchange (NB/SB) | Marion | 8 | Omega Coatings & Construction, LLC | $351,600 | $384,500 | +9.0% | Iowa DOT |
| 33-C033-145 | Bridge Replacement - Ccs - H AVE, On H AVE, Over GUNDLACH CR, S13 T91 R08 | Fayette | 5 | K Construction Inc. | $347,871 | $389,673 | +12% | Iowa DOT |
| 04-0027-052 | Bridge Deck Overlay - IOWA 2, Walnut Creek 0.8 mi E of Co Rd S70 | Appanoose | 3 | Jasper Construction Services, Inc. | $342,130 | $343,300 | 0.0% | Iowa DOT |
| 99-C099-100 | Pipe Culverts - R75, On R75, Over Sheldon Creek, at Ctr S27 T90 R23 | Wright | 7 | Weidemann Inc. | $330,321 | $347,609 | +5.0% | Iowa DOT |
| 96-0525-045 | Bridge Deck Overlay - U.S. 52, Upper Iowa River 1.8 mi N of IA 9 | Winneshiek | 4 | Wicks Construction, Inc. | $316,977 | $354,987 | +12% | Iowa DOT |
| 82-0741-262 | Bridge Cleaning - I-74, Mississippi River in Bettendorf (NB/SB) | Scott | 4 | McClain & Co., Inc. | $301,474 | $312,250 | +4.0% | Iowa DOT |
| 74-C074-110 | Rcb Culvert New - Twin Box - 570TH AVENUE, On 570TH AVE, Over STREAM, S1 T95 R31 | Palo Alto | 4 | Dixon Construction Co. | $295,953 | $369,303 | +25% | Iowa DOT |
| 63-C063-141 | Hma Resurfacing With Milling - G76, On G 76, from IA 5 to Van Buren Dr. S11 T74 R19 | Marion | 2 | Norris Asphalt Paving Co., LC | $290,963 | $364,076 | +25% | Iowa DOT |
| 85-C085-166 | Pipe Culverts - 730TH AVE, On 730th Ave., Over No name stream, NW1/4 S12 T84 R21 | Story | 12 | Peterson Contractors Inc. | $288,713 | $297,904 | +3.0% | Iowa DOT |
| 18-82 | Rcb Culvert Replacement - Twin Box - V AVENUE, On V Ave, 0.12 mile S of the intersection of 560th St and V Ave S15 T91 R39 | Cherokee | 4 | Dixon Construction Co. | $287,757 | $386,769 | +34% | Iowa DOT |
| 86-0081-016 | Rcb Culvert Replacement - Single Box - IOWA 8, Rock Creek 0.4 mi W of W Jct IA 21 | Tama | 5 | Progressive Structures, LLC | $270,700 | $286,073 | +6.0% | Iowa DOT |
| 69-0344-504 | Bridge Painting - U.S. 34, East Nishnabotna River 0.5 mi W of IA 48 | Montgomery | 8 | Pacific Painting Co., Inc. | $263,550 | $293,676 | +11% | Iowa DOT |
| 31-0209-240 | Bridge Cleaning - U.S. 20, Mississippi River in Dubuque | Clinton, Dubuque | 6 | A & A Painting, LLC. | $249,675 | $284,675 | +14% | Iowa DOT |
| 27-0025-501 | Bridge Painting - IOWA 2, I-35 Interchange | Decatur | 7 | Southern Coatings of Tarpon Springs, LLC | $247,386 | $260,523 | +5.0% | Iowa DOT |
| 51-4650-601 | Rcb Culvert Replacement - Twin Box - 175TH STREET, In the city of Maharishi Vedic City, On 175TH ST, Over CREEK, S9 T72 R10 | Jefferson | 2 | Iowa Bridge & Culvert, L.C. | $236,396 | $283,245 | +20% | Iowa DOT |
| 07-3802-710 | Hma Resurfacing With Milling - I-380, Indian Creek 2.1 mi S of US 20 (NB) | Black Hawk | 1 | Aspro, Inc. | $226,058 | Iowa DOT | ||
| 00-000T-200 | Traffic Signs - VARIOUS ROUTES, Various Locations in District 3 | Statewide | 7 | Voltmer, Inc. | $225,435 | $234,700 | +4.0% | Iowa DOT |
| 78-0294-513 | Bridge Painting - I-29, Basswood Rd 2.6 mi S of IA 92 | Pottawattamie | 6 | Southern Coatings of Tarpon Springs, LLC | $211,100 | $217,600 | +3.0% | Iowa DOT |
| 57-0131-070 | Landscaping - IOWA 13, N of County Home Rd to S of Bunker Hill Rd | Linn | 3 | Landscaping Solutions of Iowa, LLC | $176,006 | $177,410 | +1.0% | Iowa DOT |
| 19-C019-108 | Pavement Markings - VARIOUS ROUTES, Pavement Markings on Various County Roads. | Chickasaw | 2 | Vogel Traffic Services, Inc. | $172,675 | $189,423 | +10% | Iowa DOT |
| 77-2352-661 | Landscaping - I-235, SW I-35/80 Interchange to NE I-35/80 Interchange | Polk | 2 | Jasper Construction Services, Inc. | $168,390 | $249,900 | +48% | Iowa DOT |
| 12-1882-500 | Hma Resurfacing With Milling - IOWA 14, Drainage Ditch 1.4 mi S of S Jct IA 3 | Butler | 1 | Heartland Asphalt, Inc. | $143,127 | Iowa DOT | ||
| 31-1516-501 | Hma Resurfacing - U.S. 151, Cascade northeasterly 10 miles - Various Bridge Locations | Dubuque | 1 | Mathy Construction Company D/B/A River City Paving | $140,575 | Iowa DOT | ||
| 05-0300-604 | Pcc Sidewalk/Trail - Rec Center Trail, In the city of Audubon, Rec Center Link Trail from N of Stadium Dr to S of Southside Ave. | Audubon | 6 | Bluffs Paving & Utility Company. Inc. | $119,938 | $138,068 | +15% | Iowa DOT |
| 77-0801-507 | Bridge Repair - I-80, IA 141 and NS RR at IA 141 Interchange (EB/WB) | Polk | 5 | Jasper Construction Services, Inc. | $86,780 | $94,495 | +9.0% | Iowa DOT |
| 22-0526-501 | Debris Removal - U.S. 52, Turkey River 0.16 mi N of Co Rd C53 | Clayton, Jones | 8 | Boomerang Corp. | $72,600 | $78,600 | +8.0% | Iowa DOT |
| 97-0293-501 | Bridge Repair - I-29, Floyd River 3.5 mi N of IA 376 (SB) | Woodbury | 3 | Minturn, Inc. | $46,000 | $57,500 | +25% | Iowa DOT |
| 77-C077-236 | Traffic Signs - NE 108TH STREET, On NE 108TH ST at HWY 163, S35 T79 R22 | Polk | 4 | K & W Electric, Inc. | $15,965 | $21,555 | +35% | Iowa DOT |
| 77-C077-235 | Traffic Signs - NE 56TH STREET, On NE 56TH ST at NE 94th Ave, S23 T80 R23 | Polk | 4 | K & W Electric, Inc. | $11,960 | $14,793 | +24% | Iowa DOT |
| 79-0806-500 | Pavement Planing/Grooving - I-80, Approx 1 mi E of US 63 to E of the Iowa Co Line (EB/WB) | Poweshiek | 2 of 5 | Iowa DOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than Iowa DOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.